Job description
The Grid Engineer is responsible for the technical execution of grid connection workstreams for utility-scale windfarms. Operating across the full project lifecycle, the Grid Engineer performs complex power system modelling and manages the technical documentation required for successful grid integration. This is a critical role that ensures project viability, compliance, and the timely delivery of Australia's transition to a sustainable energy future.
YOUR TASKS
- Prepare and compile technical documentation related to Connection Application, Registration (R1), and Hold Point/Commissioning (R2) documentation packages.
- Perform technical power system studies (steady-state and dynamic) for a project portfolio using tools like PSS/E, PSCAD, or PowerFactory.
- Support the negotiation of Generator Performance Standards (GPS) with AEMO and NSPs by providing technical data and analysis.
- Liaise with AEMO, NSPs, and consultants to address technical queries and facilitate the approvals process.
- Coordinate with external consultants to ensure specific project tasks are delivered on time and meet technical requirements.
- Troubleshoot project models in collaboration with internal technical teams.
- Utilize and contribute to internal modelling standards, templates, and engineering procedures.
- Assist in feasibility assessments and the development of connection strategies for early-stage projects.
YOUR PROFILE
- Bachelor's or Master's degree in Electrical Engineering or Power Systems.
- 2 years of experience in grid engineering or power systems, ideally within the renewable energy sector.
- Demonstrated experience with grid connection processes in the NEM.
- Good knowledge of the NER, GPS, and AEMO/NSPs connection processes.
- Good knowledge in power system modelling tools (PSSE, PSCAD, PowerFactory).
- Good knowledge of electrical dynamics of grids and electrical machines.
- Good analytical, communication, and stakeholder engagement skills.
- Ability to work and engage in an international environment liaising with Headquarters Team.
YOUR BENEFITS
In addition to the opportunity to make our world a little more sustainable, we offer you:
*Some offers may vary by location
At Nordex, we are committed to creating a diverse and inclusive workplace where everyone has the opportunity to thrive. As an equal opportunity employer, we welcome applicants of all genders, ethnicities, ages, religions and backgrounds to apply for our open positions.
Recruitment Fraud Notice: Please note that our People Attraction department will only contact you via official @nordex-online.com email addresses or authorized recruitment partners. You can find more information about our application process on our website.
About this role
About Nordex
Company overview
Nordex SE, a listed company whose shares are in the MDAX and TecDAX; Acciona S.A. holds 47.0% of the shares
Hamburg, Germany
1985
More than 11,100 employees; group revenue of around €7.6 billion in 2025
What they do
The Nordex Group's core competences are the development, manufacture, project development and servicing of onshore wind turbines. Its product range focuses mainly on onshore turbines in the 4 to 7 MW+ classes. Since its founding in 1985, the group has put more than 67 GW of wind capacity into operation in more than 40 markets.
Its production network includes plants in Germany, Spain, Brazil, India, Turkey and the USA. Around 380 service points in around 30 countries keep the turbines running.
Projects and track record
In 2025 Nordex supplied and erected 31.5% of the onshore wind capacity newly connected to the grid in Germany. In the same year, the group's order intake rose by 22.5% to 10,214 MW.
In early 2026 Nordex won orders for 508 MW in Canada, including a first order for N175/6.X turbines. The Austrian energy company VERBUND ordered 12 N163/6.X turbines for the 84 MW Spille wind farm in Albania.
Recent developments
With its results for the third quarter of 2026, Nordex raised its EBITDA margin guidance for the full year to 11.5 to 12.5%. In autumn 2026 the group agreed to take over C1 Connections, a Dutch engineering company specialising in connection technologies for towers. Nordex also presented the N193/7.X, which combines a rated output of 7.3 MW with a rotor diameter of 193 metres.
In spring 2026 Nordex started production at a new rotor blade factory in Menemen, Izmir (Turkey). The plant employs around 1,200 people in production and administration.
Working there
Nordex advertises positions in service and on-site work, administration, production, purchasing and materials management, development and engineering, controlling and finance, IT and SAP, sales, and project management. Entry routes are apprenticeships and dual study programmes, career starter roles, roles for experienced professionals and management positions.
Depending on the site, working hours and place of work can be arranged flexibly. For commuting by public transport, Nordex offers the Deutschlandticket, and staff can use a bike through an e-bike leasing programme.