Rejobs
Verkor
Verkor
35 open jobs · Posted 147 days ago

Infrastructure & DevOps Engineer

Join Verkor in Grenoble as an Infrastructure & DevOps intern. Support Kubernetes deployment, automation with Ansible, and monitoring setup in a growing battery gigafactory. This 6-month internship offers hands-on experience in industrial IT infrastructure and teamwork in a dynamic environment.

Salary
Not stated
Location
Grenoble, France
Workplace
On-site
Job type
Internship
Applies on jobs.lever.co

Check your inbox.

On a phone? Apply from a computer later.

Job description

Nous recherchons un.e stagiaire en Infrastructure & DevOps pour rejoindre notre équipe IT basée à Grenoble.

Au sein de l'équipe IT de Verkor, tu participeras activement à la construction et à l'industrialisation de notre infrastructure technique dans un environnement industriel en pleine croissance (gigafactory de batteries).

Il s'agit d'un stage de fin d'études pour une durée de 6 mois.

Missions principales

  • Kubernetes : aide à la configuration, au déploiement et à la maintenance des clusters ; participation aux choix techniques et à l'amélioration continue de la plateforme
  • Déploiement applicatif : configuration et déploiement d'applications dans Kubernetes (Helm charts, manifests, gestion des namespaces, secrets, ingress), industrialisation des mises en production
  • Automatisation & déploiement : création et maintenance de scripts de déploiement avec Ansible et Bash, dans une logique d'Infrastructure as Code
  • Observabilité : configuration et déploiement des outils de monitoring (Prometheus, CheckMK, etc.), mise en place de l'alerting
  • Dashboards Grafana : conception et création de tableaux de bord métiers et techniques pour l'équipe IT
  • Projets transverses : intégration aux projets en cours (migrations, mises en production, sécurisation)
  • Travail en équipe IT directe : pas de support utilisateur - tu es entièrement dédié(e) aux sujets infra/ops

Prérequis

  • Étudiant.e en école d'ingénieur ou Master 2 (informatique, systèmes, DevOps, cybersécurité)
  • Appétence pour Linux, conteneurisation, automatisation et observabilité
  • Curieux(se), autonome, esprit d'équipe
  • Un niveau avancé en anglais est un plus

We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.

About this role

Posted
24 Jun 2026
Sectors
Timezone
UTC+01:00
Experience
Étudiant en école d'ingénieur ou Master 2
Employer verkor.com LinkedIn Verkor

About Verkor

Company overview

Verkor SAS; Renault Group holds 12% of its capital

Grenoble, France

2020

About 1,100 employees (FTE) at the end of 2025

What they do

Verkor designs and manufactures low-carbon lithium-ion battery cells and modules. Its cell range is built for passenger cars and commercial vehicles, off-road machinery and stationary storage systems. Its main products include a 132 Ah pouch cell with an energy density of 450 Wh/L and more than 220 Wh/kg.

For stationary storage, Verkor is developing grid-scale solutions for power networks that need more flexibility as renewable energy grows. In Grenoble, the Verkor Innovation Centre (VIC) brings together research and development, a pilot line commissioned in 2023 and an in-house training centre. The site has a production capacity of 150 MWh a year across 14,000 m², including 4,500 m² of dry rooms, and 250 digital, product and process experts.

Projects and track record

Verkor inaugurated its first gigafactory on 11 December 2025, making low-carbon lithium-ion cells in Bourbourg, near Dunkirk. With an initial capacity of 16 GWh a year, the plant is to create 1,200 direct and 3,000 indirect jobs; it represented an investment of €1.5 billion, almost half of it public aid. In 2025, Verkor delivered more than 95,000 battery cells.

Since its founding in 2020, the company has raised more than €3 billion in financing, including a green loan of more than €1.3 billion secured in May 2024 from 19 banks (16 commercial and 3 public). In March 2025, Verkor presented plans for two new gigafactories in a new industrial zone (ZGI3) developed by the Port of Dunkirk.

Recent developments

In December 2025, Verkor and EDF signed a 12-year nuclear production allocation contract: Verkor will receive a share, rising to 33 MW, of the capacity of EDF’s operating nuclear fleet, with first deliveries planned from 2028. In March 2026, Verkor appointed Jacques Esculier chair of its supervisory board, as the gigafactory entered its final validation phase.

In August 2026, Verkor announced the commissioning of its gigafactory’s second production line and the delivery of the first batteries produced entirely on site, intended in particular for the new Alpine A390 GTS. Laurent Debrue, previously deputy managing director and COO, became President and CEO in September 2026; co-founder Benoit Lemaignan joined the supervisory board as Vice-Chairman.

Working there

Verkor brings together more than 40 specialist trades, from electrochemistry research and algorithm development (data and AI) to running automated industrial processes and managing the supply chain. Work takes place in dry rooms and on production lines where personal protective equipment is mandatory, or in open-plan offices in Grenoble or Dunkirk.

In 2025, the workforce spanned 50 nationalities and was 24.6% women. All employees have collective health insurance paid for by the company, and an employee shareholding scheme is open to all. With France Travail, the Hauts-de-France Region and GEIQ, Verkor designed a training and recruitment path without CVs for people with no previous industrial experience.

More energy storage jobs like this

Infrastructure & DevOps Engineer
Verkor