Job description
GOLDWIND is a trusted global strategic partner in clean energy. As a company, we are committed to promoting energy transformation to ensure access to affordable, reliable, and sustainable energy for all - further Driving a Renewable Future. Specializing in energy development, energy devices, energy services, and energy use, Goldwind leverages its global network of scientific research innovation and best business practices to take renewable energy utilization and efficiency to new heights. As an SZSE and HKEX listed company, Goldwind has repeatedly been recognized as: "Corporate Climate Leader", "Most Respected Company in Asia", and "Best Investor Relations Company", and awarded "Top 50 Most Innovative Companies in the World", "Carbon Clean200", "Top 500 Global New Energy Companies", "New Fortune Best Listed Companies", "Fortune Top 500 Chinese Companies, and other accolades.
Today, Goldwind's globally installed WTGs are helping mankind save 53.64 million tons of standard coal, reduce 165.82 million tons of carbon dioxide emissions, and reforest an area of 96.20 million cubic meters each year. Since our establishment 24 years ago, we have stayed true to our original aspirations and continue to fulfill our mission of "Innovating for a Brighter Tomorrow".
Project Engineer
Location: Mekong Delta.
Working time: 8:00 - 18:00 (2-hour lunch break), Monday - Saturday.
Key Responsibilities
- Installation of Wind Turbine Units: Responsible for installing wind turbine units and ensuring quality and safety during the installation process.
- Site Cable Laying and Wiring Work: Handle cable laying and wiring tasks at the site.
- Commissioning of Offshore Wind Turbine Units: Responsible for commissioning offshore wind turbine units.
- Swift Issue Response and Troubleshooting: Quickly address electrical, mechanical, software issues, and perform component replacements to maintain project continuity.
- Adherence to HSE Standards: Work according to the highest health, safety, and environmental (HSE) standards while meeting project targets.
- Other Assigned Tasks: Perform additional tasks as assigned by line manager.
Requirements
- Experience: 2-3 years of experience in electrical, mechanical, or hydraulic engineering.
- Physical Ability: Capable of climbing wind turbines and performing physically demanding work at heights and in various weather conditions.
- Driver's License: A valid driver's license in Vietnam is desirable.
- Certifications: GWO or other industrial certifications are beneficial.
- HSE Commitment: Understand and commit to maintaining HSE standards in wind farms.
- Language Skills: Good in English (both written and spoken), with Chinese literacy as a plus.
- Teamwork: Enjoy working in teams and communicating with various stakeholders.
About this role
About Goldwind
Company overview
Goldwind Science & Technology Co., Ltd., listed in Shenzhen and Hong Kong with no controlling shareholder
Beijing, China
1998
About 12,100 employees (June 2026); operating revenue of RMB 72.8 billion in 2025
What they do
Goldwind has built a four-in-one business structure that combines wind power manufacturing, services, investment and load-side “Wind Power+” business. According to Bloomberg New Energy Finance (BNEF), it added 29.3 GW of wind capacity worldwide in 2025, a global market share of 17.3%, ranking first in the world for 4 consecutive years; in China it added 25.9 GW, a 21% share, ranking first for 15 consecutive years. In 2025, sales of turbines and components made up 78.6% of its operating revenue, and external turbine sales reached 26.6 GW.
Its wind power services cover more than 21,000 turbines of multiple brands, backed by 10 regional companies, 7 major repair stations and over 300 warehouses worldwide. At the end of June 2026, the wind farms it owns had a cumulative grid-connected attributable capacity of 10.4 GW worldwide. The company also owns 62 water treatment companies in 13 Chinese provinces and has made breakthroughs in newer businesses: green methanol, hybrid towers, energy storage and energy and carbon management. Its global “1+1+6” R&D network employs more than 3,000 R&D professionals.
Projects and track record
At the end of June 2026, Goldwind’s business reached 49 countries, with installed capacity of more than 4 GW in Asia outside China, more than 3 GW in South America, more than 2 GW each in Oceania and Africa, and more than 1 GW each in North America and Europe. In 2025 it topped China’s offshore wind turbine makers for the first time, with 2.09 GW of new offshore capacity and a 37.9% market share.
In Egypt, the expansion phase of the GOSII wind farm installed 20 Goldwind turbines, bringing the project to 650 MW and making it the largest operational wind farm in Africa. Goldwind’s manufacturing base in Camaçari, Bahia, Brazil, covers about 50,000 square metres and serves the wider South American market. At home, its deliveries of steel-concrete hybrid towers passed 3,000, serving more than 240 wind projects in 21 provinces.
Recent developments
In May 2025, Goldwind signed its first wind project in Oman, Riyah 1&2, a 234 MW project and the largest in Oman to date. In October 2025, it signed the 3 GW PIF5 wind project in Saudi Arabia, providing lifecycle solutions from equipment supply to operation and maintenance. On 1 October 2025, a 16 MW floating wind turbine developed with China Three Gorges Corporation was installed in Beihai, Guangxi.
In November 2025, Goldwind’s South Africa Solutions Factory opened in Cape Town, its sixth overseas solutions facility after those in the United States, Australia, Brazil, Pakistan and Vietnam. In January 2026, it installed the first turbine at the Ruisi wind project in Georgia, a 206 MW wind farm that will use 33 Goldwind turbines.
In the first half of 2026, a 20 MW Goldwind offshore turbine was connected to the grid off Fujian, the largest single offshore turbine connected to the grid in a real marine environment worldwide. At the end of June 2026, orders on hand totalled 54.1 GW, and international revenue in the first half of 2026 was RMB 10.9 billion, up about 30% year on year.
In August 2026, phase one of the Ummbila Emoyeni wind farm in South Africa, developed by Seriti Green, entered commercial operation with 25 Goldwind turbines and a total capacity of 155 MW.
Working there
At the end of 2025, the Goldwind group had 11,890 employees, including 3,563 technology staff, 2,487 administrative staff and 2,807 O&M and services staff.
Goldwind set up Goldwind University in September 2011, the first corporate university of a Chinese wind power equipment manufacturer. Depending on length of service, the company covers part of the tuition for continuing education, higher education and professional certifications, and offers two career paths: management and technical specialisation.
Besides its global R&D headquarters in Beijing, Goldwind has R&D bases in Neunkirchen (Germany), Hinnerup (Denmark) and Sydney (Australia), and Goldwind North America has an office in Chicago. The company runs 7 regional centres, 6 global solutions factories and 3 international production bases.