Electrical Engineer (m/w/d)
BELECTRIC
Company Overview
BELECTRIC GmbH, part of the Elevion Group
Kolitzheim, Germany
2001
Over 600 employees worldwide (Source: cez.cz). Revenue data for 2023 or later is not publicly available.
What They Do
BELECTRIC primarily focuses on solar photovoltaics and specializes in the development, planning, procurement, construction (EPC), operation, and maintenance (O&M) of utility-scale solar parks. The company also offers expertise in areas such as floating PV, Agri-PV, and rooftop systems for commercial and residential sectors. Additionally, BELECTRIC develops standalone battery storage and hybrid systems that combine PV with battery storage or wind power (Source: belectric.com). Their products include large-scale PV systems, grid connection services, and the patented 3.0 MegaWattBlock hybrid solution, which enables 24/7 energy supply. These solutions are suitable for both grid-connected and off-grid applications (Source: belectric.com). BELECTRIC serves a variety of target groups, including utilities, energy companies, developers, and banks, providing tailored solutions for specific business needs.
Projects & Track Record
BELECTRIC has completed over 500 PV projects worldwide with a total capacity of more than 5.6 GW. This includes the 114 MWp solar project Borrentin in Mecklenburg-Vorpommern, which was commissioned in 2023 for ENCAVIS and generates 121 GWh annually for electric vehicle charging (Source: belectric.com). Another significant project is the 96 MW Herleshof project near Kolitzheim, which produces 105 GWh annually with 165,000 bifacial modules and plans for a future expansion of 35 MW/70 MWh battery storage (Source: pv-tech.org). Additionally, BELECTRIC has realized three solar parks in the Netherlands for Kronos Solar with a total capacity of 57 MWp, which were commissioned by early 2022 and supply power to 18,000 households (Source: belectric.com). The company is currently working on the 189 MWp Eekerpolder solar park in Groningen, the largest in Dutch history and BELECTRIC's largest project in Europe.
Recent Developments
In 2025, BELECTRIC secured the contract for the 189 MWp Eekerpolder project, the largest in Europe, raising the installed capacity in the Netherlands to nearly 500 MW and over 5 GW worldwide (Source: belectric.com). The company has commissioned the 114 MWp solar project Borrentin for ENCAVIS, increasing the installed capacity in Germany to over 1.2 GWp (Source: belectric.com). The 96 MW Herleshof plant near the headquarters has also been commissioned, with plans for a future 35 MW/70 MWh battery storage expansion to stabilize the power grid (Source: pv-tech.org). BELECTRIC has established itself as a leading company in energy storage solutions and was recognized as Europe's top provider of energy storage solutions in 2019 (Source: energytechreview.com).
Working There
BELECTRIC employs over 600 people worldwide, with the majority working in development, EPC, O&M, engineering, and project management. The main employment is at the headquarters in Kolitzheim, Germany, where over 300 employees work, as well as in subsidiaries in the Netherlands, UK, France, Italy, Israel, and Denmark (Source: belectric.com). The company culture emphasizes teamwork, respect, and professionalism, as demonstrated by the rapid execution of projects like Borrentin (Source: belectric.com). Although specific benefits are not detailed, being part of the Elevion Group provides financial stability and long-term O&M contracts, indicating security in a growing solar company (Source: belectric.com).
Contact
Last updated on 2025-12-27 | Report an issue
Job Description
Are you passionate about electrical design and ready to take on exciting challenges in the energy storage sector? We're looking for a skilled BESS Electrical Engineer to join our team and play a key role in shaping the DC and AC installations of cutting-edge energy storage projects. If you enjoy working hands-on with layouts, schematics, technical specs, and collaborating across teams to bring innovative solutions to life, then join our team!
- Electrical design engineering for DC and AC installations in energy storage projects
- Reviewing design specifications, technical drawings, and tender documents to inform design decisions, assess risks, and ensure compliance with requirements
- Coordinating and negotiating technical specifications and supply agreements with BESS OEMs
- Collaborating closely with technical advisors, sales, procurement, construction teams, and other departments
- Managing project timelines to ensure engineering designs are delivered on schedule
- Assisting in preparing as-built documentation, calculations, and technical reports after project completion
Your profile
- Completed studies in the field of electrical engineering or comparable qualification
- Must Have: Experience with energy storage (consultancy, DNO, ICP, renewable energy developer or another engineering environment)
- Must Have: Knowledge and understanding of international and UK electrical standards
- Nice to Have: Knowledge of AutoCAD, G99 applications, electrical design softwares (eplan) or simulation softwares (PVSyst)
- Your skills: communicative teamplayer (m/f/d) with a structured and well-organized method of work
- Willingess to travel (Driving license required)
What we offer
As an innovative company, we offer a dynamic and goal-orientated working environment. Enjoy flexible mobile working, full health insurance cover and up to 33 days off. We support your future with up to 6% employer pension contributions and 4 times life insurance. Performance counts for us, which is why our work is bonus-based and KPI-driven. Occupational safety and a good work-life balance are very important to us, therefore we attach great importance to your personal protective equipment and are committed to your safety, growth and well-being every step of the way.
Your way to us
Sarah Morris
HR Assistant
Tel. +44 773076-1606
[email protected]
Suzanna Mendes
HR Assistant
Tel. +44 793940-1615
[email protected]
Get Job Alerts
Get alerts for Energy Storage jobs in Brinkworth, United Kingdom
About the role
October 3, 2025
Full Time
Company
January 13, 2026
Flexible
- Brinkworth, United Kingdom
Mid-level experience in electrical engineering with a focus on energy storage
UTC+01:00
Apply now
Job expired?Please let BELECTRIC know you found this job on Rejobs. This will help us grow and get more people to work on renewable energy!
Discover how you’re connected
View connectionsSee your contacts at BELECTRIC on LinkedIn to leverage your network in applying for this position.