Job description
At Canadian Solar, our vision is to make lives better by bringing electricity powered by the sun to millions of people worldwide. As a leading manufacturer of solar panels, inverters, and energy storage solutions, we've been an industry front-runner since our founding in 2001. Our commitment to sustainability is reflected in all parts of our organization as we navigate the complexities of a booming industry.
Throughout Canadian Solar's subsidiaries, e-Storage, Recurrent Energy, MSS and CSI Solar Co., we invest in our employees' growth. Our training programs and promotional opportunities ensure we all can continue to learn. We understand the importance of work-life balance and provide various flexible work options to support our employees' well-being. Join our team to "Make the Difference" by creating a lasting positive impact on the world and the communities where we operate.
Purpose
Acts as the regional senior technical specialist for power systems and product commissioning across the UK BESS fleet. Leads product commissioning of e-STORAGE products (SolBank, string inverters, MVSkids etc) to OEM standard, leads HV/MV maintenance and safety activities across e-STORAGE and third-party fleets (i.e. SMA, Power Electronics) and develops the competency of the wider service team to support HV/MV works.
Scope Definition: Product Commissioning
This role leads product commissioning of e-STORAGE products: commissioning of e-STORAGE power conversion and MV equipment to OEM standard, including first power-on initialization parameters, product-level testing, and return-to-service. The site Commissioning (Cx) team retains overall site and project commissioning ownership, including the energisation programme, grid compliance and G99 testing, punch lists, and client handover. The Power Systems Technician works within the site Cx team's sequence: the Cx team owns the programme and the date; Power Systems owns the product Cx, safety documents, and product-level sign-off within it.
MV/HV Authorisation & Control of Work
Control of work and HV authorisation are determined by contract and project phase:
- During commissioning, the EPC (or Principal Contractor) is responsible for site control of work and HV authorisation. This role operates within the EPC's safe system of work and provides product-level expertise.
- During LTSA operations, the HV authorisation and control-of-work model is defined in each contract and varies by site (client-appointed, third-party, or CSE-held). This role provides the trained, competent personnel for appointment where CSE holds or is delegated that responsibility.
- Where a third party holds HV authorisation for a site, this role coordinates, supervises interfaces, and delivers the product-level technical work within their control regime.
Key Responsibilities
Product Commissioning (e-STORAGE products)
- Lead product commissioning of e-STORAGE products across UK LTSA sites (SolBank, string inverters, MVSkids and associated MV plant) to OEM standard and project scope.
- Own and set first power-on initialization parameters (OEM-trained personnel requirement per product manuals); incorrect settings risk equipment damage and certification non-compliance.
- Own product commissioning standards, procedures, test records, and documentation packs; ensure consistency across all UK projects.
- Provide product-level technical support to the site Cx team during energisation.
- Support the site Cx team during SAT and witness testing; provide product-level technical sign-off.
HV/MV Operations & Safety
- Competent for appointment to carry out MV/HV isolations, earthing, and safety document duties under the prevailing site safe system of work, as a mandatory precursor to intrusive PM/CM works. Site HV authorisation arrangements are defined per contract and phase (see MV/HV Authorisation & Control of Work).
- Carry out operational HV/MV switching during the service phase, including switching for planned PM outages, CM interventions, and restoration on return to service, where CSE holds control of work under the contract.
- Provide HV/MV support to the service team during PM and CM activities: isolations, earthing, switching, and safe access where service team work interfaces with HV/MV plant.
- Lead HV/MV preventative maintenance across CSE, SMA and Power Electronics MV skids, RMUs, transformers, and protection systems per OEM schedules.
- Lead corrective maintenance and fault investigation on HV/MV equipment: root cause analysis, rectification and return to service.
- Provide safety leadership and oversight for all HV/MV activities in region, including supervision of third-party HV contractors where used.
Technical Expertise & Capability Building
- Subject-matter expert across all inverter platforms (CSE string inverters, SMA, Power Electronics) for HV/MV maintenance activities; product commissioning expertise applies to e-STORAGE products.
- Assess and develop service team competency for HV/MV support roles; deliver toolbox talks, training, and authorisation recommendations.
- Feed field learnings back into standards, RAMS/SOPs, and OEM escalations.
