About BW ESS
Company overview
BW ESS Limited, part of BW Group
2021
What they do
BW ESS is a developer, owner and operator of battery energy storage systems (BESS), which help optimise energy markets, integrate renewable resources and prepare the grid for future demand. It belongs to BW Group, a global energy and maritime infrastructure company, and is led by its co-founder and chief executive Erik Strømsø, formerly a senior equity partner and head of Asia Pacific at Pareto Securities.
The company has more than 1.8 GWh of battery storage in operation, about 10 GWh under or pre-construction and a development pipeline of several gigawatts across the UK, Australia, Italy, Germany, Spain, Sweden and France. As a long-term owner-operator, it keeps direct oversight of its sites throughout their operating life. In the UK it focuses on sites of more than 100 MW with 3 to 5 hours of storage, close to the major load centres of the Midlands and the South of England.
Projects and track record
Since 2023 BW ESS and Ingrid Capacity have developed battery storage across Sweden’s grid, mainly in the SE3 and SE4 price areas. Their portfolio of 14 facilities, the largest in the Nordics, was inaugurated in October 2024. In April 2025 a SEK 628 million green loan from Nordea Bank financed its 211 MW / 211 MWh, the first external financing BW ESS had raised.
In October 2024 BW ESS agreed to acquire all remaining shares in Penso Power, of which it was already the largest shareholder. Its 100 MW / 331 MWh Bramley battery in Hampshire was energised in February 2025 as the largest of its kind to enter operation in the UK, and the first project in Europe with Sungrow’s liquid-cooled PowerTitan technology. Bramley runs under a seven-year tolling agreement with Shell Energy Europe, the first announced long-term tolling agreement for a single battery asset in Great Britain, and in May 2025 Westpac and UOB financed it in equal shares.
In Italy, the 107 MW / 515 MWh Chignolo project in the province of Pavia holds a capacity market contract for delivery year 2027, and the 97 MW / 828 MWh Cerignola project in Apulia, due to enter operation in 2028, won a MACSE contract in October 2025 with 15 years of contracted cash flows from Terna. Both are under construction, alongside a pipeline of 14 mid-stage projects totalling 2.9 GW. In Australia, the 240 MW / 480 MWh Mornington battery at Tyabb on Victoria’s Mornington Peninsula and the 250 MW / 550 MWh Pine Lodge project in regional Victoria are both under construction.
Recent developments
In September 2025 AIP Management agreed to acquire a 49% stake in BW ESS’s 700 MW UK portfolio of Bramley, Hams Hall and Berkswell, with BW ESS keeping 51%. The first phase of Hams Hall in North Warwickshire, 350 MW / 1,243 MWh, entered commercial operation in October 2026 as Europe’s largest battery by storage capacity, and the site will reach 400 MW / 1,424 MWh after a second phase. EDF optimises it under a 10-year floor agreement, and OCBC, Rabobank and Societe Generale provide its debt financing in equal proportions.
The 200 MW / 857 MWh Berkswell battery near Solihull entered construction in September 2026 and is expected to start operating in the fourth quarter of 2027, with Danske Commodities optimising it under a 10-year agreement. On 1 July 2026 BW ESS broke ground on the 1,000 MW Klostermansfeld battery in Saxony-Anhalt, which with up to 5,700 MWh is the largest project of its kind in Germany; BW ESS first invested in it in 2024 and took full ownership in 2026. In August 2026 it acquired the 250 MW / 1,000 MWh Yanco battery in New South Wales from ACEnergy, with commercial operation planned for 2028.
In Spain, a joint venture with Ibersun signed in June 2025 is progressing an initial 2.2 GW pipeline of eight projects, owned equally, and in September 2026 BW ESS bought two projects in the Valencia region totalling 126 MW / up to 675 MWh from Navacant. In October 2026 it entered France, its seventh market, by acquiring two 100 MW / 400 MWh projects from Recurrent Energy in Calvados and the Eastern Pyrenees. In November 2026 it partnered with Wattmen to develop about 500 MW of projects in France over three years.
Working there
BW ESS has offices in Zurich, London, Madrid and Richmond, Australia. Its job board lists openings in commercial, finance, legal, operations and technology roles in London, Hamburg, Melbourne and Milan, among them asset management and grid management. The company says it prioritises talent density over team size, and that its culture values flexibility over rigid structures, context over control and results over processes.