Rejobs
Scatec
Scatec
Company · 21 open jobs

Grid & HV Project Manager

Join Scatec in Bucharest as a Grid & HV Project Manager, overseeing interconnection works and EPC substation deliveries. This role offers hands-on experience in renewable energy projects, close collaboration with EETC, and professional growth in a dynamic environment.

On-site Full time UTC+02:00 Updated 1 day ago

Applies on careers-scatec.icims.com

Check your inbox.

On a phone? Apply from a computer later.

Overview

Grid & HV Project Manager Bucharest

Why this role matters

The position will be responsible for all the commercial and technical deliverables from project structuring through to technical handover on the Interconnection Works (MV Switchgear, HV substations and OHLs) for a dedicated Scatec project, or portfolio of linked projects. The position will build a strong relationship with EETC teams to move project Gerid Connection Agreements forward efficiently.

Lead the interfacing with EETC and other consultants on matters related to the interconnection of the renewable energy and process projects to the grid.

Lead the team in the drafting and review of relevant documents to ensure the technical requirement of the projects and Grid Connection Contracts are complied with.

The position will transition to lead the tendering, selection and execution of turnkey EPC substation deliveries on behalf of the Scatec project execution team. Throughout execution the position will be responsible for ensuring EETC compliant substations are delivered on time, connected to grid securing the necessary approvals from EETC.

What you'll be doing

Support to Structuring Phase of projects

  • Lead the contracting and delivery of substation EPC packages including any early engineering and approvals processes.
  • Monitoring and facilitating the review of the Contractors detailed design, ensuring compliance with Scatec functional requirements, site and permit and licensing conditions, local codes, EETC specifications and industry best practice
  • Define and ensure that the project programme is reasonable and accurately considers the detailed Design Timeline, key equipment procurement and allowance for commissioning, testing and local Grid Connection requirements. Ensure that the grid connection and substation delivery timelines meet the overall renewable energy plant commissioning timeline.
  • Manage and interface with contractors and equipment suppliers to establish, negotiate and align all technical aspects / approvals of the project.
  • Manage the complete Utility interface process on behalf of Scatec from approval of detailed design, through construction, and completion under the Grid Connection Agreement / EPA
  • Establish timelines and schedules based on the project schedule and contracts to ensure successful interconnection, commissioning, and grid code compliance.
  • Assist the PM to establish and mitigate technical and commercial risks through an effective and updated Risk management system.
  • Conduct site assessments accurately and timeously based on the information provided
  • Support in evaluating the technical information and provide input to site selection and early phase project development and concept design amongst others
  • Support in completing design packages related to the grid connections
  • Lead in securing proper grid connection contracts and cascading back-to-back requirements to execution phase subcontracts - namely Substation EPC Contracting.
  • Interface with EETC and other stakeholders to establish the project parameters and technical requirements

Support to projects in delivery/execution

  • As the project moves into execution, the role is a continuation and development on the above:
  • Manage and assess design change requests to be approved by the Lead Engineer and Senior Project Manager
  • Manage, clarify and agree interfaces towards the grid and the grid operator
  • Management of Governmental/Public/Grid Operator Stakeholders with approval process related to technical and commercial documentation and permits, licenses, authorizations, concessions needed during the execution of the HV and TX scope until commercial operations
  • Lead project meetings with contractors and utilities.
  • Be on site / visit site on a regular basis to ensure that construction is being implemented as per the design, utility requirements and in line with relevant technical standards and desired quality.
  • Manage EPC Contractors in the delivery of griud connections and substations, with integration to RE plants.
  • Build a small and efficient team to supervise the delivery and construction of substations under EPC Contracts.
  • Provide early warning to the Senior PM on any issues in the project that may influence connection dates or the quality of the final product
  • Contribute to drafting the relevant project reports (Bi-weekly, monthly etc.).
  • Establish the plant commissioning and utility compliance plans and procedures.
  • Plan and manage the Grid Code Compliance tests on site.
  • Support in project close out phase by preparing and gathering technical documents as needed to achieve TTO on time.
  • Assist in establishing and evaluating quality expectations and documentation during construction.
  • Represent Scatec in the Operating Committee and EETC activities w.r.t. deliverables for Grid Code compliance and COD.
  • Ensure lessons learned are transferred between different project sites.
  • Ensure designs are implemented based on the at least the following documents:
  • Detailed Engineering Drawings and Specifications
  • Supplier Equipment Manuals
  • Lead contract management of subcontractors with the Scatec procurement team.
  • Assist in testing and commissioning activities towards Commercial Operation Date

