Not seeing the right role? Join our talent pool
About EDP
Company overview
EDP, S.A., listed on Euronext Lisbon; China Three Gorges Corporation holds 22.20% of its capital (2025)
Lisbon, Portugal
1976
about 11,900 employees (2025); revenue of €15,607 million (2025)
What they do
EDP produces, manages and distributes energy, combining renewable generation, networks, energy management and customer solutions. The group operates mainly in Europe (Portugal, Spain, France, Poland, Romania, Italy, Belgium, the United Kingdom, Greece, Germany and the Netherlands), Brazil, North America and Asia. In the first half of 2026 it had 32.8 GW of installed capacity, 87% of it renewable. Electricity networks are a major business in Portugal, Spain and Brazil.
In wind power, EDP has 12.5 GW installed, more than 6.5 GW of it in North America and over 4.5 GW in Europe. In hydropower it has more than 6.5 GW, 5.5 GW in Iberia and 1.4 GW in South America. Its wind, solar and battery storage business is EDP Renováveis (EDPR), in which EDP, S.A. raised its stake to 71.32% in 2025.
Projects and track record
EDP's first major power facility, the La Malva hydroelectric station in Asturias, Spain, began operating on 9 September 1917. In Brazil, the Peixe Angical hydroelectric power station on the Tocantins River has a capacity of 498.75 MW. In Portugal, WindFloat Atlantic, off Viana do Castelo, was the first floating wind power plant in continental Europe, and the Alqueva floating solar plant was inaugurated in 2022.
Recent developments
At its Capital Markets Day in November 2025, EDP presented its business plan for 2026-2028, which provides for investment of around €12 billion over the period.
In July 2026, EDP began testing the batteries at Las Lomillas in Cuenca, Spain, where three renewable technologies share a single grid connection point, for a total of 122 MW of wind, solar and battery storage. In August, EDP Renewables North America completed Sandrini Energy Storage, a 92 MW / 368 MWh battery system in California. In October, IFC provided a $222 million loan for a 200 MW EDP solar photovoltaic plant in Mexico.
In November 2026, EDP completed the Pracana hybrid park in central Portugal: 89 MW combining a 48 MW solar plant with a 41 MW hydropower plant that has operated since 1951. In Portugal it has more than 1,900 EDP Solar Neighbourhoods in operation, with around 50 MWp of installed capacity.
Working there
In 2025, EDP employed people of 70 nationalities and held Top Employer certification in 13 markets. Its Networks teams work in operations and maintenance, automation and telecontrol, metering, planning and projects, and business development; its renewable generation asset teams work in operations and maintenance, engineering and construction, planning and projects, and business development.
EDP offers a hybrid working model in all compatible roles, health insurance for employees and their families, and six working days a year for volunteering. For those starting their careers, it runs the Global Graduate Program.