Popis pracovní pozice
Job Information
- Job Type Full time
- Industry Rooftop Solar
- Work Experience 10+ years
- Salary CTC 20,00,000 Lacs Annually
- City Faridabad
- State/Province Haryana
- Country India
- Zip/Postal Code 121001
Job Description
1. Key Mission
Build an engineering organization capable of developing Loom-owned hybrid inverter and BESS products that are:
- Safe
- Reliable
- Cost competitive
- Highly efficient
- Easy to install and service
- IoT/cloud connected
- Scalable from residential to C&I applications
- Designed for Indian grid and operating conditions
- Ready for domestic and international markets
Primary objective: Build Loom's core power-electronics IP rather than remaining dependent on OEM products.
2. Key Responsibilities
A. Product Architecture
Own architecture for:
- Hybrid inverter
- On-grid inverter
- Off-grid inverter
- Battery inverter
- PCS
- Residential BESS
- C&I BESS
- Battery packs
- BMS
- EMS
- Energy gateway
- Monitoring platform
Define:
PV → Inverter → Battery → Grid → Load → EV
system architecture.
B. Hybrid Inverter Development
Lead development of:
- 3 kW
- 5 kW
- 6 kW
- 8 kW
- 10 kW
- 15 kW+
- Three-phase hybrid inverter platforms
Key engineering areas:
- MPPT
- DC/DC
- DC/AC conversion
- Power semiconductor selection
- MOSFET/IGBT/SiC architecture
- Magnetics
- Gate drivers
- Protection circuits
- Grid synchronization
- Anti-islanding
- Power-factor control
- Harmonic reduction
- Thermal management
- Surge protection
- Firmware/control algorithms
3. BESS Engineering
Develop scalable BESS platforms from residential to commercial applications.
Responsibilities include:
- Battery pack architecture
- Rack design
- BMS
- Cell selection
- Battery balancing
- SOC/SOH algorithms
- Thermal management
- DC protection
- Contactors
- Fuses
- Pre-charge circuits
- PCS
- EMS
- Fire protection
- HVAC integration
- Containerized BESS architecture
- Battery monitoring
- Remote diagnostics
Experience with LFP chemistry and large-format battery systems is highly desirable.
4. BMS & EMS Development
Build or manage development of an intelligent BMS capable of:
- Cell monitoring
- Cell balancing
- Over-voltage protection
- Under-voltage protection
- Over-current protection
- Short-circuit protection
- Temperature protection
- SOC calculation
- SOH calculation
- Fault detection
- Event logging
- Remote diagnostics
Develop EMS capabilities for:
- Solar self-consumption
- Peak shaving
- Time-of-use optimization
- Backup power
- Grid charging
- Solar charging
- Battery scheduling
- Demand management
- DG optimization
- Dynamic energy management
5. Software & Connectivity
The inverter/BESS should become a connected energy platform, not merely hardware.
Lead integration of:
- Embedded firmware
- DSP
- MCU
- CAN
- RS485
- Modbus
- Wi-Fi
- 4G
- Bluetooth
- OTA firmware updates
- Cloud monitoring
- Mobile application
- Remote diagnostics
- API integration
Target architecture:
Device → Gateway → Cloud → App → Analytics → AI
6. Product Development Process
Own the complete NPD process:
Market requirement → Product specification → Architecture → Simulation → Prototype → EVT → DVT → PVT → Certification → Mass production → Field validation
Establish engineering gates for:
- Design review
- BOM review
- Reliability review
- Safety review
- Software validation
- Hardware validation
- Production validation
- Field testing
7. Testing & Reliability
Build an internal validation laboratory covering:
Electrical
- Efficiency
- MPPT performance
- Power factor
- THD
- Load testing
- Grid simulation
- Battery cycling
Environmental
- High temperature
- Low temperature
- Humidity
- Dust
- Water ingress
- Vibration
- Shock
- Altitude
Safety
- Short circuit
- Over-voltage
- Over-current
- Thermal runaway
- Insulation
- Ground fault
- Surge
- Lightning protection
The engineering head will be accountable for field failure rate and product reliability.
