Popis pracovní pozice
At Canadian Solar, our vision is to make lives better by bringing electricity powered by the sun to millions of people worldwide. As a leading manufacturer of solar panels, inverters, and energy storage solutions, we've been an industry front-runner since our founding in 2001. Our commitment to sustainability is reflected in all parts of our organization as we navigate the complexities of a booming industry.
Throughout Canadian Solar's subsidiaries, e-Storage, Recurrent Energy, MSS and CSI Solar Co., we invest in our employees' growth. Our training programs and promotional opportunities ensure we all can continue to learn. We understand the importance of work-life balance and provide various flexible work options to support our employees' well-being. Join our team to "Make the Difference" by creating a lasting positive impact on the world and the communities where we operate.
Purpose
Acts as the regional senior technical specialist for power systems and product commissioning across the UK BESS fleet. Leads product commissioning of e-STORAGE products (SolBank, string inverters, MVSkids etc) to OEM standard, leads HV/MV maintenance and safety activities across e-STORAGE and third-party fleets (i.e. SMA, Power Electronics) and develops the competency of the wider service team to support HV/MV works.
Scope Definition: Product Commissioning
This role leads product commissioning of e-STORAGE products: commissioning of e-STORAGE power conversion and MV equipment to OEM standard, including first power-on initialization parameters, product-level testing, and return-to-service. The site Commissioning (Cx) team retains overall site and project commissioning ownership, including the energisation programme, grid compliance and G99 testing, punch lists, and client handover. The Power Systems Technician works within the site Cx team's sequence: the Cx team owns the programme and the date; Power Systems owns the product Cx, safety documents, and product-level sign-off within it.
MV/HV Authorisation & Control of Work
Control of work and HV authorisation are determined by contract and project phase:
- During commissioning, the EPC (or Principal Contractor) is responsible for site control of work and HV authorisation. This role operates within the EPC's safe system of work and provides product-level expertise.
- During LTSA operations, the HV authorisation and control-of-work model is defined in each contract and varies by site (client-appointed, third-party, or CSE-held). This role provides the trained, competent personnel for appointment where CSE holds or is delegated that responsibility.
- Where a third party holds HV authorisation for a site, this role coordinates, supervises interfaces, and delivers the product-level technical work within their control regime.
Key Responsibilities
Product Commissioning (e-STORAGE products)
- Lead product commissioning of e-STORAGE products across UK LTSA sites (SolBank, string inverters, MVSkids and associated MV plant) to OEM standard and project scope.
- Own and set first power-on initialization parameters (OEM-trained personnel requirement per product manuals); incorrect settings risk equipment damage and certification non-compliance.
- Own product commissioning standards, procedures, test records, and documentation packs; ensure consistency across all UK projects.
- Provide product-level technical support to the site Cx team during energisation.
- Support the site Cx team during SAT and witness testing; provide product-level technical sign-off.
HV/MV Operations & Safety
- Competent for appointment to carry out MV/HV isolations, earthing, and safety document duties under the prevailing site safe system of work, as a mandatory precursor to intrusive PM/CM works. Site HV authorisation arrangements are defined per contract and phase (see MV/HV Authorisation & Control of Work).
- Carry out operational HV/MV switching during the service phase, including switching for planned PM outages, CM interventions, and restoration on return to service, where CSE holds control of work under the contract.
- Provide HV/MV support to the service team during PM and CM activities: isolations, earthing, switching, and safe access where service team work interfaces with HV/MV plant.
- Lead HV/MV preventative maintenance across CSE, SMA and Power Electronics MV skids, RMUs, transformers, and protection systems per OEM schedules.
- Lead corrective maintenance and fault investigation on HV/MV equipment: root cause analysis, rectification and return to service.
- Provide safety leadership and oversight for all HV/MV activities in region, including supervision of third-party HV contractors where used.
Technical Expertise & Capability Building
- Subject-matter expert across all inverter platforms (CSE string inverters, SMA, Power Electronics) for HV/MV maintenance activities; product commissioning expertise applies to e-STORAGE products.
- Assess and develop service team competency for HV/MV support roles; deliver toolbox talks, training, and authorisation recommendations.
- Feed field learnings back into standards, RAMS/SOPs, and OEM escalations.
Requirements
- Trained and competent for MV/HV activities to 33kV; capable of appointment under company or client operational rules as contracts require.
- Time-served electrical background with utility-scale BESS or solar commissioning experience.
- Working knowledge of MV switchgear, transformers, and protection systems.
- Familiarity with G99 requirements sufficient to support the site Cx team during compliance testing.
- Full UK driving licence; regional and occasional national travel.
Obvyklá mzda u podobných pozic
OdhadProstřední polovina mezd inzerovaných na Rejobs v této skupině za posledních 24 měsíců. Zaměstnavatel mzdu neuvedl.
