Job description
Position: Solar Maintenance Technician II - Field Operations
Location: On-site, primarily in Memphis, TN.
Overview: This position is responsible for the performance of corrective and preventative maintenance tasks within a defined set of facilities. These tasks include the inspection, troubleshooting, diagnosis, and remedy of issues impacting the production of the solar PV facility. This includes repair and/or replacement of electrical and mechanical components and subcomponents such as contactors, breakers, motors, bearings, PV modules, PLCs, transformers, etc. This position may also act as a safety second and assist more senior technicians as needed.
The ideal candidate is a self-starter with a strong mechanical inclination and verifiable experience performing in the electrical trade, electrical or multicraft maintenance, or solar operations and maintenance. Experience performing maintenance tasks on DC, AC, and MV systems, communications equipment, and mechanical systems will translate well to this position.
No direct solar PV experience is required.
Main Responsibilities
- Perform scheduled preventive maintenance tasks at each facility, including the full PV system, UPS, SCADA, substation, and MV/HV/OHE systems.
- Perform corrective maintenance tasks, both scheduled and unscheduled, at each facility, including the full PV system, UPS, SCADA, substation, and MV/HV/OHE systems.
- Respond to directives for emergency dispatches for critical systems as directed.
- Log all work performed via the Silicon Ranch CMMS platform.
- Perform electrical testing using IV Curve Tracers, Power Quality Meters, Insulation Resistance Testers, Multimeters, and other testing equipment as needed.
- Assist management with field investigations to support predictive analytics, root cause analysis, and serial defect reports.
- Provide site access to third party contractors and as directed.
- Assist with other site tasks, including land management, module washing, and vegetation management as directed.
- Attend internal and external training sessions as directed.
- Must be able to communicate effectively, collaboratively and responsibly with team members and management.
- Must be able to work alone as a self-starter and work within a team driving towards a common goal.
- Must be able to stand for long periods of time.
- Must be able to work outside in most weather conditions.
- Must be able to lift 50 pounds.
Qualifications
- Intermediate skills with computers and electronic equipment required
- Intermediate skills with Microsoft Office and Adobe Acrobat required
- Working knowledge of NEC, NFPA70E, and OSHA standards
- Valid Driver's License Required
- OSHA 30 (must be obtained within 4 weeks of employment)
- CPR/BLS (must be obtained within 4 weeks of employment)
- State electrical license or NABCEP certification desired
- Ability to perform localized travel of up to 2 hours each way. Note: The first hour and Last hour of daily driving/travel is not paid. It is considered normal commute time.
Education
- High School Diploma or GED
Experience
- 3+ years of experience in the electrical trade, electrical maintenance, multicraft maintenance, or the completion of a recognized apprenticeship program required.
- Solar installation, commissioning, or operations and maintenance experience highly desired.
- Experience with MV/HV systems, IT systems, inverters, T&D systems, substations, or other specialized electrical systems desired.
Our interview process
A typical interview process at Silicon Ranch might include the below stages. Please note that we may make changes to these steps as needed, and details will be provided to you early on in the process.
- Introductory Interview with our recruiter
- Hiring Manager Interview to dive into technical skills and behavioral questions
- Panel Interview to assess cross-functional skills and dive deeper into technical skills
- Executive Interview to answer high-level questions about SRC and the team
Typical pay for similar roles
EstimateThe middle half of pay advertised on Rejobs for this group over the last 24 months. This employer has not stated a salary.
About this role
About Silicon Ranch Corporation
Company overview
Silicon Ranch Corporation, whose shareholders include AIP Management, Shell, Manulife Investment Management and TD Asset Management
Nashville, Tennessee, United States
2011
more than 300 employees (May 2025)
What they do
Silicon Ranch is one of the country’s leading developers, owners and operators of utility-scale solar energy plants. It describes itself as a fully integrated provider of customised solar energy, battery storage and carbon solutions, with more than 8 GW of solar and battery storage systems contracted, under construction or operating across the U.S. and Canada. It owns and operates every project it develops, including the underlying real estate.
