Rejobs

Ingénieur Principal (H/F)

Rejoignez Scottish Power à Blantyre comme Ingénieur Principal pour diriger la conception de postes de transmission 33kV-400kV. Assurez la sécurité et l'innovation. Avantages : 36 jours de congés, doublement de la retraite et soutien à la mobilité verte.

Hybride Temps plein UTC+00:00 Mise à jour il y a 1 jour
Salaire
70 800–88 500 £ /an

Candidature sur iberdrola.wd3.myworkdayjobs.com

Vérifiez votre boîte de réception.

Sur mobile ? Vous pourrez postuler depuis un ordinateur plus tard.

At SP Energy Networks, we're building the electricity network of the future. Through technology, innovation and major investment in our transmission network, we're helping enable the transition to a cleaner, more sustainable energy system.

Our Strategic Projects team is at the heart of this transformation, delivering the critical infrastructure needed to support Scotland and the UK's future energy ambitions.

What you'll be doing

SP Energy Networks is recruiting a Principal Engineer to join the SP Transmission Strategic Projects team, leading the engineering design of transmission substations across our Strategic Projects portfolio.

You'll provide technical leadership and oversight of substation design and engineering outputs, working closely with EPC contractors, OEMs and internal engineering teams to ensure designs are safe, innovative, compliant and deliverable.

  • Lead the engineering design delivery of 33kV to 400kV transmission substations, establishing a consistent design strategy and approach across Strategic Projects.
  • Lead pre-contract technical design, including main plant, auxiliary systems, switchgear, transformers, reactive power equipment, specifications and feasibility layouts.
  • Act as the key technical interface with EPC contractors and OEM partners, ensuring high-quality and standardised design deliverables.
  • Provide technical leadership and support to Project Development and Project Delivery teams throughout the design, construction and operation of transmission substations.
  • Lead and support engineers undertaking technical assurance of EPC design submissions, ensuring alignment with SPT standards, policies and operational requirements.
  • Lead engineering reviews, governance, assurance and approval of design calculations, models, reports and regulatory submissions.
  • Engage with EPC contractors early in the design process to improve constructability and reduce delivery risk.
  • Manage engineering interfaces with Asset Management, Engineering Standards, Network Planning and other technical teams.
  • Collaborate with Principal Engineers, Section Heads and industry specialists to share expertise and resolve complex engineering challenges.
  • Lead technical innovation across Strategic Projects, including BIM, new engineering tools, systems and contractor-led solutions.
  • Represent SPT Strategic Projects on technical matters with senior industry, regulatory and external stakeholders.
  • Develop and champion advanced engineering solutions that support the accelerated delivery of Strategic Projects.

What you'll bring

  • Expert knowledge and proven experience in the design of 33kV to 400kV substations and associated plant.
  • Strong understanding of transmission network health, safety, technical and compliance requirements.
  • Proven experience delivering engineering outputs within a complex, fast-paced project environment.
  • Strong technical leadership skills, with experience managing or supporting engineering teams.
  • Experience working across internal teams, EPC contractors, OEMs and other external stakeholders.
  • Ability to make sound engineering decisions where information may be incomplete or requirements are evolving.
  • Strong communication, influencing and presentation skills, with the ability to use engineering analysis to support senior-level decisions.
  • A collaborative approach with the ability to drive technical improvement and transformational change.

As a minimum, you will demonstrate

  • Degree-level engineering qualification (BSc/BEng) and/or relevant postgraduate qualification (MEng/MSc) or equivalent relevant experience. Chartered Engineer status is preferred.
  • Experience working within an engineering/EPC environment, supporting multiple large-scale strategic projects.
  • Minimum 10 years' experience in electrical transmission substation design, including at least 5 years in a leadership role.
  • Demonstrable experience of transmission substation and plant engineering.
  • Excellent leadership, communication and stakeholder-management skills.

What's in it for you

As well as a competitive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.

At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action - our benefits are designed to help you do just that - so that you have everything you need to take care of your world - today and tomorrow. That's why our benefits include:

  • 36 days annual leave
  • Holiday purchase - perfect your work/life balance with extra annual leave
  • Share Incentive Plan and Sharesave Scheme
  • Payroll giving and charity matched funding
  • Technology Vouchers - save more and spread the cost of your technology purposes
  • Count us in - pledge to reduce carbon emissions and help fight climate change
  • Electric Vehicle Schemes - to help you transition to green/clean driving
  • Cycle to Work scheme and public transport season ticket loans
  • Options to purchase dental insurance, private medical insurance, health cash plan and annual health assessments
  • Life Assurance (4x salary)
  • Access to Savesmart financial wellbeing support
  • Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more

Why SP Energy Networks

SP Energy Networks is part of the Iberdrola Group, one of the world's largest integrated utility companies and a world leader in wind energy. We keep electricity flowing to homes and businesses through Central and Southern Scotland, North Wales and in the North West of England. We operate over 4000km of cables and lines that make-up the transmission network - connecting infrastructure like wind farms into the electricity system. It's a role that puts us right at the heart of Scotland's ambition to be Net Zero by 2044. And we're taking it very seriously. We're investing >£5.5 billion into our transmission network, directly supporting the rapid growth needed in renewable energy. With diverse opportunities across our businesses and a commitment to invest in our own internal talent, ScottishPower can offer people real career opportunities that meet personal and professional goals, in a global organisation.

Inclusion, diversity, and a social purpose are at the heart of everything we do. Together with our values, they bring us together into a stronger, more sustainable business with direct links to the communities we serve. It takes all kinds of people to build a large-scale business like ours, so whatever your background, you'll fit right in.

