Job description
We are a fusion power company based in Everett, WA, with the mission to build the world's first fusion power plant, enabling a future with unlimited clean electricity. Our vision is a world with clean, reliable, and affordable energy for everyone.
Since Helion's founding in 2013, we have raised $1.5 billion from long-time investors such as Sam Altman, Mithril, and Capricorn Investment Group as well as new investors including Thrive Capital, LightSpeed Venture Capital, SoftBank, and others to propel us forward. Our current prototype, Polaris, has reached record-breaking plasma temperatures of 150 million degrees Celsius (13 keV). Helion is continuing to iterate and on the path to the world's first fusion power plant, Orion.
This is a pivotal time to join Helion. You will tackle real-world challenges with a team that prizes urgency, rigor, ownership, and a commitment to delivering hard truths - values essential to achieving what no one has before. Together, we will change the future of energy, because the world can't wait.
What You Will Be Doing
You will own hardware designs for Helion's fusion generator prototypes. You will solve multidisciplinary engineering problems that are necessary for deploying fusion energy to the world and act as a culture driver on a growing team. You will report to the Senior Manager of Engineering, and this is an onsite role located at our Everett, WA office.
You Will
- Own and understand subsystem designs such as electromagnetic, structural, fluid, thermal and control systems, and improve their requirements
- Learn from historical engineering approaches, design novel hardware, and test your solutions
- Design fusion hardware within 3D CAD software (e.g. NX, Solidworks)
- Perform analysis with tools like ANSYS and hold design reviews to gather feedback and iterate to a fully functioning system
- Learn from experts to expand your engineering skillset and domain knowledge
- Work hands-on alongside experienced technicians to implement your hardware designs
- Troubleshoot hardware issues as they arise on integrated fusion generators
Required Skills
- Bachelor's degree in engineering
- 8+ years of professional experience delivering on full-scope engineering projects (including schedule ownership)
- Experience applying engineering first-principles and method-based thinking to challenging problems
- Hands-on exposure to a variety of engineering disciplines (mechanical, electrical, fluids)
- Advanced experience with CAD software (e.g. NX, Solidworks)
- Moderate experience with FEA software (e.g. ANSYS, FEMAP)
- Moderate experience with GD&T and generating engineering drawings per ASME Y14.5
Benefits
Our total compensation package includes benefits, including but not limited to:
- Medical, Dental, and Vision plans for employees and their families
- 31 Days of PTO (21 vacation days and 10 sick days)
- 10 Paid holidays, plus company-wide winter break
- Up to 5% employer 401(k) match
- Short term disability, long term disability, and life insurance
- Paid parental leave and support (up to 16 weeks)
- Annual wellness stipend
Helion is an equal opportunity employer and value diversity at our company. We do not discriminate based on race, religion, color, national origin, gender, sexual orientation, age, marital status, veteran status, or disability status. If you need assistance or an accommodation during the interview process, please let us know.
Compensation Range: $182K - $214K
Pay & benefits
About this role
About Helion Energy
Company overview
Helion Energy, backed by investors including Lightspeed Venture Partners, Mithril Capital and SoftBank Vision Fund 2
Everett, United States
2013
What they do
Helion is a fusion energy company focused on generating zero-carbon electricity from fusion. It was founded in Washington State by David Kirtley, Chris Pihl, John Slough and George Votroubek to build a fusion system designed for commercial electricity.
In its machines, two colliding plasmas in a field-reversed configuration (FRC) are compressed by a powerful magnetic field until they reach fusion temperatures above 100 million degrees Celsius. As the plasma expands, it pushes against the magnetic field and induces a current that is recaptured directly as electricity. Helion uses helium-3 as fusion fuel and produces it in-house from deuterium.
Projects and track record
Helion has built and tested seven fusion prototypes. The sixth, Trenta, set a commercial fusion industry record for plasma temperature at 100 million degrees Celsius.
In 2023 Helion signed what it calls the world’s first fusion power purchase agreement with Microsoft, for 50 megawatts of clean electricity; its first power plant, Orion, is designed to meet that commitment, with initial operations beginning in 2028. Also in 2023, Helion and the steel producer Nucor announced an agreement to develop a 500 MWe fusion power plant at a Nucor steel manufacturing facility in the United States.
Recent developments
Construction of Orion began in July 2025 in Malaga, Washington, and Helion aims to have it online by 2028. In June 2026 Helion received a radioactive materials licence and a radioactive air emissions licence for Orion from the state of Washington.
In February 2026 Helion announced that its Polaris prototype had become the first privately developed fusion machine to demonstrate measurable deuterium-tritium fusion and had reached plasma temperatures of 150 million degrees Celsius. TechCrunch reported the temperature as three-quarters of the way to what the company thinks it will need to operate a commercial fusion power plant.
In June 2026 Helion announced a Series G funding round led by Thrive Capital at a post-money valuation of $15.5 billion, and the round closed at $500 million in September 2026. In October 2026 it signed a letter of intent with the U.S. Department of Commerce to receive up to $175 million in CHIPS research and development funding for next-generation semiconductor technologies for commercial fusion energy.
Working there
Helion hires engineers, technicians, machinists and scientists, with open positions in mechanical engineering, electrical engineering, plasma physics, power electronics, manufacturing, supply chain and operations. Its jobs are in Everett and Chelan County, Washington.
Helion offers a 5% 401(k) match and stock options for all employees, plus 21 days of annual leave, 10 days of sick leave, 11 public holidays and a week’s winter break. Parents get up to 12 weeks of paid leave to care for a new child, and birthing parents 4 more weeks.