Lead the project close out phase towards taking over of subsrtations and energisation.What you'll bring:

  • Degree in Electrical / Electronical or Electromechanical Engineering
  • 7+ year of Project Engineering experience - Minimum 5 years' experience in construction projects with Sub Stations and Transmission Lines
  • Previous experience on handling communication with local utility and other relevant authorities and stakeholders
  • An excellent knowledge of MS Office
  • Based in Country and able to travel to site frequently.
  • Fluent in both English and Romanian
  • Driver's License
  • An excellent knowledge of MS Office Ideal:
  • Project Management Certificate
  • Commissioning and tests of High Voltage Networks and Sub-Stations
  • Masters Degree in Engineering

As a general note, the position is not expected to be an expert in the detailed design of Grid Connections, or in Line design, but is expected to be well versed and understand core elements of the design philosophy of the plant.

Similarly, not expected to be a legal expert but should have a clear experience and understanding of how Contracts are executed.

What you'll gain

  • Professional growth through ownership, exposure, and meaningful contribution from day one
  • Hands-on experience in a role where the challenge is energising, fast-moving, meaningful, and built on learning through doing.
  • Broader commercial understanding through close collaboration with cross-functional teams
  • Stronger financial, performance, and decision-support skills in a real-world context

If you are motivated by analysis with purpose, commercial insight, and real operational impact, this could be a strong next step in your career.

What we offer

At Scatec, you will be part of a company with a clear and ambitious purpose, working on renewable energy solutions that make a lasting difference. You will gain responsibility early, learn from experienced colleagues, and build your capabilities in a business that offers global exposure, strong development opportunities, and meaningful work in the energy transition.

Scatec is an equal opportunity employer. All qualified applicants will receive consideration for employment based on merit, competence, and business needs.

We review applications on an ongoing basis.

Shall understand EETC grid connection approval, permitting, commissioning and contracting processes.

About this role

Posted
28 Oct 2026
Updated
28 Oct 2026
Job type
Full time
Workplace
On-site
Sectors
Working hours
UTC+02:00
Experience
Senior
Employerscatec.com
LinkedInScatec

About Scatec

Company Overview

Name

Scatec ASA, a publicly traded Norwegian power producer and project developer listed on Euronext Oslo

Headquarters

Oslo, Norway

Founded

2007

Size

Approximately 750 employees globally (source: pitchbook.com). Revenue of NOK 4.37 billion in 2024 (source: stockanalysis.com).

What They Do

Scatec ASA specializes in the development, construction, ownership, and operation of large-scale power assets with a primary focus on utility-scale solar photovoltaic (PV) systems and battery energy storage solutions. Over time, the company has expanded its technology portfolio to include hydropower and selected green hydrogen projects, integrating electrolyzers to support power-to-X initiatives (source: scatec.com). Their business model combines operating assets generating EBITDA with a robust pipeline of projects under construction or in backlog, spanning multiple continents including Europe, Africa, Latin America, and Asia (source: scatec.com). Scatec serves a diverse client base comprising governments, state utilities, industrial offtakers, and project finance partners, often securing long-term power purchase agreements (PPAs) to underpin project economics (source: live.euronext.com). Their integrated approach as a developer-operator with a global multi-gigawatt pipeline and a mix of operating cash-flow assets plus construction-stage projects distinguishes them in the renewable energy sector (source: scatec.com).

