Installation Quality Coordinator (m/w/d)
Nordex
Company Overview
Nordex SE
HeadquartersHamburg, Germany
Founded1985
SizeOver 10,900 employees worldwide (Source: linkedin.com). Revenue of over 5.7 billion euros in 2023 (Source: renewable-energy-industry.com).
What They Do
Nordex focuses exclusively on onshore wind turbines in the 4 to 6 MW+ class. The company develops, manufactures, installs, and maintains these turbines through integrated processes that include design, precision engineering, rotor blade and tower production, logistics, turnkey installation, and complete lifecycle maintenance (Source: windindustry-in-germany.com). The core platform Delta4000, introduced in 2017 with the N149/4.X, offers flexible power ratings (4-6 MW) and rotor diameters of up to 175 meters. This platform is optimized for various wind conditions and extreme climates (Source: nordex-online.com). The products cater to various customer segments, including utilities, independent power producers, and community wind projects, providing tailored solutions for site-restricted or grid-limited locations with lifespans of up to 35 years.
Projects & Track Record
In Germany, Nordex has commissioned 8,653 MW of onshore wind power plants, with 4,946 MW under construction, including the first wind farm in Hamburg featuring N27/150 turbines that have been operational for over 32 years (Source: nordex-online.com). A prototype of the N175/6.X on a 179 m high hybrid tower in Santow, Mecklenburg-Vorpommern, is in pre-series, with installation scheduled for September 2025 and commissioning between October 2025 and January 2026 (Source: nordex-online.com). Globally, Nordex supplies over 52 GW of installed turbines in 85% of markets outside China, with about 1 GW in Canada, including the N163/5.X, N163/6.X, and N175/6.X cold climate models (Source: windindustry-in-germany.com). Key customers include Bürgerwind Hollich GmbH & Co. KG and Energieversorgung Mittelrhein (evm), who engage in long-term partnerships for turnkey projects and maintenance.
Recent Developments
In the past two years, Nordex secured significant contracts in Germany, including 107 MW repowering in North Rhine-Westphalia for Bürgerwind Hollich with 12 N163/6.X on 164 m high hybrid towers (Source: renewable-energy-industry.com). Additional contracts include 21 MW from BMR energy solutions for the "Heinz" site and 77 MW for the Schneifelhöhe wind farm (Source: renewable-energy-industry.com). Milestones include the commissioning of 2,202.2 MW in Germany in the first half of 2025 and the launch of series production of hybrid towers in April 2025 (Source: nordex-online.com). The merger with Acciona Windpower in 2016 remains a key expansion, with no further acquisitions or funding rounds mentioned in the latest sources.
Working There
Nordex employs over 10,900 people in various fields, including development, production, project management, installation, logistics, sales, and service (Source: nordex-online.com). The company culture emphasizes decentralized regional operations for customer proximity and continuous training for technicians to global standards. Training is provided through the Nordex Academy, which includes GWO certifications and practical training on Delta4000 simulators (Source: nordex-online.com). Hiring occurs at the locations in Hamburg and Rostock as well as in production facilities in several countries, with increasing demand for installation and service technicians in North Rhine-Westphalia and Rhineland-Palatinate (Source: renewable-energy-industry.com).
Last updated on Feb 23, 2026 | Report an issue
Job Description
- Oversee and enforce strict adherence to all Installation Quality procedures across the region's projects, including Start-Up Audits, QASL, Non Conformity management, and Change Mgmt
- Continuously monitor the performance of all sites in the region, lead follow-up meetings, and report KPIs, monthly summaries, incidents, and findings to the relevant stakeholders
- Drive internal improvement projects, gather on-site feedback, and collaborate with engineering, sourcing, SQA, and other teams to solve deviations and strengthen weak points
- Provide on-site training for new Quality Leads, guide them in the correct application of Installation Quality processes, and deliver other quality-related trainings
- Collaborate with IQA back-office to create and update internal procedures, QCP, and documentation needed for correct and consistent execution of IQA processes globally
Your Profile
- Education: Engineering or similar
- Previous experience on Wind Industry and Quality
- Complementary Training: intermediate level computer skills
- Profile: Person with communication skills, organised, who knows how to work in a team, self-reliant, with initiative, proactive, sociable, observant and committed
- Languages: High level of English
- Availability to travel: long stays abroad
Apply now
Job expired?Please let Nordex know you found this job on Rejobs. It helps us grow and get more people working in renewable energy.
Apply now
Job expired?Please let Nordex know you found this job on Rejobs. It helps us grow and get more people working in renewable energy.
See how you’re connected
View connectionsSee your contacts at Nordex on LinkedIn and tap your network when applying for this position.
Get job alerts
Get alerts for Wind O&M jobs in Barásoain, Spain
Join Talent Pool
Let clean energy employers find you
About the role
September 2, 2026
September 2, 2026
Full time
On-site
Company
- Barásoain, Spain
Previous experience in Wind Industry and Quality
UTC+01:00