Rejobs
RTE
RTE
48 open jobs · Posted 4 days ago

Internship - causal detection of network data drift

Join RTE in Paris, France, as an Internship - causal detection of network data drift. Analyse grid data, review causal AI methods and test them to identify patterns that may affect model performance. Work with real data alongside the CEA, with dedicated mentoring and transport support.

Salary
Not stated
Location
Paris, France
Workplace
On-site
Job type
Internship
Applies on rte-france.com

Check your inbox.

On a phone? Apply from a computer later.

Job description

Vos missions

Lieu : La Défense

Durée et/ou période du stage : 6 mois à partir de mars 2027

Le réseau électrique français, en constante évolution, génère des flux de données massifs et dynamiques. Ces données sont soumises à des variations imprévisibles (ou data drift), causées par des changements structurels (intégration de nouvelles sources d'énergie, modifications de la topologie du réseau), des phénomènes externes (conditions météorologiques, pics de consommation) ou des anomalies (défauts, pannes, cyberattaques). Pour garantir la sûreté et la stabilité du réseau, RTE développe AssistFlux, un assistant intelligent d'aide à la conduite du réseau électrique, basé sur l'IA pour proposer des parades adaptées et résoudre les contraintes apparaissant sur le réseau. Cependant, les performances de ces modèles dépendent de la qualité des données d'entraînement : un data drift ( l'évolution des distributions des données dans le temps) peut dégrader les performances du modèle en production, compromettant ainsi la fiabilité des recommandations proposées.

Votre stage s'inscrit dans ce défi : explorer les méthodes d'IA causale afin de prédire les performances d'un modèle de référence (appris). Plus particulièrement, vous chercherez à identifier des schémas causaux dans les données utilisées pour l'entraînement (variables explicatives X) combinée à l'erreur du modèle de référence. Ce travail s'appuiera sur des données réelles et des méthodes innovantes.

En tant que stagiaire, vous serez intégré au sein du pôle IA-GRID de la Direction Données, Intelligence Artificielle et Analyse (DIA2). Le stage s'effectuera en cotutelle avec le CEA. Ce stage vous permettra de comprendre les enjeux du système électrique à court terme, le fonctionnement du réseau et de mettre en œuvre l'état de l'art des méthodes de détection de ruptures dans les schémas causaux.

Principales activités :

  • Analyser et s'approprier les données disponibles pour les prévisions et celles disponibles pour l'apprentissage des modèles
  • Réaliser un état de l'art des méthodes d'études de causalités pour la détection de data drift qui pourraient être adaptées au cas d'usage de données réseaux.
  • Appliquer ces méthodes pour identifier la présence de schémas causaux dans les données
  • S'assurer que les schémas causaux identifiés sont correctement appris par les modèles d'apprentissages utilisés et proposer les adaptations adéquates pour améliorer l'apprentissage si nécessaire (modification de la loss par exemple).

Le profil recherché

Vous êtes actuellement étudiant en dernière année d'école d'ingénieur ou vous suivez un cursus universitaire en bac+ 5 en data science, IA, mathématiques appliquées ou informatique avec un intérêt marqué pour les enjeux énergétiques.

  • Vous disposez de connaissances en statistiques et apprentissage machine.
  • Vous savez utiliser un langage de type python ou R.
  • Vous avez une appétence pour comprendre le fonctionnement système électrique et les phénomènes physiques associés aux pertes.
  • Vous savez faire preuve de créativité et de rigueur.
  • Vous avez une bonne capacité d'analyse et de recul sur les résultats.

Informations supplémentaires

En nous rejoignant, vous intégrez une entreprise engagée dans votre réussite et tournée vers l'avenir :

  • L'opportunité de contribuer à des projets concrets, innovants et à fort impact
  • Une gratification mensuelle attractive, déterminée en fonction de votre niveau d'études
  • Un accompagnement par un tuteur dédié tout au long de votre stage pour favoriser votre montée en compétences
  • Jusqu'à 5 jours de congés rémunérés, selon la durée de votre stage
  • Des avantages complémentaires : prise en charge des frais de transport, indemnité repas et aide au logement (sous conditions).
  • De réelles perspectives d'avenir : possibilité de poursuivre votre parcours chez RTE (embauche ou poursuite en alternance)...

...Si le courant passe, ça peut durer longtemps !

Dans le cadre des activités relatives à l'emploi proposé, vous pouvez être amené(e) à accéder à un (ou des) site(s) relevant de la responsabilité de RTE. A cette fin et dans le respect des articles R1332-22-1 et suivants du Code de la Défense, nous vous informons qu'une enquête administrative est susceptible d'être réalisée à notre demande par l'autorité administrative, afin de vérifier qu'aucun fait vous concernant n'est incompatible avec l'accès envisagé.

