Rejobs

Renewable energy jobs at Van Oord

Rotterdam, Netherlands 5,000–10,000 employees Wind · Hydropower vanoord.com
Alert me to new jobs here
Van Oord
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
3 jobs · updated 70 days ago

Not seeing the right role? Join our talent pool

About Van Oord

Company overview

Van Oord N.V., a Dutch family-owned company

Rotterdam, Netherlands

1868

about 6,300 employees (2025); revenue of EUR 2.6 billion in 2025

What they do

Van Oord is a marine contractor with a wide international presence in dredging, offshore, offshore wind and marine contracting. In 2025 it worked on 213 projects in 36 countries and protected 89 kilometres of coastline. Its Offshore Energy business recorded EUR 1,471 million in revenue that year, and Dredging & Infra EUR 1,119 million.

In offshore wind, Van Oord focuses on Balance of Plant contracts and transport and installation, and also provides scour protection and inter-array cable installation. In 2025 it contributed to projects with a combined 3,283 MW of installed renewable capacity.

Through subsea rock installation, placing rock on the seabed, Van Oord protects and stabilises offshore energy infrastructure. It builds on more than 50 years of operational experience and the industry's most extensive dedicated flexible fallpipe fleet. In 2025 Van Oord made Ocean Health a separate business line, which seeks to restore marine ecosystems on a large scale through commercially viable business models.

Projects and track record

At the 1.4 GW Sofia Offshore Wind Farm on Dogger Bank, Van Oord held the EPCI scope for the foundations and array cables; in September 2025 it completed the laying, burial, termination and testing of 109 cables. On its first assignment, completed in November 2025, the installation vessel Boreas installed 45 monopiles at Nordseecluster A in the German North Sea. Van Oord is installing 105 monopiles for that wind farm in total, with the remaining 60 due at Nordseecluster B, scheduled for 2027.

In December 2025 Van Oord completed the transport and installation of all 21 monopiles at Iberdrola's Windanker offshore wind farm. In Poland it was responsible for the transport and installation of all 78 monopile foundations and 76 transition pieces at Baltic Power, the country's first offshore wind farm, with a planned capacity of up to 1.2 GW. In August 2026 Van Oord completed the installation of all 111 monopiles for Baltica 2, a 1.5 GW wind farm jointly developed by PGE and Ørsted.

Recent developments

On 30 October 2026 the last of the 52 turbines was installed at the Ecowende wind farm, about 53 kilometres off IJmuiden in the Hollandse Kust (west) zone. Van Oord transports the turbines from Eemshaven with Boreas and earlier installed the foundations and inter-array cables of the wind farm, which will have a capacity of about 760 MW. At the same site Van Oord installed three monopiles with a quieter method, combining GBM Works' jetting solution with CAPE's vibro lifting tool for the first time at commercial scale to reduce underwater noise.

In July 2026 SSEN Transmission and the Sumitomo Electric and Van Oord consortium signed a long-term framework agreement for HVDC subsea cable systems across the north of Scotland. It includes initial design and engineering works for the proposed 525 kV Shetland 2 link.

Boreas, christened in Rotterdam in June 2025, is the largest investment in Van Oord's history. The vessel is 175 metres long, its crane can lift over 3,000 tonnes and it can install turbines of more than 20 MW. Two new flexible fallpipe vessels, Vindnes and Vestnes, are scheduled for delivery in 2028 and 2029.

In early 2026 Van Oord completed the acquisition of Xbloc, a business that designs and builds concrete armour units for protecting shorelines, ports and marine infrastructure. Since 1 March 2026 Jeroen Sanders has been Chief Transformation Officer, a new role on the Executive Committee. In October 2026 Van Oord received the IADC Safety Award for the second year running, this time for a pipe lifting tool.

Working there

Van Oord hires for its fleet, engineering, projects and staff departments. Its careers site lists marine crew, officers and ship's engineers, cost engineering, fleet maintenance, fleet newbuild, survey, QHSE coordination, logistics, project management, finance, HR, procurement, IT and legal roles, among others. In 2025 it employed people of 92 nationalities.

For staff in its Dutch offices, Van Oord lists 32 days of leave a year, an 8% holiday allowance, a possible variable bonus in April and a pension through PGB, with the company covering about 75% of the premium. International hires joining the Dutch offices get an expat package that includes housing for up to the first three months, and Van Oord handles the 30% ruling application for those eligible.

Graduates can join through the IMPACT Traineeship, open to those who completed a bachelor's or master's degree within 18 months of the start: an 18-month programme in a group of 24 trainees, with mandatory project rotations. Candidates must communicate well in English; Dutch is not required.

Last updated Nov 16, 2026 · Report an issue