Senior Manager Logistics (m/w/d)
KK Wind Solutions
Company Overview
KK Wind Solutions, part of KK Group under A.P. Moller Holding
HeadquartersIkast, Denmark
Founded1978
SizeApproximately 2,400 employees globally (source: rocketreach.co). Reported revenue of $246.6 million, not specified for 2023 or later (source: rocketreach.co).
What They Do
KK Wind Solutions focuses on electrical systems for wind turbines and expands their technology into Power-to-X (PtX), energy storage, power conversion, and electrification. With over 40 years of experience in electro-mechanical solutions for renewable energy, they offer advanced control systems, including hardware such as WTC3, WTC5, WTC6, and MC60 string controller, as well as customized control panels and software for integration and retrofitting (source: kkwindsolutions.com). Their products also include sensors such as anemometers and accelerometers, as well as monitoring systems like SCADA and Turbine Condition Monitoring (TCM®), enhanced through the acquisition of Gram & Juhl in 2020 (source: kkwindsolutions.com). Target markets include wind turbine manufacturers, the aftermarket for existing fleets, and new PtX/electrification, with customers including leading global manufacturers relying on solutions in harsh offshore environments (source: kkwindsolutions.com).
Projects & References
One of the most notable projects that KK Wind Solutions has completed is the equipping of the world's first offshore wind farm at Vindeby, Denmark, in 1991, where they provided control and monitoring systems for 11 Bonus 450kW turbines (source: kkwindsolutions.com). Additionally, they implemented early installations such as the 50kW Windmatic in 1983 and Riisager 22kW in 1978, as well as widespread WTC3 implementations after 2002 as a key product (source: kkwindsolutions.com). Their current expansions include consolidated production in Hammel, Chennai, and Tianjin, as well as the integration of Nissens in 2024 to enhance cooling systems and power conversion (source: kkwindsolutions.com).
Recent Developments
In the past two years, KK Wind Solutions acquired Vestas’ Converters & Control business in 2023, which has provided them with production in Hammel (600+ employees), Chennai, and Tianjin (source: kkwindsolutions.com). They also acquired Nissens Cooling Solutions in 2024 to strengthen their cooling systems and power conversion for wind (source: kkwindsolutions.com). Furthermore, they have validated their climate goals through the Science Based Targets initiative (SBTi) in 2024/2025, aiming to reduce direct operational emissions by 63% and 38% in the supply chain by 2035 (source: kkwindsolutions.com).
Working There
KK Wind Solutions offers roles in R&D, engineering, production, testing, logistics, sales, service, field operations, software development, and support. Their departments include Global Service, production, and specialized teams in control software, sensors, energy storage, and PtX (source: kkwindsolutions.com). Hiring takes place at global locations, including the headquarters in Ikast, Denmark, as well as in Szczecin (PL), Bangalore/Chennai (IN), Tianjin (CN), Madrid (ES), Shanghai (CN), and Kansas (US) (source: windlogisticsgroup.com). The company culture emphasizes innovation, collaboration with OEMs, and data-driven efficiency, with the principles "Drive Longer, Drive Better, Drive Always" in service (source: kkwindsolutions.com).
Last updated on Feb 23, 2026 | Report an issue
Job Description
Responsibilities
- Inbound, Inhouse & Out Bound Logistics Management
Inventory Management & Accuracy. - Customs Compliance & Statutory Compliance Management in warehouse (MOOWR & AA).
- Manage & Monitor 3PL Service providers.
- Responsible for Lean Management in Warehouse.
- Ontime registering of Inbound Inventory.
- Logistics arrangements for outbound transport to the destination.
- Ensure On time supply of parts to production line.
- Ensure FIFO where ever applicable.
- Ensure Safe handling of Materials in house.
- Manage Daily work allocation and people management to improve efficiency.
- Plan & Execute Cycle Count of parts.
Our requirements
- Specialization in Physical Logistics is preferable.
- Experience in Wearhouse automation to enable , safety & operational efficiency
- Good Knowledge & understanding of Inter continental trade arrangements.
- Good ERP knowledge (preferably DAX).
- Good Communication Skills.
- Result Oriented.
- Team Player.
- Data driven mindset.
- Attention to details.
- Influencer, Change agent, Team player.
- Thinker, rational and data based decision maker.
- Basic Project and program management knowledge.
- Strong commercial and financial acumen.
- People Management.
We offer
By joining KK Group, you will be part of a culture where diversity is embraced, every nationality is respected, and trust and collaboration across perspectives drives our success. Across our global organisation, we offer a wide range of job opportunities spanning office-based roles, production facilities, and onsite positions worldwide. Our roles cover multiple functions, locations, and disciplines, providing diverse career paths across the business. Whether you're interested in engineering, manufacturing, operations, or support functions, you'll find opportunities at KK Group to grow your skills, contribute to meaningful work, and make an impact.
Potential Benefits (Depending on Role)
Further information
If the above matches your field of interest and your qualifications, please send your application and resume as soon as possible. Interviews are held on an ongoing basis.
For further information, please contact:
Tanmay Bhattacharya +91 80 68260 101
Apply now
Job expired?Please let KK Wind Solutions know you found this job on Rejobs. It helps us grow and get more people working in renewable energy.
Apply now
Job expired?Please let KK Wind Solutions know you found this job on Rejobs. It helps us grow and get more people working in renewable energy.
See how you’re connected
View connectionsSee your contacts at KK Wind Solutions on LinkedIn and tap your network when applying for this position.
Get job alerts
Get job alerts for opportunities in Bengaluru, India
Join Talent Pool
Let clean energy employers find you
About the role
September 8, 2026
September 8, 2026
Full time
On-site
Company
- Bengaluru, India
Senior Management
UTC+05:30