Popis pracovní pozice
Do you want to work for a leading integrated solution EPCIC contractor of multi-disciplinary challenging offshore projects, creating a sustainable energy future in the offshore energy mix?
Are you technically minded and interested in turning engineering into practical solutions for production? Whether you already have several years of experience or are at the start of your career, we would like to hear from you. At Smulders HSM, you work at the heart of complex steel construction projects, coordinating between engineering, production, suppliers and subcontractors.
As Production Work Planner - Steel Construction at Smulders HSM, you play an important role in preparing our projects for safe, efficient and high-quality execution in the workshop. From the initial production preparations through to completion, you are closely involved in the entire production process.
We are currently looking for two Production Work Planners and are open to candidates at both junior and senior level.
What will you do?
You translate engineering documentation into a practical and manufacturable production approach and ensure that all necessary preparations are in place before work starts in the workshop.
Depending on your experience and level of seniority, your responsibilities include:
- Translating engineering documentation into a practical production approach;
- Preparing Material Take Offs (MTOs) and supporting material procurement;
- Coordinating workshop drawings and preparing as-built documentation;
- Preparing work instructions and technical documentation;
- Coordinating construction methods, schedules, workshop layouts and scaffolding plans with Production;
- Preparing and coordinating lifting, turning and transport plans;
- Monitoring progress, budgets, deviations and additional or reduced work;
- Preparing and discussing technical queries with clients and suppliers;
- Coordinating and supervising outsourced work and subcontractors;
- Working closely with Quality Control to ensure compliance with quality requirements and preservation specifications;
- Depending on your experience, supporting and guiding junior work planners, interns and temporary employees.
Who are we looking for?
You are technically minded, well organised and able to maintain an overview in a dynamic project environment. You communicate easily with different disciplines and stakeholders and take a proactive approach to solving technical and organisational challenges.
You also bring:
- A completed technical education at MBO or HBO level, preferably in Mechanical Engineering, Civil Engineering, Construction Engineering or a comparable technical field;
- An interest in steel construction, offshore fabrication or heavy construction;
- Knowledge of fabrication processes, construction drawings and materials, or the motivation to develop this knowledge;
- A structured, proactive and solution-oriented way of working;
- Good communication skills in both Dutch and English.
For a junior position, relevant internships, technical production experience or experience in a project environment are an advantage.
For a more senior position, we are looking for several years of relevant experience in work preparation within steel construction, offshore, heavy fabrication or a comparable technical environment, including experience with project progress and budget control.
What Smulders HSM offers
- A challenging role within a leading company in the offshore substation sector.
- A pleasant working environment with skilled and experienced colleagues.
- The opportunity to contribute to large-scale, sustainable offshore wind projects.
- A competitive salary and attractive benefits package in accordance with the Metalektro Collective Labour Agreement, including a 60% employer pension contribution.
- 27 vacation days and 13 additional days off.
- Development budget available for job-related training.
Your application
Are you the Production Work Planner who will strengthen our team? Whether you are starting your career or already bring considerable experience, we would like to get to know you.
We are interested in your CV, but also in your ambitions, personality, and motivation. Please include a short cover letter explaining why you would be a good fit for this role.
Apply directly on this page. We look forward to your application and hope to welcome you soon!
Unsolicited services or offers from recruitment agencies or intermediaries will not be responded to.
Plat a benefity
Obvyklá mzda u podobných pozic
OdhadProstřední polovina mezd inzerovaných na Rejobs v této skupině za posledních 24 měsíců. Zaměstnavatel mzdu neuvedl.
