Rejobs
Eos Energy Enterprises
Eos Energy Enterprises
31 open jobs · Posted 91 days ago

Engineer, Product Serviceability & Field Reliability

Join Eos Energy in Edison, US as an Engineer focusing on product serviceability and field reliability. This role bridges battery system design with real-world deployment, improving service standards and diagnostics. Benefit from a dynamic environment with extensive travel and impactful work in renewable energy.

Salary
Not stated
Location
Edison, NJ
Workplace
Hybrid
Job type
Full time
Applies on eosenergystorage.wd1.myworkdayjobs.com

Check your inbox.

On a phone? Apply from a computer later.

Job description

This role sits at the intersection of Eos's battery system design and its real-world deployment, closing the loop between how our BESS is engineered and how it is actually built, commissioned, and serviced in the field. The Engineer, Product Serviceability & Field Reliability will translate field failure data, commissioning friction, and O&M feedback into concrete product design inputs - while equipping Field Services and EPC partners with the technical standards, diagnostics, and documentation needed to service Eos systems efficiently and safely.

Responsibilities

  • Serve as the primary technical liaison between Product Engineering and Field Services/execution, ensuring design decisions account for constructability, commissioning sequencing, and long-term serviceability.
  • Support Field Quality team lead root cause analysis (RCA) on field-reported hardware/firmware failures and translate findings into design change requests, retrofit specs, or service bulletins.
  • Build and maintain or support SQL-based fleet telemetry monitoring to flag precursor failure signatures across deployed Eos systems, and use Python for diagnostic scripting and trend analysis.
  • Author and maintain technical due diligence standards and field-readiness documentation used by EPC partners, Field Services, and internal stakeholders.
  • Identify and resolve thermal, mechanical, and power-delivery bottlenecks that impact serviceability, commissioning timelines, or asset reliability.
  • Partner with Commissioning and Field Services teams to reduce time-to-resolution on site issues by improving diagnostic tooling, spare parts logic, and troubleshooting documentation.
  • Support RFP and pre-sale technical due diligence by providing serviceability and reliability input on proposed system designs.
  • Contribute to fleet-wide uptime KPIs and report data-driven reliability trends to Deployment leadership.

Education and Experience

  • 5+ years in utility-scale BESS or related power systems, with direct experience bridging OEM/product engineering and EPC/field execution.
  • Demonstrated experience in performance testing, capacity validation, or commissioning of megawatt-scale energy storage systems.
  • Strong root cause analysis background across hardware/firmware failure modes.
  • Proficiency in SQL for fleet telemetry monitoring and Python for diagnostic/data analysis.
  • Experience authoring technical standards or due diligence documentation used cross-functionally.
  • M.S. in Engineering (or equivalent experience); specialization in sustainable energy systems a plus.
  • Comfortable operating in ambiguity at a growth-stage OEM, translating field-level signal into upstream design action.

Travel

  • Local Travel
  • Overnight/North America: 75%

Working Conditions

  • Office Environment - Must be able to remain in a stationary position 50% of the time and occasionally move about inside the office to access file cabinets, office machinery, etc. Required to have close visual acuity to perform an activity such as: preparing and analyzing data and figures; transcribing; viewing a computer terminal; extensive reading. May be required to exert up to 25 pounds of force occasionally to lift, carry, push, pull or otherwise move objects, including the human body.
  • Customer/Partner Locations - Employee may visit customer or partner locations that may be comprised of office, manufacturing floor, laboratory environments and construction sites depending on the location and reason for visit.

Typical pay for similar roles

Estimate
US$62,400–92,560 annually
Mid level · Maintenance & Reliability · United States · 129 similar jobs

The middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.

About this role

Posted
18 Aug 2026
Sectors
Timezone
UTC-05:00
Experience
5+ years in utility-scale BESS or related power systems
Employer eose.com LinkedIn Eos Energy Enterprises

About Eos Energy Enterprises

Company overview

Eos Energy Enterprises, Inc., listed on Nasdaq (EOSE)

Pittsburgh, Pennsylvania, United States

2008

About 800 employees (December 2025); revenue of USD 114.2 million in 2025

What they do

Eos Energy Enterprises designs, manufactures and provides zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, for utility-scale, microgrid, commercial and industrial applications of 4 to 16+ hours. Its Znyth aqueous zinc battery technology is the core of its Eos Indensity and Eos Cube systems and is made from just five low-cost, readily available and fully recyclable commodities.