We are committed to providing reasonable support or adjustments in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related support. If you need support, please reach out to [email protected].

Mobility

Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.

Salaire et avantages

70 800–88 500 £ /an
+ Plus up to 20% annual bonus
Assurance santé Assurance vie Plan de retraite Congés payés Bien-être

À propos de ce poste

Publié
22 oct. 2026
Mise à jour
22 oct. 2026
Type d’emploi
Temps plein
Lieu de travail
Hybride
Horaires de travail
UTC+00:00
Expérience
10+ years

À propos de Scottish Power

Présentation de l'entreprise

Nom

ScottishPower Limited, une filiale entièrement détenue d'Iberdrola

Siège social

Glasgow, Écosse, Royaume-Uni

Fondée

1990

Taille

Environ 5 000 employés (source : linkedin.com). Les chiffres de revenus pour 2023 ne sont pas divulgués, mais Iberdrola a engagé 24 milliards de livres sterling dans des investissements au Royaume-Uni d'ici 2028, y compris à travers ScottishPower (source : energyadvicehub.org).

Ce qu'ils font

ScottishPower est une entreprise énergétique intégrée verticalement qui opère en tant qu'opérateur de réseau de distribution pour le centre et le sud de l'Écosse, Merseyside, le nord du Pays de Galles, et certaines parties du Cheshire et du Shropshire. L'entreprise fournit de l'électricité et du gaz aux foyers et aux entreprises à travers le Royaume-Uni et génère de l'énergie pour le réseau (source : wikipedia.org). Son axe technologique principal inclut l'énergie éolienne, l'énergie solaire, les mises à niveau du réseau, le stockage par batteries et l'hydrogène à faible émission de carbone, ayant transitionné vers la production de 100 % d'électricité verte en se séparant de ses actifs charbon et gaz (source : wikipedia.org). Les offres de produits de ScottishPower englobent la production renouvelable de 38 parcs éoliens terrestres et plus de 40 sites opérationnels produisant plus de 3 GW de capacité totale, ainsi que des services tels que des réseaux intelligents, la recharge de véhicules électriques, des pompes à chaleur et des solutions solaires pour les entreprises (source : scottishpower.co.uk). L'entreprise cible les clients résidentiels britanniques, les entreprises commerciales et le commerce de gros d'énergie, tirant parti de sa position en tant que partie d'Iberdrola, un leader mondial de l'énergie éolienne (source : energybrokers.co.uk).

Projets et antécédents

ScottishPower a réalisé plusieurs projets notables, y compris le parc éolien terrestre de Whitelee, qui est le plus grand d'Europe avec 539 MW, comprenant 215 turbines et une batterie de 50 MW (source : wikipedia.org). L'entreprise a également modernisé le premier parc éolien commercial d'Écosse, Hagshaw Hill, qui a été remis en ligne en novembre 2025 pour augmenter la production et les avantages pour la communauté (source : scottishpowerrenewables.com). Les projets majeurs en cours incluent les parcs éoliens offshore East Anglia ONE et East Anglia THREE, ainsi que le projet offshore Wikinger dans la mer Baltique allemande (source : cisco.com). ScottishPower Renewables gère le portefeuille britannique d'Iberdrola, qui dépasse 2 000 MW provenant de 40 parcs éoliens, avec des projets d'expansion supplémentaires en solaire et en hydrogène (source : windenergyireland.com).

Développements récents

Ces dernières années, ScottishPower a sécurisé 1,35 milliard de livres sterling pour sept mises à niveau de réseau, y compris des câbles sous-marins et des sous-stations, afin d'améliorer le transport de l'énergie éolienne écossaise vers le sud (source : energyadvicehub.org). Iberdrola a annoncé un investissement significatif de 24 milliards de livres sterling au Royaume-Uni d'ici 2028, axé sur les énergies renouvelables et la résilience du réseau (source : energyadvicehub.org). De plus, ScottishPower Renewables prévoit d'investir près de 3 milliards de livres sterling dans des projets éoliens et solaires offshore et terrestres de 2023 à 2025 (source : cisco.com). Dans le secteur de l'hydrogène, Iberdrola a lancé une unité en septembre 2023, visant 600 MW d'ici 2025 et 5 GW d'ici 2030, avec le projet Green Hydrogen for Scotland de ScottishPower comprenant un électrolyseur de 10 MW (source : energybrokers.co.uk).

Travailler là-bas

ScottishPower propose une variété de postes dans le développement et les opérations des énergies renouvelables, les réseaux énergétiques, la génération, et des fonctions de soutien telles que la gestion de l'énergie et l'informatique/sécurité (source : scottishpowerrenewables.com). L'entreprise recrute principalement à son siège de Glasgow, avec des opérations liées à des parcs éoliens à l'échelle du Royaume-Uni et des sites offshore en East Anglia et dans la mer du Nord méridionale (source : windenergyireland.com). La culture d'entreprise met l'accent sur l'innovation dans les énergies renouvelables et l'engagement communautaire, comme en témoignent des initiatives telles que la phase de retour d'information MachairWind et des partenariats avec des organisations locales (source : scottishpower.co.uk). Bien que les avantages spécifiques ne soient pas détaillés, l'entreprise investit massivement dans des initiatives écologiques et soutient les transitions vers le zéro net pilotées par les employés pour les clients commerciaux (source : scottishpower.com).

Vos connexions LinkedIn

Consultez vos contacts chez Scottish Power sur LinkedIn et mobilisez votre réseau au moment de postuler.

Voir les connexions

Plus d’offres similaires en éolien

Ingénieur Principal (H/F)
Scottish Power · 70 800–88 500 £/an