Pay & benefits

Paid time off Commuter benefits Meal allowance

About this role

Posted
24 Nov 2026
Timezone
UTC+01:00
Experience
Étudiant en dernière année d'école d'ingénieur ou en cursus universitaire bac+5
Employer rte-france.com LinkedIn RTE

About RTE

Company overview

RTE (Réseau de Transport d’Électricité), owned through CTE by EDF (50.1%), the Caisse des Dépôts (29.9%) and CNP Assurances (20%)

Paris La Défense, France

2005

About 10,800 employees (end of 2025); revenue of EUR 6,658 million in 2025

What they do

RTE, the operator of the French electricity transmission network, has a public service mission: to guarantee the electricity supply at every moment, everywhere in France. It manages electricity flows in real time and keeps generation and consumption in balance, on a network that is the most extensive in Europe and has 37 interconnections with neighbouring countries. In 2025 the network had 106,440 km of lines, of which 97,850 km were overhead, 8,000 km underground and 590 km subsea.

RTE carries out its public service missions as a regulated monopoly: most of its resources come from the transmission network tariff, whose level is set by the energy regulator, the Commission de régulation de l’énergie (CRE). It was created in 2005 as a société anonyme (public limited company), then a 100% subsidiary of EDF.

Projects and track record

In June 2025 RTE made the grid connection of the Yeu and Noirmoutier offshore wind farm fully available, the 7th offshore wind farm it has connected to the public transmission network. In April 2026 it handed over the grid connection of the future Dieppe-Le Tréport offshore wind farm, built in less than four years, with the 225,000/400,000-volt Grande Sole substation at Petit-Caux and a double underground and subsea 225,000-volt link. It is the 3rd offshore connection made available to producers in Normandy, after Fécamp (500 MW) and Calvados (450 MW).

In the same month RTE completed the cable of the Éoliennes Flottantes du Golfe du Lion floating pilot farm (EFGL), which links the lead turbine, more than 16 km off Leucate and Le Barcarès, to the onshore grid. In September 2025 it awarded Eiffage a contract worth more than EUR 1.5 billion to build and install the offshore electrical platforms (substations and foundations) of the Bretagne Sud, Narbonnaise Sud-Hérault and Golfe de Fos farms, planned under the second multi-year energy programme (PPE 2).

Celtic Interconnector is a 575 km, 700 MW direct-current link between the French grid (La Martyre) and the Irish grid (east of Cork), due to be commissioned in 2028. The Golfe de Gascogne interconnection, which will link Spain and France from 2028, is backed by EUR 800 million of financing from the European Investment Bank.

On land, more than 200 electrification projects in heavy industry or data centres have already secured their access to the grid, with a combined capacity of 33 GW. RTE has signed its first fast-track contract, with Campus IA, for the accelerated connection of a digital infrastructure campus that will eventually draw 1.4 GW, with a first consumption step available from 2027.

Recent developments

In 2025 RTE invested EUR 3,346 million, 29% more than in 2024, more than doubling its investments in 4 years (+112%); its revenue rose by 20%. In October 2026 it launched a EUR 1 billion green bond issue.

According to the CRE, RTE’s ten-year network development plan (SDDR) commits investment that could reach nearly EUR 100 billion by 2040; in February 2026 the regulator said it was broadly favourable to the plan. On 30 March 2026 Émilie Piette was appointed chair of the management board of RTE, with effect from 7 April 2026.

Working there

RTE’s investments create a need to recruit nearly 4,300 people between 2025 and 2030, an average of 700 a year, from baccalauréat level to engineer level. In 2025 the company welcomed more than 700 new employees, including 290 in new jobs, and it has more than 250 interns and more than 500 apprentices.

Its job, internship and apprenticeship offers, including permanent (CDI) contracts, cover seven job families: support functions, customers and electricity markets, engineering studies and projects, network operation and control, network maintenance, R&D, innovation and data, and IT, telecoms and cybersecurity. The RTE Académie, with many simulation platforms and a training substation, welcomes more than 7,000 trainees a year.

All RTE employees are hired in France, and statutory staff are also covered by the national statute of the electricity and gas industries (IEG); a profit-sharing agreement signed in 2025 covers the years 2025 to 2028. Since July 2026 the 550 employees of RTE Hauts-de-France, until then spread over two sites in Lille, have worked together in the new regional headquarters in Lille.

More grid and utilities jobs like this

Internship - causal detection of network data drift
RTE