Its in-house engineering, procurement and construction capabilities help it secure project sites, and its long-term power purchase agreements average 21 years. On its website the company counts more than 200 projects across 17 U.S. states and Canada and more than 4,500 MW in operation.
Through its Regenerative Energy agribusiness, Silicon Ranch keeps solar project land in agricultural production, a practice known as agrivoltaics: it grazes over 12,000 acres on more than 20 projects with family farms and its own staff, and employs a team of shepherds and thousands of sheep full time. By its own account this is the largest wholly owned agrivoltaics portfolio in the U.S. In 2021 it acquired Clearloop, which helps businesses reclaim their carbon footprint by investing in new solar projects.
Projects and track record
Silicon Ranch built the first utility-scale solar projects in Tennessee, Georgia, Mississippi, Arkansas and Kentucky. In 2012 it commissioned the 9.6 MW Chattanooga Volkswagen solar farm, the first in Tennessee, and in 2013 the 39 MW Social Circle project, Georgia’s first and at the time the largest east of the Mississippi River. In 2022 it commissioned a company record of more than 650 MW of new capacity.
The 250 MWac DeSoto Solar Farm in Lee County, Georgia, was built in three phases, and Silicon Ranch operates Phases I and III on behalf of Walton EMC and Meta. The McNeal Solar and Battery Storage Project in Cochise County, Arizona, pairs 20 MWac of solar with an 80 MWh battery for Sulphur Springs Valley Electric Cooperative, and the 50 MWac Turkey Creek Solar Ranch in Kentucky supports Amazon’s net zero carbon goals.
In August 2024 the 58 MW Scotford Solar Farm near Edmonton, Alberta, reached commercial operation. It is Silicon Ranch’s first project outside the U.S. and the largest behind-the-meter solar project in Canada, supplying Shell’s Energy and Chemicals Park, Scotford.
Recent developments
In January 2025 United Power signed a power purchase agreement for the 150 MW Byers Solar Farm in Adams County, Colorado, its fifth project with Silicon Ranch since 2014. In June 2025 Silicon Ranch closed an investment from AIP Management; it then had 3.6 GW in operation and 3.8 GW under construction or contract, and was on track to exceed 10 GW of operating capacity by 2030. The same month it invested in Swap Robotics, whose robots work alongside its sheep on vegetation management, at a time when it owned about 50,000 acres of land.
In August 2025 Silicon Ranch agreed with Central Electric Power Cooperative to build a 100 MW solar farm in Orangeburg County, South Carolina, for Meta’s first data centre in the state, with both expected online in 2027. It is the 18th project in the Meta partnership, which spans well over 1,500 MW and more than $2.5 billion of Silicon Ranch investment in four states. That month DENSO, the City of Maryville, Silicon Ranch and TVA also began operating a solar facility at DENSO’s plant in Maryville, Tennessee, the first of three planned in Blount County.
In April 2026 Silicon Ranch launched its patented CattleTracker system at the Christiana Solar Ranch in Middle Tennessee, its first commercial deployment: the trackers move into a grazing mode so cattle can graze safely beneath the panels, and Middle Tennessee Electric buys the power. In September 2026 it announced two new solar projects in Georgia, Wrens and Norwood III, whose energy goes to Georgia Power through its CARES programme; the company says it has invested or committed nearly $5 billion in the state.
Working there
Silicon Ranch’s job board lists openings for solar maintenance technicians in field operations at sites in Arkansas, Mississippi, Georgia and Tennessee, and for Remote Operations Center operators on site in Nashville. It recruits its agrivoltaic technicians mainly from rural communities and trains them to manage its land regeneratively, with sheep grazing as the main vegetation tool. Veterans made up 10.3% of its employees in February 2025.