Job description
The Solar Facilities Management Technician will work within a team to perform vegetation maintenance and abatement.
This individual will receive comprehensive on-the-job and classroom-based training pertaining site maintenance and safe work practices.
Essential Duties and Responsibilities
- Ensure that all co-workers and contractors demonstrate safe work practices in accordance with OSHA, NFPA, state and local codes, and Strata Solar O&M safety policies and procedures during the performance of facilities management activities.
- Conduct vegetation maintenance and abatement on solar power generation plants.
- Conduct routine maintenance and repair of vegetation management equipment including, but not limited to mowers, tractors, string-trimmers, hedge trimmers, rotary cutters, tractor implements, and hand tools.
- Ensure that assigned vehicle, tooling, electrical devices, software, and company property are maintained.
- Assist with interdepartmental maintenance activities as needed.
Education and/or Work Experience Requirements
- Must have a valid driver's license with clean driving record.
- Clear understanding of safe work place practices and procedure.
- Ability to take direction and complete tasks with minimal oversight.
- Must have the ability to travel, work on-call during off-shift hours, and weekends.
- Ability to operate in a manner consistent with organizational policies, procedures, and vision.
- Ability to effectively and respectfully communicate with peers, supervisor, and all other individuals both within and outside of the organization.
Physical Requirements/Work Environment
- Work is to be performed in the field and occasionally in the field office.
- Must be able to comply with all safety standards and procedures. Personal protective equipment (PPE) is required- including, but not limited to hard hat, steel toed shoes, safety glasses, and hearing protection.
- Must have the ability to sit, stoop, kneel, bend, stand, or walk short distances for 8-10 hours a day.
- Must be able to lift, push, or pull up to 50 pounds on an occasional basis.
Typical pay for similar roles
EstimateThe middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.
About this role
About Strata Clean Energy
Company overview
Strata Clean Energy (Strata Solar until 2021), privately held and owned by its founders
Durham, North Carolina, United States
2008
More than 600 employees (2026)
What they do
Strata Clean Energy is a fully integrated energy infrastructure company serving utilities, independent power producers (IPPs) and hyperscalers. Its core capabilities span turnkey development, engineering, procurement and construction (EPC), asset ownership and management, operations and capital markets. Through its subsidiary Power Generation Solutions, LLC (PGS), it also delivers substation EPC services for transmission and distribution.
It reports 3.6 GW of installed solar capacity and 1.8 GW of installed storage capacity, and it has a 9 GW active development pipeline. Where interconnection, land, gas supply and load converge and dependable capacity is essential to make a project viable, it adds natural gas generation to its integrated platforms, with renewables kept at the centre.
Projects and track record
Markus and Cathy Wilhelm founded the company in 2008, originally as Solar Tech South. It completed its first 5 MW plant in North Carolina in 2011 and a 50 MW project a year later, and passed 1 GW of installed solar capacity within eight years. It launched its battery energy storage division in 2018 and has since developed nearly 5 GWh of storage projects. To date it has commercialised roughly 240 projects and built more than 285 solar and storage assets across the United States.
At Scatter Wash in Maricopa County, Arizona, Strata led development, construction and asset management for a 1,020 MWh stand-alone battery storage project, and both phases came online in 2025. In 2020 and 2021 it developed Ventura Energy Storage near Oxnard, California, a 100 MW / 400 MWh battery. At the 144 MW Bookers project in Farnham, Virginia, it helped Dominion Energy reach its energy and capacity targets on a site most developers would avoid.
Recent developments
In September 2025, GridStor acquired Strata’s 100 MW / 400 MWh White Tank battery storage project in Arizona, which is expected to enter service in the first half of 2027; Strata will advise on the project until commercial operation begins. In March 2026, FTC Solar signed a five-year, 1 GW tracker supply agreement with Strata.
In April 2026, Strata announced the continued evolution of its vertically integrated model, expanding beyond its heritage in solar and storage development to strengthen its position as a fully integrated energy platform company. In July 2026 it upsized its revolving loan and letter of credit facility by USD 150 million, from USD 300 million to USD 450 million.
Working there
At Strata, 25% of staff come from the military, and the company is committed to hiring veterans at every level. All its interviewers go through anti-bias training, and it recruits from places such as historically Black colleges and universities (HBCUs), military bases, professional groups and community re-entry programmes. Every employee gets 8 paid volunteer hours a year to use with any community group or non-profit organisation.
Its operations and maintenance work is supported by more than 180 full-time O&M professionals and 24/7 monitoring from its Remote Operations Center. In 2025 the O&M division recorded a total recordable incident rate (TRIR) of 0.00, and its construction TRIR was 0.37.