Not seeing the right role? Join our talent pool
About Vestas
Company overview
Vestas Wind Systems A/S, listed on Nasdaq Copenhagen since 1998
Aarhus, Denmark
1945
About 39,500 employees (full-time equivalents, September 2026); revenue of EUR 18.8 billion in 2025
What they do
Vestas designs, manufactures, installs, develops and services wind energy and hybrid projects around the world. On land, it has more than 170 GW of installed capacity. At sea, it has installed more than 2,000 turbines, with more than 13 GW across 58 projects.
More than 12,000 Vestas service technicians maintain over 56,000 wind turbines in 70 countries. Its development business has a project pipeline of about 25 GW, with development activities in eight key markets.
Projects and track record
Vestas sold and installed its first wind turbine in 1979, with a 10-metre rotor and a capacity of 30 kW. After a crisis in 1986, it decided in 1987 to focus solely on wind energy, sold much of the group and formed Vestas Wind Systems A/S. Its first offshore project, Tunø Knob, is the world’s oldest commercial offshore wind farm, and its Vestas turbines are still running.
Recent developments
In mid-December 2025, Vestas reached 200 GW of wind turbines installed worldwide, with a 7.2 MW V172 turbine at ENOVA’s 65 MW Meppen repowering project in Germany. In September 2026, the 960 MW He Dreiht offshore wind farm in the German North Sea was inaugurated; it uses 64 Vestas V236 turbines of 15 MW, the first of which, installed in April 2025, was the model’s first offshore installation.
In 2025, an order intake of 16.3 GW lifted the combined order backlog to an all-time high of EUR 71.9 billion. In the second quarter of 2026, Vestas bought two blade factories, one in India and one in Mexico.
Working there
At Vestas sites, staff install or service the company’s wind turbine fleet, while its factories make blades, nacelles and tower segments. In Denmark, Vestas has blade factories in Nakskov and Lem and nacelle factories in Ringkøbing and Munkebo.
Its apprenticeship programmes train service technicians for onshore and offshore turbines on the job from day one. The Global Graduate Programme lasts two years and starts in September.