O této pozici
O společnosti Canadian Solar
Přehled společnosti
Canadian Solar Inc., od roku 2006 kótovaná na burze Nasdaq
Kitchener, Kanada
2001
Zhruba 12 600 zaměstnanců na plný úvazek (konec roku 2025); čisté tržby 5,6 mld. USD v roce 2025
Čím se zabývá
Canadian Solar vyrábí fotovoltaické moduly, dodává řešení pro solární energii a bateriová úložiště a vyvíjí velké solární a bateriové projekty. V segmentu Manufacturing působí CS PowerTech, která vyrábí a prodává solární a bateriové produkty pro americký trh, a CSI Solar, která obsluhuje všechny ostatní trhy. Segment Recurrent Energy vyvíjí a prodává solární a bateriové projekty, zajišťuje jejich provoz a vydělává na prodeji elektřiny ze svého portfolia provozovaných zdrojů. Canadian Solar vlastní zhruba 64 % společnosti CSI Solar, své hlavní provozní dceřiné společnosti v Číně.
Za 25 let Canadian Solar dodala téměř 180 GW solárních modulů po celém světě. Její divize úložišť e-STORAGE do 30. června 2026 dodala přes 23 GWh bateriových úložišť a měla nasmlouvané zakázky za 3,5 mld. USD. Na konci roku 2025 spravovala Recurrent Energy zhruba 15 GW solárních a bateriových projektů na základě smluv o provozu a údržbě.
Projekty a reference
Od vstupu do vývoje projektů v roce 2010 Canadian Solar vyvinula, postavila a připojila k síti zhruba 12,4 GWp solárních projektů a 6,4 GWh bateriových úložišť. K 30. červnu 2026 měla ve vývoji zhruba 22 GWp solárních a 84 GWh bateriových projektů.
V Kalifornii je Crimson Energy Storage Project o výkonu 350 MW / 1 400 MWh v okrese Riverside v provozu od roku 2022 na základě dvou smluv s místními energetickými společnostmi. V Arizoně je projekt Papago Storage o výkonu 300 MW / 1 200 MWh nedaleko města Tonopah v komerčním provozu od roku 2025 na základě 20leté smlouvy typu tolling.
Ve Španělsku zahájila solární elektrárna Villameca o výkonu 200 MWp v Kastilii a Leónu komerční provoz v říjnu 2026 a doplnila nedávno otevřený Rey Solar Project o výkonu 426 MWp v Andalusii. V Austrálii zahájil Carwarp Energy Park o výkonu 150 MWac nedaleko města Mildura ve státě Victoria komerční provoz v srpnu 2026 na základě dlouhodobé smlouvy o odběru elektřiny se společností Microsoft.
Novinky
Dne 15. ledna 2025 Canadian Solar otevřela nové globální sídlo ve městě Kitchener v Ontariu. Dne 1. prosince 2025 oznámila, že znovu převezme přímý dohled nad svými americkými aktivitami, a to prostřednictvím 75,1% podílu ve společnosti CS PowerTech, novém společném podniku s CSI Solar. Dne 14. května 2026 se generálním ředitelem stal Colin Parkin a zakladatel Shawn Qu přešel z funkce předsedy představenstva a generálního ředitele do role výkonného předsedy a technologického ředitele.
V červenci 2026 otevřela Canadian Solar první fázi továrny na solární články HJT v Jeffersonville v Indianě s nominální kapacitou 2,1 GWp; jde o první továrnu na články HJT komerčního rozsahu v USA. Továrna na moduly o kapacitě 5 GWp v Mesquite v Texasu se rozšiřuje na 10 GWp a dokončena má být ve druhém pololetí 2026. Ve druhém čtvrtletí 2026 klesly dodávky modulů meziročně o 60 % na 3,1 GW, zatímco dodávky bateriových úložišť vzrostly o 73 % na 3,7 GWh.
V srpnu 2026 Recurrent Energy získala 695 mil. USD v projektovém financování a tax equity pro projekt Cobalt Solar o výkonu 330 MW v okrese Riverside v Kalifornii. V říjnu 2026 prodala dva projekty bateriových úložišť ve Francii, Baixas a Coquainvilliers, každý o výkonu 100 MW / 400 MWh, společnosti BW ESS.
Práce ve firmě
Počet zaměstnanců Canadian Solar na plný úvazek klesl z 22 234 na konci roku 2023 na 12 587 na konci roku 2025. V té době pracovalo 2 061 zaměstnanců v USA, 9 187 v asijsko-pacifickém regionu včetně Číny a 1 339 v Evropě a dalších regionech. V kanceláři v Kitcheneru sídlí centrála skupiny, e-STORAGE a obchodní jednotky pro prodej modulů a servis.
V Evropě má Recurrent Energy kanceláře v Miláně, Madridu, Amsterdamu, Varšavě a Londýně. V USA dorovnává Canadian Solar v penzijním plánu 401(k) 100 % prvních 5 % příspěvků zaměstnanců a zaměstnanci na všech úrovních se mohou zapojit do firemních kurzů a vzdělávacích programů, od prezenční výuky a e-learningu po koučink a mentoring.