Eos Energy Enterprises, Inc. is accelerating the shift to American energy independence with positively ingenious solutions that transform how the world stores power. Our breakthrough Znyth™ aqueous zinc battery was designed to overcome the limitations of conventional lithium-ion technology. It is safe, scalable, efficient, sustainable, manufactured in the U.S., and the core of our innovative systems that today provides utility, industrial, and commercial customers with a proven, reliable energy storage alternative for 3 to 12-hour applications. Eos was founded in 2008 and is headquartered in Edison, New Jersey. For more information about Eos (NASDAQ: EOSE), visit eose.com.
Responsibilities
- Effectively Troubleshoot Electrical, PLC/HMI and networking issues when equipment is down for production.
- Self-managing multiple medium-to-large scale automation projects simultaneously in a timely manner. Report status on weekly basis.
- Participate in designing, development and maintaining company automation standard in SCADA/HMI/PLC programming.
- Develop full scale electrical/networking diagram for large scale project in AutoCAD or SolidWorks. Develop technical documentation such as Technical User Manual and Detailed Designed Specification documents.
- Continuous research with automation vendor on sensors, controls and testing equipment for potential projects and upgrades on existing automation systems.
- Maintain, update and backup SQL and Historian database for Enterprise operation on weekly basis.
- Design, develop, test and maintain automation solutions in electrical and software across various process areas.
- Responsible in troubleshooting a live Energy Cube (1000 volt DC) electrical connection and components issues with multimeter.
- Troubleshoot and upgrade AC-DC Inverters and/or DC Power Supplies for Energy Cube Testing.
- Be able to work on PLC/HMI/SCADA/Server/Electrical applications at anytime, sometimes remotely (Night, Weekend, or holiday) aligned with production downtime.
Knowledge, Skills, and Abilities
- Excellent communication and technical documentation skills.
- Able to design, develop, test and maintain large scale automation solutions.
- Minimum 8 years of hands-on experience with PLC and HMI or SCADA programming.
- Minimum 5 years of Robotic Arm programming experience interfacing with PLC, preferred Fanuc programming skills.
- Minimum 5 years of experience with Ethernet/IP, Modbus TCP, RS485 and CIP Safety protocols.
- Minimum 8 years of experience in hands-on 24VDC, 120VAC, 480VAC troubleshooting.
- Comfortable of troubleshooting 1000VDC electrical circuitry and components.
- Proficient experience in Allen Bradley (Rockwell Automation) PLC/HMI/SCADA, Fanuc Robot Arms, MES, Historian Server and SQL Database solution experiences.
- Certificate in Lean-Six-Sigma and High level language programming experience such as C++ will be a plus.
- Proficient of LOTO procedure and GAMP 5 Guidelines.
- Good understanding in NEC, IBC and NFPA.
- Good communication and documentation skills with MS Office product in URS, FRS, DDS and FAT Process.
Education and Experience
- Bachelor's degree in Electrical or Mechatronic Engineering required
- Minimum 8 years of related experience required
Travel
- Local and overnight travel within North America may be required less than 10% of the time.
Working Conditions
Office Environment - Must be able to remain in a stationary position 50% of the time and occasionally move about inside the office to access file cabinets, office machinery, etc. Required to have close visual acuity to perform an activity such as: preparing and analyzing data and figures; transcribing; viewing a computer terminal; extensive reading. May be required to exert up to 25 pounds of force occasionally to lift, carry, push, pull or otherwise move objects, including the human body.
Factory - The worker may be subject to hazards. Includes a variety of physical conditions, such as proximity to moving mechanical parts, vibration, moving vehicles, electrical current, exposure to temperature changes or exposure to chemicals. While performing the duties of this job, the employee may be exposed to fumes, airborne particles, odors, dust, mists, and gases. The noise level in the work environment can be loud.
Required to have close visual acuity to perform an activity such as: preparing and analyzing data and figures; transcribing; viewing a computer terminal; extensive reading; visual inspection involving small defects, small parts, and/or operation of machines (including inspection); using measurement devices; and/or assembly or fabrication parts at distances close to the eyes.
Machinery operation requires the use of safety equipment to include but not limited to eye safety glasses, hearing protectors, work boots, and lab coats. May be required to exert up to 40 pounds of force occasionally to lift, carry, push, pull or otherwise move objects, including the human body.
