Job description
Florida Power & Light Company is the largest electric utility in the U.S., providing reliable energy to nearly 12 million Floridians. With one of the nation's most fuel-efficient, cost-effective power generation fleets and industry-leading reliability, we're redefining what's possible in energy. Want to be part of something powerful? Join our outstanding team and help shape the future of energy.
This position is located at our Port Everglades Plant in Fort Lauderdale, Florida and will travel the state of Florida to support the fleet outages. Tools are provided by the company. Days and shifts will vary based on the business unit needs during the outage. Normal schedule (not supporting an outage) is a day shift Monday-Friday. Overtime hours average approximately between 400 hours to 800 hours per year. Employees are offered per diem when traveling outside of their region. The plant operates 24/7 so individuals will be expected to work and support weekend days as needed.
Job Overview
This is a non-shift, classification that works a regular day shift schedule. The function of this classification is to perform all maintenance activities on plant instrument and control equipment. This classification may be required to travel to other work locations as workload requires.
Minimum requirements for job:
- Must have held, or be qualified to hold the position of Instrument and Control Specialist, or have completed the Apprentice Instrument and Control Specialist program. -OR-
- Has worked at another industrial facility as an I. and C. technician, and completed an accredited training program. -OR-
- Has worked for a minimum of 2 years at an industrial facility in the maintenance and troubleshooting of instrumentation and control devices, and has satisfactorily completed the following college courses from an accredited college. (Basic college Algebra/Technical math/D.C.circuits and Lab/A.C. circuits and Lab/ Physics/Electronic Devices I and Lab/Electronic Devices II and Lab/Communications I.) -OR-
- Has equivalent military experience or any other rating that is equally comparable -OR-
- Any graduate of an approved college who has received an associate degree in Electronics or Instrument technology.
Accountabilities:
- Operates all types of power tools, and uses any hand tools necessary to provide a safe, clean and productive work place,
- Uses precision tools and a wide variety of meters and test equipment.
- May maintain stock and records of plant instrument and electrical materials,supplies, tools and spare parts.
- Performs major maintenance of plant instrument and control equipment and structures, and repair and replacement of plant instrument and control equipment and structures.
- Installs, tests and maintains electronic, pneumatic, hydraulic and mechanical instruments and devices that indicate, record, transmit or control the operation of power plants.
- Performs preventive maintenance to ensure proper function of equipment.
- Installs and maintains connecting piping, tubing and wiring from the primary sensing element to the final control element.
- Prepares records of calibration, tests and maintenance of these instruments and devices.
- Reads, interprets and works from electrical and mechanical diagrams and blueprints.
- Performs associated responsibilities according to the rules contained in the safe work practices handbook and the Memorandum of Agreement.
- Must have equivalent courses and /or experience to any of the above requirements.
Required Qualifications
- Pwr Plt Mtce Pos Sel Sys Test passed
- Valid Driver's License (NON CDL)
Preferred Qualifications
- None
NextEra Energy offers a wide range of benefits to support our employees and their eligible family members. Click here to learn more.
Employee Group: Bargaining Unit
Employee Type: Itinerant
Job Category: Power Generation Bargaining Unit
Organization: Florida Power & Light Company
Relocation Provided: No
NextEra Energy is an Equal Opportunity Employer. Qualified applicants are considered for employment without regard to race, color, age, national origin, religion, marital status, sex, sexual orientation, gender identity, gender expression, genetics, disability, protected veteran status or any other basis prohibited by law.
NextEra Energy provides reasonable accommodation in its application and selection process for qualified individuals, including accommodations related to compliance with conditional job offer requirements, consistent with federal, state, and local laws. Supporting medical or religious documentation will be required where applicable and permitted by applicable law.
NextEra Energy will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information.
NextEra Energy does not accept any unsolicited resumes or referrals from any third-party recruiting firms or agencies. Please see our policy for more information.
Typical pay for similar roles
EstimateThe middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.
About this role
About NextEra Energy
Company overview
NextEra Energy, Inc., listed on the New York Stock Exchange (NYSE: NEE)
Juno Beach, Florida, United States
About 17,400 employees at the end of 2025; operating revenues of $27.4 billion in 2025
What they do
NextEra Energy had approximately 80 GW of net generation and storage capacity at the end of 2025. Its utility, Florida Power & Light (FPL), began serving Florida in 1925 and is the largest electric utility in Florida and the U.S., serving approximately 12 million people through more than 6 million customer accounts. FPL operates 120 solar energy centres across Florida with approximately 8,826 MW of capacity, which it describes as the largest utility-scale solar portfolio in America.
NextEra Energy Resources (NEER) develops, builds and operates long-term contracted generation facilities, including renewables, nuclear and natural gas, as well as battery storage. At the end of 2025 it had approximately 37,505 MW of net generating capacity across 44 U.S. states and four Canadian provinces.
Its net wind capacity was approximately 22,404 MW in 23 states and four provinces and its net solar capacity approximately 10,504 MW in 35 states, alongside approximately 5,177 MW of battery storage in 18 states and one province. NEER and FPL operate seven nuclear units at four sites: Turkey Point and St Lucie in Florida, Seabrook in New Hampshire and Point Beach in Wisconsin.
Projects and track record
Amite Solar, a 100 MW facility in Tangipahoa Parish, reached commercial operation in March 2025 as NEER’s first utility-scale energy facility in Louisiana. In November 2025, NEER celebrated the start of operations at the Appleseed Energy Center, a 200 MW solar facility in Cass County, Indiana. In July 2026, together with Consumers Energy, it celebrated the start of operations at the Century Oaks Energy Center, a 200 MW battery storage facility in Huron County, Michigan.
Recent developments
In May 2026, NextEra Energy and Dominion Energy announced plans to combine in an all-stock transaction valued at about $66.8 billion, with the combined company operating under the NextEra name and maintaining dual corporate headquarters in Richmond, Virginia, and Juno Beach, Florida. Shareholders of both companies approved the merger in September 2026. The deal remains subject to regulatory approvals, and the companies expect it to close in the second half of 2027.
In December 2025, NextEra Energy and Google Cloud announced a partnership to develop multiple new gigawatt-scale data centre campuses with accompanying generation and capacity; the two companies already had approximately 3.5 GW in operation or contracted. The same month, NEER and Meta reached approximately 2.5 GW of clean energy contracts through 11 power purchase agreements and two energy storage agreements, covering 13 projects scheduled to come online between 2026 and 2028.
In October 2025, Google and NextEra Energy signed a 25-year agreement for the energy of the Duane Arnold nuclear plant in Iowa. NextEra Energy plans to restart the 615 MW plant in Linn County no later than the first quarter of 2029, pending regulatory approvals, and in September 2026 reached financial close with the U.S. Department of Energy on a loan of up to $1.9 billion to support the restart. In August 2026, it signed definitive agreements with the U.S. Department of Commerce and the Government of Japan to fund the development and operation of up to 10 GW of natural gas-powered generation in Texas and Pennsylvania.
Working there
NextEra Energy’s careers site lists jobs in accounting and finance, engineering, information technology, nuclear, power delivery and power generation, for linemen and cable splicers, and college internships. At the end of 2025, FPL had approximately 9,400 employees, about 30% of them represented by the International Brotherhood of Electrical Workers (IBEW). NEER had approximately 7,900 employees.