Rejobs
Iberdrola Renewables
Iberdrola Renewables
14 open jobs · Posted 46 days ago

Project Manager - Security

Join Iberdrola Renewables as a Project Manager - Security in Orange or Boston, USA. Lead cybersecurity compliance programs, coordinate audits, and improve security processes. Benefit from a role focused on impactful energy sector projects with opportunities to collaborate across teams.

Salary
US$125,000–167,400/yr
Locations
Orange, CT Boston, MA
Workplace
On-site
Job type
Full time
Applies on iberdrola.wd3.myworkdayjobs.com

Check your inbox.

On a phone? Apply from a computer later.

Job description

Responsible for managing various strategically significant cyber security compliance programs and projects on behalf of the Affiliates of AVANGRID with objectives of timely and cost effective completion. This position will require working with multiple layers of geographically dispersed management, skilled technical staff, internal and external audit teams and business personnel.

Key Responsibilities

  • Program manage the design, documentation and implementation of Corporate Security Cybersecurity governance requirements specific to SOX 404 compliance. Hold regular program/project status meetings.
  • Coordinate cybersecurity specific internal and external audit activities, including interfacing with technical teams, defining mitigation strategies, and status reporting; to ensure compliance with procedures and maximize effectiveness.
  • Process improve various (as assigned) cross functional cybersecurity procedures; evaluate, analyze and recommend new cybersecurity processes, technical solutions and efficiencies. For example, segregation of duties, access controls, etc.
  • Provide timely and effective support relating to NERC-CIP requirements.
  • Create and maintain relationships with internal and external constituents to foster collaboration and cooperation for current and future organizational cybersecurity compliance objectives.
  • Assist in risk identification, communication and recommendations for mitigation.
  • Participate in special projects and assignments as business dictates

Education & Experience Required

  • Bachelor's degree with at least 10 years relevant experience required
  • Demonstrated participation in Information Technology General Controls audits
  • Demonstrated participation in NERC-CIP audits
  • Design and documenting of Sarbanes-Oxley (SOX) 404 processes and procedures
  • Working knowledge of Cyber/Information Security standards of best practice
  • Experience in data processing and/or Information Technology environments

Skills/Abilities

  • Strong program/project management skills.
  • Strong problem solving and analytical skills
  • Ability to understand and interpret complex compliance and regulatory requirements
  • Good interpersonal and communications skills

Preferred Qualifications

Energy Industry experience

Delivering for the Business:

  • Global view of the Business - Competent
  • Achieving Results and Continuous Improvements - Advanced
  • Initiative - Advanced
  • Innovation & Creativity - Competent

Global Relationships:

  • Flexibility & Globalization - Advanced
  • Customer Focus - Advanced
  • Communicating & Influencing - Advanced
  • Team Work - Advanced

Managing People:

  • Team Management - Advanced
  • Developing Others - Competent

Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country.

At Avangrid we provide fair and equal employment and advancement opportunities for all employees and candidates regardless of race, color, religion, national origin, gender, sexual orientation, age, marital status, disability, protected veteran status or any other status protected by federal, state, or local law.

If you are an individual with a disability or a disabled veteran who is unable to use our online tool to search for or to apply for jobs, you may request a reasonable accommodation.

Avangrid employees may be assigned a system emergency role and in the event of a system emergency, may be required to work outside of their regular schedule/job duties. This is applicable to employees that will work in Connecticut, Maine, Massachusetts, and New York within Avangrid Network and Corporate functions. This does not include those that will work for Avangrid Power.

Avangrid employees may also be assigned a NERC Reliability Standards compliance role supporting Critical Infrastructure Protection (CIP) and/or Operations and Planning (O&P) responsibilities. This is applicable to employees that will work in electric transmission, operations, and cyber security business areas in Connecticut, Maine, Massachusetts, and New York within Avangrid Network and Corporate business areas. NERC Reliability Standards compliance roles and responsibilities may include additional access protections, training, audit engagement, and required evidence retention, and will be communicated by the employee's management.