Typical pay for similar roles
EstimateThe middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.
About this role
About Eos Energy Enterprises
Company overview
Eos Energy Enterprises, Inc., listed on Nasdaq (EOSE)
Pittsburgh, Pennsylvania, United States
2008
About 800 employees (December 2025); revenue of USD 114.2 million in 2025
What they do
Eos Energy Enterprises designs, manufactures and provides zinc-based long-duration energy storage (LDES) systems sourced and manufactured in the United States, for utility-scale, microgrid, commercial and industrial applications of 4 to 16+ hours. Its Znyth aqueous zinc battery technology is the core of its Eos Indensity and Eos Cube systems and is made from just five low-cost, readily available and fully recyclable commodities.
The Eos Cube comes with 672 Eos Z3 battery modules, electrical equipment and the battery management system pre-integrated into a standard 8 x 16-foot outdoor-rated shipping container. The Eos Indensity architecture stacks Indensity Core units that combine Z3 modules with the Eos DawnOS controls platform, and targets up to 1 GWh per acre, roughly four times most incumbent footprints. DawnOS, a software platform designed to enhance the value, reliability and safety of the company’s battery systems, was introduced in 2025.
Eos is consolidating its battery manufacturing at Thorn Hill, its 432,000-square-foot production facility in Warrendale, Pennsylvania, while Cube assembly, testing and shipping continue at Turtle Creek, Pennsylvania. Its Z3 battery is designed, built and shipped from Pittsburgh with approximately 91% domestic content. At the end of September 2026 the company had a backlog of USD 765 million and a commercial opportunity pipeline of USD 24.9 billion.
Projects and track record
By the end of September 2026, Eos technology had discharged 6.9 GWh of cumulative energy. In December 2024 the company announced a 400 MWh standalone storage order from International Electric Power for a project at Marine Corps Base Camp Pendleton in San Diego County, California, partially funded by the California Energy Commission.
In June 2026 Eos received the first purchase order under Frontier Power USA’s 2 GWh capacity reservation agreement, for the Redbird project, a 100 MW / 400 MWh battery energy storage system that Bimergen developed for the ERCOT market in Texas. In September 2026 it announced an agreement with MN8 Energy and Google to deliver 10 MW/100 MWh of Z3 long-duration storage in West Virginia, serving Google’s data centres in the region; it is the first commercial-scale long-duration energy storage deployment in West Virginia. In Europe, Eos signed a binding master supply agreement with CAPAC Energy in June 2026 that makes the German developer and operator of battery storage its exclusive partner in Germany, Austria and Switzerland, with a 750 MWh capacity commitment and the potential to scale up to 2 GWh through 2031.
Recent developments
In 2026 Eos relocated its corporate headquarters to Nova Place on Pittsburgh’s North Shore, and in June it began commercial production at Thorn Hill, less than six months after entering the facility. In August it announced that its battery manufacturing would be consolidated there, offering each of the approximately 250 affected employees a role at Thorn Hill, at Building 200 or in its corporate offices. Once the move is complete, Thorn Hill is expected to have about 4 GWh of annual nameplate capacity across two production lines; in September Eos received a USD 87 million advance under its U.S. Department of Energy loan to fund the second production line there.
In May 2026 Eos and Cerberus Capital Management announced Frontier Power USA, an independent development and investment company to build, own and operate long-duration battery storage projects using Eos Z3 technology. In July 2026 Eos was awarded a Golden Dome for America contract as part of a strategic partnership with the US Department of War, to integrate mission-ready long-duration energy storage for the nation’s defence shield. Third-quarter 2026 revenue was USD 82.7 million, up 171% year over year.
Working there
Eos recruits for manufacturing, engineering and design, and administrative positions, and for research and development roles from advanced electrical engineering to battery management system software. Its research and development centre, the Eos Ingenuity Lab, is in Edison, New Jersey, and the company expects to create jobs across 4 shifts to staff Line 2 at Thorn Hill.
At the end of 2025, approximately 420 production and maintenance employees at its Turtle Creek and East Pittsburgh facilities were represented by the United Steelworkers (USW). Its full-time employees receive comprehensive healthcare benefits, a 3% non-elective employer contribution to a 401(k) plan, discretionary bonus and incentive pay, paid time off, paid parental leave and wellness programmes, and Eos offers equity to all employees.