8. Certification & Compliance
Lead product certification and compliance for relevant Indian and international standards, including applicable:
- BIS
- IEC
- IS standards
- EMC
- Grid-connectivity requirements
- Battery safety requirements
- Transportation requirements
- Fire-safety requirements
Experience with certification laboratories and regulatory authorities is strongly preferred.
9. Manufacturing Transfer
Work closely with:
- Manufacturing
- Quality
- Supply Chain
- Procurement
- NPD
- Service
to achieve:
Design → Prototype → Pilot → Mass Production
Responsibilities include:
- DFM/DFA
- BOM optimization
- Component localization
- Test fixtures
- End-of-line testing
- Production calibration
- Yield improvement
- Cost reduction
10. Cost Engineering
The leader must build products that can compete with Chinese and Indian manufacturers.
Own:
Target Cost → Design Cost → BOM Cost → Manufacturing Cost → Gross Margin
Focus on:
- Component localization
- BOM reduction
- Design simplification
- Common platforms
- Supplier development
- Power density
- Manufacturing yield
11. Engineering Team to Build
The Head of Engineering should build the following organization:
Team
Initial Strength
Head - Power Electronics
1
Power Electronics Engineers
4-6
Embedded/Firmware Engineers
4-6
BMS Engineers
3-4
EMS/Software Engineers
3-4
Hardware Engineers
3-5
Mechanical/Thermal Engineers
2-3
Battery Pack Engineers
2-3
System Engineers
2-3
Testing & Validation
5-7
Certification/Compliance
2
Reliability Engineers
2
NPD/Project Managers
2-3
Initial team
~35-50
The organization can subsequently scale to 75-100+ engineers as Loom develops multiple product platforms.
12. First 12-Month Deliverables
The leader should be evaluated against concrete product milestones.
0-90 Days
- Build engineering organization
- Finalize product roadmap
- Select technology architecture
- Identify OEM/technology partners where required
- Establish laboratory requirements
- Freeze first-product specifications
- Create engineering SOP/NPD process
3-6 Months
- Working hybrid inverter prototype
- Battery pack prototype
- BMS prototype
- EMS prototype
- Cloud monitoring prototype
- Initial laboratory validation
6-9 Months
- Engineering validation
- Field trials
- Certification
- Manufacturing prototype
- Reliability testing
9-12 Months
Mass-production-ready Loom hybrid inverter + BESS platform
with:
- Certification
- Production BOM
- Manufacturing test system
- Service manual
- Installation SOP
- Warranty framework
- Remote monitoring
- Field-service architecture
13. Key KPIs
The Head of Engineering will be measured on:
KPI
Target
Product development cycle
≤ 9-12 months
Prototype success rate
>90%
First-pass certification
>90%
Product efficiency
Industry competitive
Field failure rate
<1%
Engineering change after launch
<5%
BOM cost reduction
10-20% annually
Localization
>70% initially, increasing
On-time NPD
>90%
Warranty cost
<1-2% of sales
Product gross margin
Company target
New products launched
3-5/year
14. Candidate Profile
Must Have
- 12+ years in power electronics
- Strong inverter experience
- Hybrid inverter/PCS experience
- BESS experience
- BMS understanding
- Embedded systems experience
- Product development experience
- Manufacturing-transfer experience
- Certification experience
- Team-building experience
Preferred
Experience with companies/products involving:
- Solar inverter
- Hybrid inverter
- PCS
- BESS
- Lithium battery
- EV power electronics
- Energy storage
- EMS
- Microgrid
Experience working with Indian and Chinese engineering/manufacturing ecosystems would be a major advantage.
15. Leadership Expectations
This is not a conventional R&D manager role.
The person must be able to:
Think like a CTO + engineer + product manager + manufacturing leader.
They must be comfortable moving between:
Customer → Product → Circuit → Firmware → Prototype → Factory → Certification → Field
and personally solve critical engineering problems.
Requirements
Look for senior engineers/leaders from companies involved in:
- Solar inverters
- BESS
- Power electronics
- EV chargers
- UPS
- Industrial drives
- Energy storage
- EV powertrain
Potential talent pools include organizations such as Sungrow, Huawei Digital Power, Delta Electronics, Schneider Electric, ABB, Siemens, Luminous, Su-Kam, Exide Energy, Amara Raja, Waaree, Enphase, Growatt and GoodWe, among others.
