Rejobs

Renewable energy jobs at Ørsted

Fredericia, Denmark 5,000–10,000 employees Wind · Bioenergy orsted.com
Alert me to new jobs here
Ørsted
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
13 jobs · updated yesterday
The positions below have closed. Set up a job alert

Not seeing the right role? Join our talent pool

About Ørsted

Company overview

Ørsted A/S; the Danish State holds 50.1% (end of 2025)

Fredericia, Denmark

1973 (as DONG)

About 7,200 employees (November 2026); revenue of DKK 73.2 billion in 2025

What they do

Ørsted develops, builds and operates offshore wind farms with a core focus on Europe, drawing on more than 35 years of experience in offshore wind. It has 11.1 GW of installed offshore capacity and 7.2 GW under construction, and at the end of September 2026 its total installed renewable capacity stood at 19.5 GW. Besides offshore wind, Ørsted owns and operates onshore wind, solar power, energy storage and bioenergy plants and earns revenue from energy trading.

Its core markets are the UK, the Netherlands, Germany, Poland and Denmark. Outside Europe, Ørsted pursues select offshore wind projects in Taiwan, Korea and Australia, and in the US it runs a profitable onshore wind and solar business. In the UK, its 12 operating offshore wind farms supply about 7% of the country’s electricity.

Projects and track record

Ørsted was formed as DONG Energy in 2006 through a merger of the state-owned oil and gas company DONG and five other Danish energy companies. Its portfolio included Vindeby, the world’s first offshore wind farm, built in 1991 with 11 turbines. In 2024 Ørsted closed its last coal-fired power station, in Esbjerg, and in 2025 renewables made up 99% of its energy generation.

In Taiwan, Ørsted marked the completion of major construction works on the 920 MW Greater Changhua 2b and 4 offshore wind farms in September 2026. It is the company’s second gigawatt-scale project in Taiwan, after the 900 MW Greater Changhua 1 and 2a, which came into operation in 2024. In Poland, Ørsted and PGE are building Baltica 2, Poland’s largest offshore wind farm at 1.5 GW; the first foundations were installed by May 2026.

Recent developments

Rasmus Errboe has been Group President and CEO since 1 February 2025. In October 2025, Ørsted completed a rights issue that raised DKK 60 billion in gross proceeds. The same month, the company said it employed around 8,000 people and expected around 6,000 by the end of 2027.

In November 2025, Ørsted agreed to sell a 50% stake in the 2.9 GW Hornsea 3 offshore wind farm in the UK to Apollo-managed funds. In February 2026, it agreed to sell its entire European onshore business to Copenhagen Infrastructure Partners (CIP) for EUR 1.44 billion (DKK 10.7 billion), and the sale was completed in April 2026.

Borkum Riffgrund 3, at 913 MW, which Ørsted owns with Nuveen Infrastructure, entered commercial operation in August 2026 and is one of Germany’s largest operating offshore wind farms. In October 2026, the 704 MW Revolution Wind in the US reached commercial operation under its contracts with utilities in Connecticut and Rhode Island.

Working there

Ørsted groups its roles into 13 broad areas of work. In engineering and construction, the roles include structural, mechanical, geotechnical, cable and chemical engineers, as well as construction project managers, project planners and risk specialists.

In Denmark, staff get five weeks’ paid holiday a year plus public holidays, a 3% holiday supplement for full-time employees and a pension scheme with an 11% employer contribution. All new parents receive 18 or 12 weeks of paid parental leave, whatever their family set-up and wherever they live.

The Malaysian office, open since 2010, has grown from three software developers to around 800 colleagues. Ørsted’s three-year UK apprenticeship programme, in Grimsby and Barrow, trains apprentices to operate and maintain offshore wind turbines safely.

Last updated Nov 16, 2026 · Report an issue