Job description
The purpose of the Hydro Plant Technician is to support the overall operation of the hydro-electric power plant and the associated water intakes to maximize the reliability and efficiency of the electrical generating system. Safety being front of mind is paramount to our success, as is a strong commitment to environmental and regulatory compliance.
This position requires a standard 40 hour work week (8hrs Monday-Thursday, 4hrs on Fridays, 2hrs Saturday-Sunday) with the ability to respond to alarms at any time.
Why Eagle Creek?
- A comprehensive benefits plan: Medical, Dental, Vision, HSA, FSA, Commuter benefits, Voluntary Life, 401(k) match.
- Eleven paid holidays per year, plus a competitive PTO schedule and time off to volunteer or give back to your community.
- Access to a company-funded Employee Assistance Program.
- Employee discounts through ADP LifeMart.
- Tuition Reimbursement as well as access to trainings & mentors for Career Progression and Personal Development.
What you'll do
- Conduct daily plant and intake inspections.
- Start and stop the generating units and auxiliary equipment per established procedures.
- Conduct safety inspections and monitor security systems, keeping accurate logs and reports.
- Operate heavy equipment as well as an assortment of hand and power tools including chain saws.
- Perform routine and preventive maintenance in support of the reliability of the plant.
- Work on a rotating schedule to cover weekend duty and holidays.
- Assist in developing plant safety procedures and JSA procedures.
- Respond to calls at all hours of the day to react to emergent plant issues.
- Coordinate and supervise contractors in the performance of their activities.
- Participate in any safety programs developed by the company.
What you'll need
- At least two years of related experience in a power plant or industrial setting highly preferred.
- An unwavering commitment to safety, both for ECRE employees and contractors and the public in general.
- Instrumentation and control system experience, including troubleshooting of PLC based control systems and general calibration of instrumentation devices preferred.
- Ability to communicate and report all downtime related events in a timely manner to the regional manager.
- Experience with basic industrial maintenance techniques preferred.
- The ability to maintain a valid driver's license.
- High school diploma or equivalent required.
- Vocational certificate or degree in Engineering or Physical Sciences preferred.
- Experience with Microsoft Office Suite (Teams, Word, Outlook, etc.) for use in business communication.
Physical Requirements
-
Ability to perform manual tasks including but not limited to:
- The operation of hand and power tools and the ability to lift at least 50 lbs.
- Being able to bend and maneuver in tight, cramped quarters.
- Ability to work in hot, noisy, and dark environments, often alone and isolated.
- Comfortability working at heights and around water.
- Ability to work with and wear respiratory protection.
- Reach with hands and arms above shoulder level and at shoulder level.
- Walk, stand, stoop, kneel, and bend for prolonged periods of time.
- Grip and manually manipulate, often in repetitive motion, items such as but not limited to hand tools and machine parts.
- Read and identify labels, gauges, dials, and indicators typically encountered in performing job duties.
-
Possess clear and effective verbal communication in all circumstances, including emergency situations and giving/receiving instructions over a radio.
Eagle Creek Hydro Operations, LLC is an equal opportunity employer
Pay & benefits
Typical pay for similar roles
EstimateThe middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.
About this role
About Eagle Creek Renewable Energy
Company overview
Eagle Creek Renewable Energy, LLC, wholly owned by funds operated by Apollo Global Management
What they do
Eagle Creek Renewable Energy was founded to acquire, enhance and operate hydroelectric power facilities, and its fleet now spans 18 US states, with 85 hydro plants and 690 MW of generating capacity. The plants produce nearly 2.7 billion kilowatt-hours of electricity a year, enough to power over 260,000 homes. Of the 85 facilities, 84 fall under the jurisdiction of the Federal Energy Regulatory Commission (FERC), and the company has 22 relicensing proceedings in progress.
In 2024 Eagle Creek diversified its generation mix by acquiring Lightstar Renewables, which has a 1.3 GW development pipeline. In Illinois, Lightstar works across three service lines: community solar, agrivoltaic solar and battery energy storage.
Projects and track record
Eagle Creek started with the three-plant Mongaup River system in New York and bought North American Hydro’s Midwest portfolio in 2012. Since 2013 it has grown by acquiring operating, partly operating and non-operating plants, and has rehabilitated and improved more than 25 hydroelectric turbines that had been out of service.
Ontario Power Generation acquired Eagle Creek in November 2018 and, nearly a year later, Cube Hydro, merging the two under the Eagle Creek Renewable Energy name. Cube Hydro had bought the four-plant Yadkin River system in North Carolina in 2017, and the Yadkin Project has a total generating capacity of 215 MW. In Vermont, Eagle Creek built a 2,200 kW plant on the Ball Mountain Dam and a 900 kW plant on the Townshend Dam in 2016.
Recent developments
Funds managed by Apollo Global Management acquired Eagle Creek in January 2026. In October 2026 Eagle Creek formed a strategic partnership with Relevate Power under which it manages Relevate’s portfolio of run-of-river hydroelectric projects, and the local operators Relevate employed to run that portfolio will join Eagle Creek.
In January 2025 Eagle Creek finalised $2.8 million of US Department of Energy grants for efficiency upgrades at eight hydroelectric plants in Virginia, West Virginia, Pennsylvania and Maine, which will raise the plants’ output by 3 to 24%.
Lightstar marked the launch of its Plains Road project in September 2025, New York’s first utility-scale agrivoltaics installation. In August 2026 it was one of only three developers to receive conditional awards in New Jersey’s first Dual-Use Solar Energy Pilot Program, winning eight totalling about 27.3 MW. In November 2026 the Paxton City Council approved an annexation agreement for Lightstar’s Baltimore Drive Solar Project, a 4.95 MW AC community solar facility in Ford County, Illinois.
Working there
Besides its headquarters in Bethesda, Maryland, Eagle Creek has offices in Florham Park (New Jersey), Badin (North Carolina) and Neshkoro (Wisconsin). In November 2026 its job board listed hydroelectric plant operator and technician roles in Michigan, New York and New Hampshire and IT roles in Badin. Other openings included a corporate counsel in Bethesda, a business development director, environmental, health and safety coordinators for the Midwest and Northeast regions, and an energy manager and trader.
Its job ads list benefits that may include medical, dental and vision cover and a 401(k) match, along with HSA and FSA accounts, commuter benefits, voluntary life insurance, and a holiday and PTO schedule that includes time off for community volunteering.