Not seeing the right role? Join our talent pool
About Grenergy
Company overview
What they do
Grenergy is a Spanish multinational clean-energy producer that develops, builds and operates solar photovoltaic plants and is a pioneer in energy storage. It designs and builds its own plants in-house, runs Greenbox, its stand-alone battery platform in Europe, and sells electricity in Chile through its retailer GR Power.
It operates in three regions: Europe (Spain, Italy, Germany, Poland, Romania and the United Kingdom), North America (the United States) and Latin America (Chile, Peru, Mexico and Colombia). It has more than 13 local offices and has built more than 100 plants.
Projects and track record
Its flagship project is Oasis de Atacama in northern Chile, with 2.5 GW of solar generation and 14.1 GWh of storage. In June 2026 Grenergy inaugurated its sixth phase, Elena, which it calls the largest battery plant in the Americas: it has 3.5 GWh in service, is being expanded to 7 GWh and was built in just ten months. In September 2026 it completed the sale of Gabriela, the fourth phase (272 MW of solar and 1,100 MWh of storage), to CVC DIF at an enterprise value of $475 million.
In central Chile, Central Oasis is growing to 1.4 GW of solar and 5.1 GWh of storage; in Spain, the hybrid platform Iberian Oasis plans 1 GW of solar and 3.2 GWh, with projects such as Escuderos (200 MW of solar and 680 MWh). For Greenbox, Grenergy closed a €100 million financing for Oviedo, a 618 MWh stand-alone battery project now under construction and due to start operating in the first half of 2027. Greenbox has about 30 GWh in development across six markets.
In March 2026 Grenergy won capacity contracts for four UK storage projects totalling 760 MWh. In the United States it will sell the output of its Beaver Creek hybrid project (229 MW of solar and 183 MWh of batteries) to Georgia Power under a 20-year contract. In 2025 alone it built nearly 1 GW of solar and 7 GWh of storage.
Recent developments
In May 2026 Grenergy raised its planned investment to 2028 to €3.7 billion and presented GR Data, a digital infrastructure platform for data centres in Chile backed by its Oasis plants, including Atacama Data, which starts at 400 MW IT. In June it signed in Chile a PPA for 1 TWh a year over 15 years to supply power outside solar hours from Elena, its largest by volume.
In October 2026 it closed a $457 million non-recourse financing, its largest to date, for 446 MW of solar and 1.8 GWh of storage in Chile. Revenue in the first half of 2026 rose 51% to €661 million, and in September MSCI gave Grenergy its top ESG rating, AAA, for the fourth year in a row.
Working there
Grenergy looks for professionals with experience in engineering, project development, finance or construction, and runs programmes for students and recent graduates. Applications go through its job listings on LinkedIn. The benefits it highlights include flexibility, international mobility and continuous training. Besides its Madrid headquarters, it has an office in Santiago, Chile.