Rejobs

Renewable energy jobs at Antora Energy

Antora Energy of Sunnyvale, California, makes thermal batteries that store electricity as heat in carbon blocks and deliver heat or power to industry.

Sunnyvale, CA 251–500 employees Energy storage · Hydropower · Electrification and efficiency antora.com
Alert me to new jobs here
Antora Energy
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
20 jobs · updated 2 days ago

Not seeing the right role? Join our talent pool

About Antora Energy

Company overview

Antora Energy, Inc.

Sunnyvale, California, United States

2018

Hundreds of employees at its San Jose manufacturing hub (2026)

What they do

Antora makes thermal batteries that store low-cost electricity as heat in insulated blocks of solid carbon and deliver it around the clock as heat or power. The blocks hold energy at temperatures up to 2,400°C, enough to serve continuous industrial demand for days on end. The batteries are built for renewable fuels, food and beverage, data centres, chemicals, utilities, mining and mineral refinement, pulp and paper, refining, steel and iron, and concrete and lime.

Its HeatCore system, available today, delivers heat at up to 375°C from modules with a thermal output of 300 kWth, and electricity from a modular power block of thermal storage with an attached steam generator. For future products, Antora is building in thermophotovoltaic (TPV) technology, which turns light from the hot carbon blocks into electricity with no moving parts. It opened its US factory in 2024, now one of the largest battery factories in the country.

Projects and track record

In September 2023 Antora launched a commercial-scale thermal battery at Wellhead Electric Company's facility near Fresno, California. In May 2026 it commissioned Project Big Stone, a 5 GWh multi-day thermal storage system at the Big Stone City, South Dakota, plant of POET, the world's largest biofuel producer. The project deploys over 200 of Antora's thermal batteries and went from initial construction to delivering energy in under 12 months.

Antora supplies POET with round-the-clock energy under a long-term heat offtake agreement. To charge, the batteries draw surplus electricity from nearby wind farms that would otherwise go to waste.

Recent developments

In July 2026 Antora closed $550 million in Series C funding, co-led by G2 Venture Partners and Eclipse, to deploy large-scale projects, expand production and set up a second US manufacturing hub. In April 2026 it added two new facilities near its San Jose factory, doubling its manufacturing and operations space.

In September 2026 Antora announced a collaboration with GrafTech to develop carbon-based materials for its battery modules at GrafTech's St. Marys, Pennsylvania facility. In October 2026 it announced a 5.8 GWh thermal storage project at Pratt Energy's biorefinery in Pratt, Kansas, which will supply energy under a long-term heat offtake agreement from 2027.

Working there

Antora's openings span departments from heat to power and manufacturing operations to commercial, finance, government affairs, EH&S, people operations and product development. Roles are listed in San Jose and Sunnyvale, California; Big Stone City, South Dakota; Pratt, Kansas; St. Marys, Pennsylvania; and remote in the USA. Its workforce includes welders, electricians, pipefitters and machinists.

Published benefits include stock options and a 401(k) plan with a company match, a clean commute stipend, 15 paid vacation days a year rising with tenure, 12 paid holidays and 16 weeks of paid parental leave. In-person and remote team members meet each quarter for a Home Week.

For the permanent operations roles at the Pratt plant, Antora will prioritise local candidates, and it runs a paid internship programme with Pratt Community College for local students.

Last updated Nov 22, 2026 · Report an issue