Job description
Find the right energy here and come generate something big with us!
The Mesgi'g Ugju's'n 2 (MU2) Wind Project is located in the unorganized territory of Rivière‑Nouvelle, within the Avignon RCM, and forms part of Gespe'gewa'gi, as defined by the Mi'gmawei Mawiomi Secretariat.
Apprentice Field Mechanic - CCQ
- Tower erection, component handling, and work at heights.
Hiring date: May 2026
Interested candidates are asked to express their interest through their union association.
If you have any questions, you can contact us.
Benefits
- A competitive salary in line with the collective agreement
- Comprehensive insurance coverage (health, dental, disability)
- A solid retirement plan
- Paid vacation and holidays
- Well-compensated overtime
- All equipment provided
- A close-knit team
- A respectful work environment on all job sites
Borea's values are deeply rooted in the energy landscape. We take care of each other, ensuring that our teams thrive in a healthy and safe environment. With passion and perseverance, we embrace the challenges that come our way. Borea, in collaboration with its various solar and wind construction partners, is committed to finding increasingly innovative solutions with the goal to commit to quality and responsibly and sustainably energizing future generations.
Borea Construction is committed to fostering a diverse and representative workforce and an inclusive workplace where all employees are treated equitably. We recognize that structural barriers shape professional experiences and qualifications. For this reason, we encourage individuals to apply even if they feel the position may be out of reach.
Pay & benefits
About this role
About Borea Construction
Company overview
Borea Construction ULC, a subsidiary of Pomerleau
2004
What they do
Borea Construction is an engineering, procurement and construction (EPC) contractor specialising in large-scale renewable energy projects. It offers complete solutions in wind energy, solar energy and battery storage. Its in-house teams carry out most of the work, and the company has more than 50 engineers.
Borea has built nearly 10,000 MW of wind power in Canada, including three of the country’s largest projects, and has completed nearly 100 projects. In 20 years it has delivered more than 35% of Canada’s wind and solar projects. Its sites account for more than 2,600 wind turbines and more than 1,700,000 solar panels.
Projects and track record
In Alberta, Borea built the Lanfine wind farm (151 MW, 35 turbines) for Pattern Energy from September 2021 to December 2022. From August 2021 to February 2023 it built the Hand Hills wind project (145 MW, 29 Siemens Gamesa turbines) for BluEarth Renewables, its developer, owner and operator, and from October 2021 to December 2023 the Sharp Hills wind farm (300 MW, 67 turbines).
In solar, Borea built the 48 MW Empress project in Cypress County, Alberta, from September 2022 to September 2023, and the Kneehill and Michichi plants, 25 MWac each, in Kneehill County from May 2022 to March 2023. The 124.7 MW Huckleberry solar project in Mayes County, Oklahoma, is the largest solar project Borea has built to date.
Recent developments
In December 2024 Borea completed the Buffalo Plains wind farm in Vulcan County, Alberta: 495 MW and 83 turbines, built from April 2023 with 300 workers on the project. From 16 to 19 November 2026 the company is a sponsor of RE+ 2026 in Las Vegas.
Working there
Borea has offices in Saint-Nicolas (Quebec), Abbotsford (British Columbia), Calgary (Alberta) and Plano (Texas). Office staff have a hybrid working arrangement, on-site gyms, a cafeteria and an annual Borea round table. As most projects are in remote regions, site teams travel between the company’s sites across North America.
On its sites Borea runs B.A.S.E., a behaviour-based safety programme developed specifically for renewable energy construction. Its quality management system is based on the principles of ISO 9001.