Rejobs

Renewable energy jobs at HSM Offshore Energy

Schiedam, Netherlands 101–250 employees Wind · Hydropower hsmoffshoreenergy.com
Alert me to new jobs here
HSM Offshore Energy
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
4 jobs · updated 45 days ago

Not seeing the right role? Join our talent pool

About HSM Offshore Energy

Company overview

Smulders HSM (HSM Offshore Energy BV), acquired in 2025 by Smulders, part of the Eiffage group

Schiedam, Netherlands

1914

revenue of nearly €300 million (2024)

What they do

Smulders HSM, formerly HSM Offshore Energy, is an integrated EPCIC contractor (engineering, procurement, construction, installation and commissioning) for multidisciplinary offshore projects. It builds high-voltage substations, green hydrogen platforms, gas production and processing modules, carbon capture and storage infrastructure and steel jacket foundations, and has delivered well over 150 projects in 60 years offshore.

99% of the projects in its order book are renewable energy projects, and the company aims for 80% of its offshore projects to centre on wind and green hydrogen by 2035. In offshore wind it reports 3.6 GW installed and 6.8 GW under construction, and with H2SEA it has developed a range of offshore green hydrogen platforms from 50 MW to over 400 MW.

The company traces its roots to HCW, founded in Leiden in 1914, and began offshore work in Schiedam in 1973. It traded as HSM Offshore Energy from 2009 and was bought by its management and Gilde Equity Management in 2021. In 2025 Smulders, a subsidiary of Eiffage Métal, acquired 100% of the company, which now operates as Smulders HSM under chief executive Jaco Lemmerzaal.

It builds at two Dutch yards: Schiedam, in the Rotterdam port area, with 75,000 m² of space, and Stormpolder in Krimpen aan den IJssel, leased from Hollandia in 2024.

Projects and track record

In 2002 it won what it calls the world’s first offshore renewables contract, the 160 MW Horns Rev A project in the Danish North Sea. For TenneT it built the 700 MW Borssele Alpha offshore high-voltage substation, completed in August 2020.

In July 2025 it delivered the THOR offshore substation for RWE from its Schiedam yard, with a topside of about 2,600 tonnes, for a wind farm planned at 1,060 MW, Denmark’s largest to date. For ONE-Dyas it built the N05-A gas platform, completed in July 2024, the first North Sea gas production platform to run entirely on offshore wind power.

With Smulders and Iv in the HSI joint venture, it is building four high-voltage AC substations for Elia on Princess Elisabeth Island off the Belgian coast, planned as the world’s first artificial energy island.

Recent developments

The HSI joint venture is also delivering three offshore substations for 50Hertz in the German Baltic Sea. Offshore installation of the 300 MW OSS Jasmund was completed in January 2026, and the topsides and jackets of OSS Zingst and OSS Darß, about 450 MW each, set sail in October 2026.

In April 2025 ScottishPower Renewables awarded it the EPCIC contract for the East Anglia TWO offshore substation and jacket, for a 960 MW wind farm off Suffolk. Construction began in March 2026, with the 5,100-tonne topside at the Stormpolder yard and the jacket at the company’s yard in Newcastle, UK.

Work on the Princess Elisabeth Island modules began with a first steel cut in Schiedam in June 2025. In August 2026 ONE-Dyas awarded it a new compression module for the N05-A platform.

Working there

The company works from its Schiedam site and the Stormpolder yard in Krimpen aan den IJssel. Staff quoted on its careers page include a welder, an apprentice and a project manager, and the company always welcomes unsolicited applications.

Last updated Nov 16, 2026 · Report an issue