Project Manager (m/w/d)
Nordex
Company Overview
Nordex SE
Hamburg, Germany
1985
Over 10,900 employees worldwide (Source: linkedin.com). Revenue of over 5.7 billion euros in 2023 (Source: renewable-energy-industry.com).
What They Do
Nordex focuses exclusively on onshore wind turbines in the 4 to 6 MW+ class. The company develops, manufactures, installs, and maintains these turbines through integrated processes that include design, precision engineering, rotor blade and tower production, logistics, turnkey installation, and complete lifecycle maintenance (Source: windindustry-in-germany.com). The core platform Delta4000, introduced in 2017 with the N149/4.X, offers flexible power ratings (4-6 MW) and rotor diameters of up to 175 meters. This platform is optimized for various wind conditions and extreme climates (Source: nordex-online.com). The products cater to various customer segments, including utilities, independent power producers, and community wind projects, providing tailored solutions for site-restricted or grid-limited locations with lifespans of up to 35 years.
Projects & Track Record
In Germany, Nordex has commissioned 8,653 MW of onshore wind power plants, with 4,946 MW under construction, including the first wind farm in Hamburg featuring N27/150 turbines that have been operational for over 32 years (Source: nordex-online.com). A prototype of the N175/6.X on a 179 m high hybrid tower in Santow, Mecklenburg-Vorpommern, is in pre-series, with installation scheduled for September 2025 and commissioning between October 2025 and January 2026 (Source: nordex-online.com). Globally, Nordex supplies over 52 GW of installed turbines in 85% of markets outside China, with about 1 GW in Canada, including the N163/5.X, N163/6.X, and N175/6.X cold climate models (Source: windindustry-in-germany.com). Key customers include Bürgerwind Hollich GmbH & Co. KG and Energieversorgung Mittelrhein (evm), who engage in long-term partnerships for turnkey projects and maintenance.
Recent Developments
In the past two years, Nordex secured significant contracts in Germany, including 107 MW repowering in North Rhine-Westphalia for Bürgerwind Hollich with 12 N163/6.X on 164 m high hybrid towers (Source: renewable-energy-industry.com). Additional contracts include 21 MW from BMR energy solutions for the "Heinz" site and 77 MW for the Schneifelhöhe wind farm (Source: renewable-energy-industry.com). Milestones include the commissioning of 2,202.2 MW in Germany in the first half of 2025 and the launch of series production of hybrid towers in April 2025 (Source: nordex-online.com). The merger with Acciona Windpower in 2016 remains a key expansion, with no further acquisitions or funding rounds mentioned in the latest sources.
Working There
Nordex employs over 10,900 people in various fields, including development, production, project management, installation, logistics, sales, and service (Source: nordex-online.com). The company culture emphasizes decentralized regional operations for customer proximity and continuous training for technicians to global standards. Training is provided through the Nordex Academy, which includes GWO certifications and practical training on Delta4000 simulators (Source: nordex-online.com). Hiring occurs at the locations in Hamburg and Rostock as well as in production facilities in several countries, with increasing demand for installation and service technicians in North Rhine-Westphalia and Rhineland-Palatinate (Source: renewable-energy-industry.com).
Contact
Last updated on 2025-12-26 | Report an issue
Your Tasks
- Management of an interdisciplinary project team consisting of engineers, production experts, strategic purchasers und many other functions
- Achievement of a development of a "cost of energy" optimal technical system/turbine closely collaborating with all relevant aspects of the value chain, particularly engineering, production, logistics, installation and service
- Various challenging tasks in all project phases, starting at feasibility study, over concept, detailing and prototyping phase up to start of production in an international environment
- Responsible for the achievement of cost, quality and timeline of the project
- Professional project controlling using KPIs like evaluation of the current progress and deviation management
- Implementation of risk- and stakeholder management
- Development of innovative solutions for reduction of time-to-market
- Preparation of decision proposals and project reports for the management board
- Continuous improvement process of the Nordex product development process
Your Profile
- BE/Btech in Mechanical/Electrical graduate with 8+ years of experience in Project Management role from Wind industry.
- Very good knowledge in MS office and MS projectevant stakeholders across the organization, understanding situations and applying a global perspective aligned with company strategy.
- Combining creativity with attention to detail and a systematic and careful way of working.
- Very good MS office skills (including MS Project Server).
- Experience in an ERP and PLM system advantageous.
- Good intercultural understanding, professional working proficiency in English, further language skills beneficial (Spanish/German).
- Multi-annual, sound experience in management of complex projects, product development or similar areas.
Get Job Alerts
Get alerts for Wind Energy jobs in Chennai, Tamil Nadu, India
About the role
January 7, 2026
Full Time
Company
January 9, 2026
On-site
- Chennai, Tamil Nadu, India
8+ years in Project Management in Wind industry
UTC+05:30
Apply now
Job expired?Please let Nordex know you found this job on Rejobs. This will help us grow and get more people to work on renewable energy!
Discover how you’re connected
View connectionsSee your contacts at Nordex on LinkedIn to leverage your network in applying for this position.