Pay & benefits

US$125,000–167,400 /yr
+ Generous performance‑based bonuses
Health insurance Dental insurance Vision insurance Retirement plan Paid time off Learning budget

About this role

Posted
14 Oct 2026
Timezone
UTC-05:00
Experience
10 years relevant experience

About Iberdrola Renewables

Company overview

Iberdrola, S.A., holding company of a multinational group

Bilbao, Spain

1901, as Hidroeléctrica Ibérica; Iberdrola was formed in 1992 through the merger of Iberduero and Hidroeléctrica Española

45,400 employees at the end of 2025; revenue of €45,547 million in 2025

What they do

Iberdrola describes itself as one of the world’s main energy companies and a leader in renewables, supplying energy to nearly 100 million people. It runs renewable, network and commercial activities in Spain, the United Kingdom, Portugal, France, Germany, Italy, Greece, the United States, Brazil and Australia, and treats markets such as Japan and Poland as growth platforms. The group is organised into country subholding companies, among them Iberdrola España, Scottish Power, Avangrid, Neoenergia and Iberdrola Energía Internacional.

At the end of 2025, its installed capacity stood at 58,343 MW: 40.5% onshore and offshore wind, 22% hydroelectric and 15% solar. That year it invested €5,260 million in its renewables business and installed more than 2,700 MW of renewable capacity.

In the United States, where it operates through its subsidiary Avangrid, it reached 11,000 MW of installed capacity in March 2026, with nearly 100 generation facilities in 25 states. In the United Kingdom, the group’s ScottishPower Renewables has more than 40 offshore and onshore wind farms and solar sites in operation. Its Strategic Plan 2025-2028 allocates €21 billion to renewables, mostly projects already under construction, and €37 billion to transmission and distribution grids.

Projects and track record

In France, its subsidiary Ailes Marines brought the Saint-Brieuc offshore wind farm into full operation in May 2024, with 496 MW and 62 Siemens Gamesa turbines: the second fully operational offshore wind farm in France and the first in Brittany. In Germany, Baltic Eagle, a 476 MW project developed with Masdar, reached full energisation in July 2025. It is part of the Baltic Hub, an offshore wind cluster of around 1.1 GW that also includes Wikinger and the 315 MW Windanker, northeast of the island of Rügen.

In Portugal, the Tâmega gigabattery, a 1,158 MW hydroelectric storage complex, was inaugurated in July 2022. In Spain, Iberdrola commissioned the Francisco Pizarro solar PV plant in August 2022 in Extremadura, with 590 MW and nearly 1.5 million modules.

Recent developments

On 21 April 2026, ScottishPower Renewables and Masdar announced the first turbine installed at East Anglia THREE, a £4 billion project. The 1.4 GW offshore wind farm is being built 69 kilometres off the Suffolk coast with 95 Siemens Gamesa turbines of more than 14 MW, and is the first in the UK with 115-metre blades. In Germany, on 31 August 2026, the transmission system operator reported that most of Windanker’s 21 turbines were already feeding electricity into the grid.

In April 2026, Cox completed its purchase of Iberdrola México for USD 4 billion. In the 12 months to September 2026, Iberdrola installed about 3,300 MW, part of the 15,000 MW of new capacity it plans to add between 2025 and 2030. In the first nine months of the year, its renewables investment went mainly to onshore and offshore wind, with more than 80% in the United States, the United Kingdom, continental Europe and Australia.

Working there

Iberdrola made 4,500 new hires in 2025, and its Strategic Plan 2025-2028 foresees hiring more than 15,000 new employees over four years. In the UK, East Anglia THREE will create 100 long-term roles in the East of England over its lifetime.

Its International Master’s Scholarship Programme, in its 17th edition in 2026, is open to university graduates and final-year students. After their studies, scholarship holders can apply for internships at the company and for vacancies in the countries where the group operates.

More grid and utilities jobs like this

Project Manager - Security
Iberdrola Renewables · US$125,000–167,400/yr