O této pozici
O společnosti HSM Offshore Energy
Přehled společnosti
Smulders HSM (HSM Offshore Energy BV), od roku 2025 součást firmy Smulders ze skupiny Eiffage
Schiedam, Nizozemsko
1914
Čím se zabývá
Smulders HSM, dříve HSM Offshore Energy, je integrovaným dodavatelem EPCIC (projekce, nákup, výstavba, instalace a uvedení do provozu) pro multioborové offshore projekty. Staví vysokonapěťové rozvodny, platformy pro zelený vodík, moduly pro těžbu a úpravu plynu, infrastrukturu pro zachytávání a ukládání uhlíku a ocelové příhradové základy (jackety); za 60 let na moři dodala přes 150 projektů.
99 % projektů v portfoliu zakázek firmy tvoří obnovitelná energie a do roku 2035 chce, aby se 80 % jejích offshore projektů týkalo větru a zeleného vodíku. V offshore větrné energetice uvádí 3,6 GW instalovaného a 6,8 GW rozestavěného výkonu a se společností H2SEA vyvinula řadu offshore platforem na zelený vodík od 50 MW do více než 400 MW.
Firma navazuje na společnost HCW, založenou v Leidenu v roce 1914, a offshore činnost zahájila ve Schiedamu v roce 1973. Od roku 2009 nesla jméno HSM Offshore Energy a v roce 2021 ji koupil management spolu s Gilde Equity Management. V roce 2025 získala 100 % firmy společnost Smulders, dceřiná firma Eiffage Métal; dnes působí jako Smulders HSM a jejím generálním ředitelem je Jaco Lemmerzaal.
Vyrábí ve dvou nizozemských areálech: ve Schiedamu v rotterdamském přístavu na ploše 75 000 m² a v areálu Stormpolder v Krimpen aan den IJssel, který si v roce 2024 pronajala od firmy Hollandia.
Projekty a reference
V roce 2002 získala podle svých slov vůbec první zakázku na offshore obnovitelné zdroje na světě, projekt Horns Rev A o výkonu 160 MW v dánské části Severního moře. Pro TenneT postavila offshore vysokonapěťovou rozvodnu Borssele Alpha o výkonu 700 MW, dokončenou v srpnu 2020.
V červenci 2025 dodala offshore rozvodnu THOR pro RWE ze svého areálu ve Schiedamu; její horní část (topside) váží asi 2 600 tun a slouží větrné farmě plánované na 1 060 MW, dosud největší v Dánsku. Pro ONE-Dyas postavila plynovou platformu N05-A, dokončenou v červenci 2024, první plynovou těžební platformu v Severním moři napájenou výhradně z offshore větru.
Ve společném podniku HSI s firmami Smulders a Iv staví čtyři vysokonapěťové rozvodny AC pro Elia na ostrově Princess Elisabeth u belgického pobřeží, který má být prvním umělým energetickým ostrovem na světě.
Novinky
Společný podnik HSI dodává také tři offshore rozvodny pro 50Hertz v německé části Baltského moře. Instalace rozvodny OSS Jasmund o výkonu 300 MW na moři skončila v lednu 2026 a topsidy a jackety rozvoden OSS Zingst a OSS Darß, každá zhruba o výkonu 450 MW, vypluly v říjnu 2026.
V dubnu 2025 jí ScottishPower Renewables zadala zakázku EPCIC na offshore rozvodnu a jacket pro East Anglia TWO, větrnou farmu o výkonu 960 MW u pobřeží Suffolku. Stavba začala v březnu 2026: topside o hmotnosti 5 100 tun vzniká v areálu Stormpolder a jacket v areálu firmy v Newcastlu ve Spojeném království.
Práce na modulech pro ostrov Princess Elisabeth začaly prvním řezem oceli ve Schiedamu v červnu 2025. V srpnu 2026 jí ONE-Dyas zadala nový kompresní modul pro platformu N05-A.
Práce ve firmě
Firma působí ve Schiedamu a v areálu Stormpolder v Krimpen aan den IJssel. Mezi zaměstnanci, kteří vyprávějí o své práci na jejích kariérních stránkách, jsou svářeč, učeň a projektový manažer; firma vždy uvítá i nevyžádané žádosti o práci.