Job description
Electrical Engineer III is responsible for preparation of technical drawings, specifications, and studies of electrical systems for ground mount utility-scale solar PV power plants. Ensure that design conforms to AHJ codes and/or Owner specifications. Coordinate with other engineering disciplines to ensure design compatibility.
Essential Duties and Responsibilities
- Develop and evaluate electrical system requirements for utility-scale solar PV power plants
- Direct and/or develop electrical layouts using AutoCAD
- Develop electrical studies and calculations using ETAP
- Direct Electrical Designers and Engineers to prepare and revise electrical drawings and calculations
- Participate in 'Page Turn' reviews with construction and project management teams
- Provide construction support during the project execution phase
Supervisory Responsibilities
Supervise Electrical Designers and Electrical Engineers
Education and/or Work Experience Requirements
- BS in Electrical Engineering or Electrical Engineering Technology from an ABET accredited university
- Registered Professional Engineer
- Minimum eight (8) years relevant work experience
- Proficiency with AutoCAD
- Proficiency with application of NFPA 70 (NEC)
- Ability to perform electrical studies using ETAP software
- Strong written and verbal communication skills
- Comfortable presenting to and interacting with consultants, authorities with jurisdiction, and customers
- Experience with design of solar PV projects (desired)
- Experience with electric utilities (desired)
- Ability to obtain out-of-state PE license(s)
Physical Requirements/Work Environment
Work is performed in the office and in the field. Must be able to sit, stand, bend, twist and lift up to 20 pounds. May be exposed to weather elements when in the field. Limited out of town travel may be required.
Typical pay for similar roles
EstimateThe middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.
About this role
About Strata Clean Energy
Company overview
Strata Clean Energy (Strata Solar until 2021), privately held and owned by its founders
Durham, North Carolina, United States
2008
More than 600 employees (2026)
What they do
Strata Clean Energy is a fully integrated energy infrastructure company serving utilities, independent power producers (IPPs) and hyperscalers. Its core capabilities span turnkey development, engineering, procurement and construction (EPC), asset ownership and management, operations and capital markets. Through its subsidiary Power Generation Solutions, LLC (PGS), it also delivers substation EPC services for transmission and distribution.
It reports 3.6 GW of installed solar capacity and 1.8 GW of installed storage capacity, and it has a 9 GW active development pipeline. Where interconnection, land, gas supply and load converge and dependable capacity is essential to make a project viable, it adds natural gas generation to its integrated platforms, with renewables kept at the centre.
Projects and track record
Markus and Cathy Wilhelm founded the company in 2008, originally as Solar Tech South. It completed its first 5 MW plant in North Carolina in 2011 and a 50 MW project a year later, and passed 1 GW of installed solar capacity within eight years. It launched its battery energy storage division in 2018 and has since developed nearly 5 GWh of storage projects. To date it has commercialised roughly 240 projects and built more than 285 solar and storage assets across the United States.
At Scatter Wash in Maricopa County, Arizona, Strata led development, construction and asset management for a 1,020 MWh stand-alone battery storage project, and both phases came online in 2025. In 2020 and 2021 it developed Ventura Energy Storage near Oxnard, California, a 100 MW / 400 MWh battery. At the 144 MW Bookers project in Farnham, Virginia, it helped Dominion Energy reach its energy and capacity targets on a site most developers would avoid.
Recent developments
In September 2025, GridStor acquired Strata’s 100 MW / 400 MWh White Tank battery storage project in Arizona, which is expected to enter service in the first half of 2027; Strata will advise on the project until commercial operation begins. In March 2026, FTC Solar signed a five-year, 1 GW tracker supply agreement with Strata.
In April 2026, Strata announced the continued evolution of its vertically integrated model, expanding beyond its heritage in solar and storage development to strengthen its position as a fully integrated energy platform company. In July 2026 it upsized its revolving loan and letter of credit facility by USD 150 million, from USD 300 million to USD 450 million.
Working there
At Strata, 25% of staff come from the military, and the company is committed to hiring veterans at every level. All its interviewers go through anti-bias training, and it recruits from places such as historically Black colleges and universities (HBCUs), military bases, professional groups and community re-entry programmes. Every employee gets 8 paid volunteer hours a year to use with any community group or non-profit organisation.
Its operations and maintenance work is supported by more than 180 full-time O&M professionals and 24/7 monitoring from its Remote Operations Center. In 2025 the O&M division recorded a total recordable incident rate (TRIR) of 0.00, and its construction TRIR was 0.37.