Benefits
Work Timing : 10:00 am to 7:00 pm (Monday to Saturday)
Education : MBA/Computer Science
Address : Loom Solar Pvt Ltd (14/4 Mathura Road, Faridabad 121003)
Contact : Muskan Singh
Gender : Male / Female
Job Type : Full Time
Job Location : Faridabad
Plat a benefity
O této pozici
O společnosti Loom Solar
Přehled společnosti
Loom Solar Pvt. Ltd.
Faridabad, Indie
2018
Přes 300 zaměstnanců (2026); roční obrat přes 10 mld. INR, oznámený v červnu 2026
Čím se zabývá
Loom Solar vyrábí v Indii solární moduly SHARK bifacial, TOPCon a HJT, bateriová úložiště CAML a hybridní střídače FUSION. Jeho solární moduly mají výkon až 750 W, figurují na seznamu Approved List of Models and Manufacturers (ALMM) a schválil je Bureau of Indian Standards; firma dále vyrábí síťové a hybridní střídače od 3 kW do 50 kW a lithiová bateriová úložiště od 1 kWh do 5 MWh. Kromě výrobků nabízí instalaci, obhlídky místa inženýrem a pomoc s financováním a splátkami (EMI).
Prodává přes více než 15 000 obchodních partnerů a 500 distributorů a vyváží do 11 zemí. Firma začínala v Biháru a Uttarpradéši, odkud dodnes pochází zhruba 50 % jejího obchodu. Má dvě kanceláře, dva výrobní závody a šest skladů.
Projekty a reference
Loom Solar založili v roce 2018 bratři Amol Anand a Amod Anand. Zpočátku prodával výhradně online, přes e-commerce platformy jako Amazon, a výrobu zadával externím firmám, než si po vybudování zákaznické základny postavil vlastní závod.
Do června 2026 obsloužil více než 100 000 zákazníků. V březnu 2026 oznámil, že se registroval jako schválený dodavatel ve všech státech na národním portálu programu PM Surya Ghar: Muft Bijli Yojana, přes který indická vláda umožňuje majitelům domů pořídit střešní fotovoltaiku s nárokem na dotaci. V říjnu 2025 oznámil uvedení do provozu velkých solárních elektráren o výkonu 17,9 MW: 8 MW v Tamilnádu, 5,3 MW v Madhjapradéši, 1,1 MW v Uttarákhandu a 3,5 MW v Rádžasthánu.
Novinky
Na veletrhu Renewable Energy India (REI) 2025 představil Loom Solar moduly TOPCon a HJT s výkonem až 730 W. Jeho továrna na moduly s kapacitou 1,2 GW vzniká na pozemku o rozloze 7,5 akru v Kosi v Uttarpradéši a do provozu má jít ve fiskálním roce končícím v březnu 2027. V dubnu 2026 mu vláda Uttarpradéše přidělila další pozemek o rozloze 33 400 metrů čtverečních (zhruba 8,25 akru) v areálu Industrial Model Land Corporation (IMLC) v Meerutu, určený k výrobě solárních modulů.
V červnu 2026 mířil do konce roku 2026 na výrobní kapacitu 1,2 GW u modulů a 1 GW u střídačů. V listopadu 2025 připravoval vstup na burzu (IPO) v objemu zhruba 10 mld. INR, a to do fiskálního roku končícího v březnu 2027.
Práce ve firmě
Šest regionálních skladů Loom Solar stojí ve městech Mumbai, Chennai, Kolkata, Lucknow a Faridabad, kde jsou dva z nich. V březnu 2026 firma uvedla, že ženy tvoří téměř 20 až 25 % jejích zaměstnanců.
Kariérní web nabízí místa oblastních obchodních manažerů (Area Sales Manager), kteří ve svém regionu získávají nové B2B zakázky a přivádějí prodejce, distributory, EPC firmy a instalatéry, a servisních techniků v terénu (Field Service Engineer), kteří solární systémy instalují, uvádějí do provozu a odstraňují na nich závady. Firma také hledá vedoucího inženýrství (Head of Engineering), který má vybudovat vývojový tým pro vlastní hybridní střídače a bateriová úložiště (BESS).