The Eos Cube comes with 672 Eos Z3 battery modules, electrical equipment and the battery management system pre-integrated into a standard 8 x 16-foot outdoor-rated shipping container. The Eos Indensity architecture stacks Indensity Core units that combine Z3 modules with the Eos DawnOS controls platform, and targets up to 1 GWh per acre, roughly four times most incumbent footprints. DawnOS, a software platform designed to enhance the value, reliability and safety of the company’s battery systems, was introduced in 2025.

Eos is consolidating its battery manufacturing at Thorn Hill, its 432,000-square-foot production facility in Warrendale, Pennsylvania, while Cube assembly, testing and shipping continue at Turtle Creek, Pennsylvania. Its Z3 battery is designed, built and shipped from Pittsburgh with approximately 91% domestic content. At the end of September 2026 the company had a backlog of USD 765 million and a commercial opportunity pipeline of USD 24.9 billion.

Projects and track record

By the end of September 2026, Eos technology had discharged 6.9 GWh of cumulative energy. In December 2024 the company announced a 400 MWh standalone storage order from International Electric Power for a project at Marine Corps Base Camp Pendleton in San Diego County, California, partially funded by the California Energy Commission.

In June 2026 Eos received the first purchase order under Frontier Power USA’s 2 GWh capacity reservation agreement, for the Redbird project, a 100 MW / 400 MWh battery energy storage system that Bimergen developed for the ERCOT market in Texas. In September 2026 it announced an agreement with MN8 Energy and Google to deliver 10 MW/100 MWh of Z3 long-duration storage in West Virginia, serving Google’s data centres in the region; it is the first commercial-scale long-duration energy storage deployment in West Virginia. In Europe, Eos signed a binding master supply agreement with CAPAC Energy in June 2026 that makes the German developer and operator of battery storage its exclusive partner in Germany, Austria and Switzerland, with a 750 MWh capacity commitment and the potential to scale up to 2 GWh through 2031.

Recent developments

In 2026 Eos relocated its corporate headquarters to Nova Place on Pittsburgh’s North Shore, and in June it began commercial production at Thorn Hill, less than six months after entering the facility. In August it announced that its battery manufacturing would be consolidated there, offering each of the approximately 250 affected employees a role at Thorn Hill, at Building 200 or in its corporate offices. Once the move is complete, Thorn Hill is expected to have about 4 GWh of annual nameplate capacity across two production lines; in September Eos received a USD 87 million advance under its U.S. Department of Energy loan to fund the second production line there.

In May 2026 Eos and Cerberus Capital Management announced Frontier Power USA, an independent development and investment company to build, own and operate long-duration battery storage projects using Eos Z3 technology. In July 2026 Eos was awarded a Golden Dome for America contract as part of a strategic partnership with the US Department of War, to integrate mission-ready long-duration energy storage for the nation’s defence shield. Third-quarter 2026 revenue was USD 82.7 million, up 171% year over year.

Working there

Eos recruits for manufacturing, engineering and design, and administrative positions, and for research and development roles from advanced electrical engineering to battery management system software. Its research and development centre, the Eos Ingenuity Lab, is in Edison, New Jersey, and the company expects to create jobs across 4 shifts to staff Line 2 at Thorn Hill.

At the end of 2025, approximately 420 production and maintenance employees at its Turtle Creek and East Pittsburgh facilities were represented by the United Steelworkers (USW). Its full-time employees receive comprehensive healthcare benefits, a 3% non-elective employer contribution to a 401(k) plan, discretionary bonus and incentive pay, paid time off, paid parental leave and wellness programmes, and Eos offers equity to all employees.

More energy storage jobs like this

Engineer, Product Serviceability & Field Reliability
Eos Energy Enterprises