Rejobs

Renewable energy jobs at Borea Construction

9 open roles, 9 added this week.

Lévis, QC 251–500 employees Wind · Solar boreaconstruction.com
Alert me to new jobs here
Borea Construction
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
9 jobs · 1 filter active · updated 1 days ago

About Borea Construction

Company Overview

Name

Borea Construction

Headquarters

Lévis, Quebec, Canada

Founded

2004

Size

Approximately 500 employees, including more than 250 professionals and 800 field employees across North America (source: linkedin.com)

What They Do

Borea Construction is a full-service engineering, procurement, and construction (EPC) contractor specializing in utility-scale renewable energy projects, with a strong focus on wind farms and expanding expertise in solar and energy storage systems (source: boreaconstruction.com). The company differentiates itself by self-performing much of the construction work, which allows it to maintain tight control over cost, safety, and scheduling throughout project delivery (source: boreaconstruction.com). Their wind energy services encompass early-stage activities such as surveying, permitting, and land-use optimization, followed by comprehensive site civil works, foundations, turbine installation, electrical collection systems, transmission lines, substations, communications networks, testing, commissioning, and operations and maintenance building construction (source: boreaconstruction.com). Borea positions itself as a leader in large, complex Canadian renewable projects, delivering end-to-end solutions from concept through commissioning, and claims to have completed more projects across Canada than any other wind and solar contractor, representing about one-third of renewable energy development opportunities in the country (source: linkedin.com). The company also emphasizes a strong project management and value-engineering approach, supporting its reputation as a leading North American renewable energy construction firm (source: constructioninfocus.com).

Projects & Track Record

Borea Construction's project portfolio includes several notable wind energy projects across Canada. The Meikle Wind Energy Project in British Columbia is a 180-MW installation near Tumbler Ridge featuring 61 turbines; it was the first Canadian installation of those turbine types and was the largest wind project in British Columbia at the time (source: boreaconstruction.com). In Ontario, the Niagara Region Wind Farm comprises 77 turbines spread over a 450 km² area and was completed ahead of schedule despite challenging winter and spring thaw conditions (source: boreaconstruction.com). The Six-Pack project, also in Ontario, combined six major wind projects totaling 288 turbines and 468.5 MW capacity, involving extensive infrastructure including 170 km of roads, 100,000 m³ of concrete, 8,640 tonnes of rebar, nine substations, and 620 km of collection cable (source: boreaconstruction.com). Another significant project is the Cedar Point Wind Project in Ontario, a 100-MW wind farm where Borea constructed 33 km of soil-stabilized roads and poured 20,000 m³ of concrete (source: boreaconstruction.com). Additional projects include Sharp Hills Wind (300 MW), Hand Hills Wind (up to 145 MW), Buffalo Plains Wind Farm, and the Lanfine Wind Farm, all located in Alberta (source: eugeniuses.com). In solar energy, Borea completed Alberta's Suffield Solar Project, the province's first to use bifacial modules and single-axis trackers, featuring 90,000 solar panels with 23 MWac / 32 MWp capacity (source: constructioninfocus.com). The company also delivered Quebec's first solar project in 2020, combining the La Citière and IREQ Solar Projects with 30,360 panels and 11.8 MW combined capacity (source: constructioninfocus.com).

Recent Developments

In recent years, Borea Construction has continued its growth trajectory within Canada and expanded operations into the United States, reflecting a strategic push into broader North American markets (source: eugeniuses.com). The company has maintained an active project pipeline, regularly publishing updates on wind and solar projects such as Buffalo Plains, Hand Hills, Sharp Hills, and Lanfine (source: eugeniuses.com). Notably, in 2024, Borea expanded its service offerings to include battery energy storage systems, providing both stand-alone and integrated storage solutions to complement its renewable energy projects (source: usadentalreport.com).

Working There

Borea Construction offers a dynamic and stimulating work environment focused on quality execution within the renewable energy construction sector (source: linkedin.com). The company hires across a broad range of roles including engineering, project management, construction management, field operations, and support functions integral to EPC delivery (source: boreaconstruction.com). Its construction-focused operating model creates opportunities in civil works, electrical work, turbine installation, commissioning, estimating, and project controls, supporting a comprehensive career path within the renewable energy industry (source: boreaconstruction.com). Offices are located in Lévis, Quebec, with additional locations in Abbotsford, British Columbia, and Toronto, Ontario, providing a geographically diverse workplace footprint (source: boreaconstruction.com).

Last updated Oct 4, 2026 · Report an issue

Not seeing the right role? Join our talent pool