Projects & Track Record

Scatec's portfolio includes some of the world's largest hybrid solar and storage projects, such as the Kenhardt facility in South Africa, which combines 540 MW of solar PV with 225 MW/1,140 MWh of battery storage, representing a significant milestone in integrated renewable energy assets (source: scatec.com). In South Africa alone, the company operates 730 MW of solar and storage assets at a 49% economic interest (source: scatec.com). In Brazil, Scatec operates 693 MW of solar capacity at a 33% economic interest and has initiated construction of the 142 MW Urucuia solar project, backed by a 10-year PPA signed with Statkraft Energia do Brasil (source: live.euronext.com). The Philippines portfolio includes 673 MW of hydropower and storage assets at a 50% economic interest, with advanced battery storage projects such as Binga and Magat, each rated at 56 MW/56 MWh (source: scatec.com). In Botswana, Scatec commenced commercial operations of a solar power plant in March 2025 and holds the Mmadinare Phase 1 solar asset in its operating portfolio (source: live.euronext.com). The company also secured a 288 MW solar PV award and a battery storage project in South Africa through government tenders in late 2024 and mid-2025 respectively (source: live.euronext.com). In Egypt, Scatec signed a landmark 25-year PPA for a 1.1 GW solar plus 100 MW/200 MWh battery storage project and is advancing the Egypt Green Hydrogen initiative, which includes 260 MW of solar and wind capacity alongside a 100 MW electrolyzer, with ammonia offtake agreements in place (source: zawya.com). In Tunisia, the company began construction of the Tozeur and Sidi Bouzid solar projects, holding a 51% stake in the $88 million investment, supported by a 25-year PPA (source: zawya.com). This geographically diverse project backlog underscores Scatec's strategic growth across multiple continents (source: scatec.com).

Recent Developments

Throughout 2024 and 2025, Scatec has consistently announced new power purchase agreements, project commencements, and commercial operation milestones across key markets including Brazil, South Africa, Tunisia, Botswana, and Egypt (source: live.euronext.com). Notable highlights include the 142 MW Brazil PPA signed in April 2024, the 288 MW solar award in South Africa in December 2024, and the 120 MW Tunisia PPA in March 2025 (source: live.euronext.com). In March 2025, Scatec commenced commercial operations of a solar plant in Botswana and secured a solar-plus-storage PPA with Egypt Aluminium, further expanding its footprint in Africa (source: live.euronext.com). The company also won a battery storage project in South Africa in May 2025 and began construction of the Egypt solar-plus-BESS project the same month (source: live.euronext.com). Additionally, Scatec secured a EUR 30 million grant from the PtX Development Fund in October 2024 to support the Egypt Green Hydrogen project, which progressed toward final investment decision in 2025 with an ammonia offtake agreement with Fertiglobe (source: mees.com). The 2024 annual report and 2025 investor presentations emphasize a growing operating asset base, stronger EBITDA generation, and a strategic focus on solar, storage, and hydrogen technologies (source: scatec.com).

Working There

Scatec offers career opportunities across a broad spectrum of functions including project development, engineering, construction management, operations and maintenance, trading and market access, finance, legal, ESG and reporting, procurement, and corporate support, reflecting the complexity of its integrated renewable energy business model (source: scatec.com). The company maintains a global presence with offices and project sites in Oslo, South Africa, Brazil, the Philippines, Egypt, Tunisia, and Botswana, providing diverse geographic opportunities for professionals (source: scatec.com). Scatec emphasizes leadership diversity, with 32% of leadership roles held by women as of Q4 2025, and prioritizes safety, reporting a lost-time incident frequency rate of 0.6 per million hours worked, indicative of a strong safety culture and formal management systems (source: marketscreener.com). The company’s mid-sized international structure supports roles for both experienced energy professionals and corporate staff, fostering a dynamic and inclusive workplace environment (source: pitchbook.com).

See how you’re connected

See your contacts at Scatec on LinkedIn and tap your network when applying.

View connections

More smart grid jobs like this

Grid & HV Project Manager
Scatec