Job description
Your Responsibilities
- Complete Audit of EC critical suppliers
- Travel for audit purposes.
- Strong coordination within GP departments and Cross functional coordination.
- Supplier Evaluation as per Enercon standards.
Your Tasks
- Supplier Audits-Visit EC suppliers for audit
- Coordinate with Category Management to get necessary inputs for audit (capacity planned, Min order obligation etc.)
- Coordinate with SCDDA team to understand the sustainability issues with suppliers and validate it during the audit
- Coordinate and report for HSE compliance
- Coordinate with contract management team to validate contract adherence
Supplier Evaluation-
- Coordinate with the Category management team to gather the information for supplier Evaluation as per Enercon defined process
- Coordinate with Cross functional dept. to collect the supplier evaluation data.
- Automate the supplier Evaluation process till the extent possible and Modify the procedures accordingly.
Deliverables
- Preparation of supplier audit reports for management submission and GP records
- Presentation of audit reports.
- Complete the supplier Evaluation for every half yearly review and reporting to management.
- Follow-up for actions coming out of the evaluation.
Your Qualifications
- 8-10 Years of experience
- Excellent oral and written communication skills.
- Engineering in Mechanical/ Environmental/ equivalent
- Knowledge on EHS, audits, compliances and Supply chain Risks.
- Knowledge on operating Power BI is an added advantage
About this role
About ENERCON
Company overview
ENERCON (holding company UEE Holding SE & Co. KG), wholly owned by the Aloys Wobben Stiftung
Aurich, Germany
1984
about 12,800 employees (end of 2025); revenue 2025: EUR 4.45 billion
What they do
ENERCON specialises in the development, production, sales and service of onshore wind turbines. All its current turbines use a gearless direct drive with a synchronous generator, with permanent-magnet (PMG) technology or electrical excitation depending on the type.
The range covers four turbine models on two platforms, rated 4 to 7 MW. The EP5 platform for medium to low wind sites includes the E-175 EP5 E1/E2 with 6 and 7 MW and a 175-metre rotor, and the E-160 EP5 E3 with 5.56 MW and 160 metres; the EP3 platform for wind class IIA sites offers the E-138 EP3 E3 with 4.26 MW and 138 metres.
In September 2025 ENERCON turned from a turbine maker with service into a solution provider. On request it builds hybrid power plants of wind farm, battery storage and grid connection, and for operation it offers monitoring, proactive maintenance, spare parts management and cyber security packages, among other services.
ENERCON laid the foundation for its operations and maintenance business more than 30 years ago with the ENERCON Partner Konzept (EPK). Today 58 GW are under service contract, looked after by more than 5,000 service staff at over 350 service stations worldwide, and in its core markets ENERCON ensures 97 percent technical availability.
ENERCON runs its own plants in Germany, Portugal and Turkey: Aurich for rotor hubs and nacelles, Magdeburg for generators, and Viana do Castelo and Izmir for rotor blades. Partners in China, India and Turkey also make rotor blades and generators.
Projects and track record
In 1993 ENERCON introduced the E-40 / 500 kW, its first generation of gearless wind turbines. More than 2,700 units of the E-66 / 1.5 MW, launched in 1995, were sold worldwide; the E-82 / 2 MW of 2005 is still the most frequently erected ENERCON turbine, and the E-126 / 7.5 MW was in its day the most powerful onshore wind turbine in the world. In 2017 ENERCON took over the Dutch manufacturer Lagerwey and integrated its PMG technology.
ENERCON now has more than 65 gigawatts installed, with turbines in more than 50 countries. In Turkey, ENERCON and Enerjisa Üretim agreed 1,000 MW for the YEKA 2 project: after 750 MW in the first phase, a supply contract for the remaining 250 MW with 60 E-138 EP3 E2 turbines followed in March 2024.
In Japan, ENERCON completed the first phase of the Shirakami project in September 2024 with 14 E-115 EP3 E3 turbines and 58.8 MW. At the Mailiao wind farm in Taiwan, three E-115 EP3 turbines for Formosa Heavy Industries replace four old ones and raise output fivefold.
Recent developments
In 2025 ENERCON installed 2,785 MW worldwide (2024: 2,776 MW). In Germany its installed capacity rose from 1,188 MW in 2024 to 1,592 MW, and by number of turbines ENERCON led the market there with 313. The company put its order intake at almost EUR 6 billion, about 40 percent more than the year before.
In December 2025 the second prototype of the E-175 EP5 E2 started feeding power into the grid at the Janneby wind farm, with a 175-metre rotor, a 132-metre hub height and 7.0 MW rated power. In January 2026 Windpower Monthly gave the model the gold medal in its Turbines of the year award 2025 in the category for onshore turbines of 7.0 MW and above, and in August 2026 TÜV Süd issued the final type certificate.
In April 2025 ENERCON and RWE signed a letter of intent for a long-term European onshore partnership in which ENERCON supplies, installs and maintains the turbines. In June 2025 ENERCON signed a partnership contract for about 100 turbines with enercity Erneuerbare, with a project volume of up to EUR 800 million. In April 2026 came a framework agreement in Canada for more than 440 MW with over 60 E-175 EP5 E2 turbines, with first deliveries planned for early 2027.
In May 2026 ENERCON announced its own rotor blade plant for the E-175 EP5 E2 in Bergama, Izmir province, with 700 jobs and capacity for up to 150 blade sets a year; ENERCON has about 4 GW installed in Turkey. In September 2026 ENERCON and financing partners launched the ENERCON Finance Solutions Funds, which offers operators mezzanine loans of up to EUR 10 million per project.
In July 2026 ENERCON signed its first Wind+ Storage projects in Germany with Planungsbüro Düser: at Möhnesee-Westrich a 5 MW / 10 MWh battery is combined with two E-138 EP3 E3 turbines, and at Soest-Meiningsen a 15 MW / 30 MWh battery is planned; both are due to start operating in the first quarter of 2027. In September 2026 PNE and ENERCON presented the Beerfelde energy park in Brandenburg, which is to combine about 98 MW of wind power from 14 E-175 EP5 E2 turbines with storage of about 32 MW and 70 MWh.
Working there
ENERCON is organised in five global regions: APAC, CAMEA, CNE, NA and SWELA. More than 7,000 people work in Germany, home to all central functions, including procurement, IT, HR, finance, marketing and project management, as well as research and development in Aurich, production in Aurich and Magdeburg and over 10 service sites.
In Portugal ENERCON employs about 1,400 people at more than 10 sites, with rotor blade production in Viana do Castelo since 2007. Turkey has over 500 employees, and Canada about 270 at several offices and 16 service sites, where service jobs are most in demand.
Benefits include flexible working time models and mobile work, a company pension, training from specialist seminars and language courses to leadership training, and company fitness and health checks. Entry areas range from controlling and finance, procurement, HR, IT, logistics and marketing to research and development, production, project management, sales and service.
At selected German sites ENERCON trains apprentices, for example as mechatronics technicians, industrial electronics technicians or IT specialists, and in Aurich it offers dual degrees in Business Administration, energy engineering, computer engineering and business informatics. Pay starts at no less than €1,010 gross a month, with 30 days' paid holiday. Students can do internships of 4 weeks or more, work as working students for up to 20 hours a week in term and up to 40 in the breaks, or write their thesis.