Requirements
- Trained and competent for MV/HV activities to 33kV; capable of appointment under company or client operational rules as contracts require.
- Time-served electrical background with utility-scale BESS or solar commissioning experience.
- Working knowledge of MV switchgear, transformers, and protection systems.
- Familiarity with G99 requirements sufficient to support the site Cx team during compliance testing.
- Full UK driving licence; regional and occasional national travel.
Typical pay for similar roles
EstimateThe middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.
About this role
About Canadian Solar
Company overview
Canadian Solar Inc., listed on Nasdaq since 2006
Kitchener, Canada
2001
About 12,600 full-time employees (end of 2025); net revenues of $5.6 billion in 2025
What they do
Canadian Solar makes solar photovoltaic modules, supplies solar and battery energy storage solutions and develops utility-scale solar and storage projects. Its Manufacturing segment combines CS PowerTech, which makes and sells solar and battery storage products for the US market, with CSI Solar, which serves all other markets. Its Recurrent Energy segment develops and sells solar and battery storage projects, provides power services and earns electricity revenue from its operating portfolio. Canadian Solar holds about 64% of CSI Solar, its main operating subsidiary in China.
Over 25 years, Canadian Solar has delivered nearly 180 GW of solar modules worldwide. Its storage business, e-STORAGE, had shipped more than 23 GWh of battery storage by 30 June 2026 and held a contracted backlog of $3.5 billion. At the end of 2025, Recurrent Energy managed about 15 GW of solar and battery storage projects under operations and maintenance contracts.
Projects and track record
Since entering project development in 2010, Canadian Solar has developed, built and connected about 12.4 GWp of solar projects and 6.4 GWh of battery storage projects. At 30 June 2026, its development pipeline held about 22 GWp of solar and 84 GWh of storage.
In California, the 350 MW / 1,400 MWh Crimson Energy Storage Project in Riverside County has operated since 2022 under two storage contracts with local utilities. In Arizona, the 300 MW / 1,200 MWh Papago Storage project near Tonopah has been in commercial operation since 2025 under a 20-year tolling agreement.
In Spain, the 200 MWp Villameca solar plant in Castilla y León began commercial operation in October 2026, joining the recently inaugurated 426 MWp Rey Solar Project in Andalusia. In Australia, the 150 MWac Carwarp Energy Park near Mildura, Victoria, reached commercial operation in August 2026, backed by a long-term power purchase agreement with Microsoft.
Recent developments
Canadian Solar opened its new global headquarters in Kitchener, Ontario, on 15 January 2025. On 1 December 2025, it announced it would resume direct oversight of its US operations, holding a 75.1% stake in CS PowerTech, a new joint venture with CSI Solar. On 14 May 2026, Colin Parkin became Chief Executive Officer, and founder Shawn Qu moved from Chairman and CEO to Executive Chairman and Chief Technology Officer.
In July 2026, Canadian Solar opened the first phase of its HJT solar cell factory in Jeffersonville, Indiana, with a nameplate capacity of 2.1 GWp, the first commercial-scale HJT cell plant in the US. Its 5 GWp module factory in Mesquite, Texas, is being expanded to 10 GWp, with completion expected in the second half of 2026. In the second quarter of 2026, its module shipments fell 60% year on year to 3.1 GW, while battery storage shipments rose 73% to 3.7 GWh.
In August 2026, Recurrent Energy closed $695 million of project financing and tax equity for its 330 MW Cobalt Solar project in Riverside County, California. In October 2026, it sold two battery storage projects in France, Baixas and Coquainvilliers, each of 100 MW / 400 MWh, to BW ESS.
Working there
Canadian Solar’s full-time workforce fell from 22,234 at the end of 2023 to 12,587 at the end of 2025. At that point, 2,061 employees worked in the US, 9,187 in Asia Pacific, including China, and 1,339 in Europe and other regions. The Kitchener office houses the corporate headquarters, e-STORAGE and the module sales and services business units.
In Europe, Recurrent Energy has offices in Milan, Madrid, Amsterdam, Warsaw and London. In the US, Canadian Solar’s 401(k) plan matches 100% of the first 5% of employee contributions, and staff at all levels can join its education courses and programmes, from classroom training and e-learning to coaching and mentoring.