Job description
Base Location: Killin / Lochay Power Station, FK21
Salary: SS04 £36,139 - £43,188 depending on skills and experience + performance-related bonus + a range of benefits to support your finances, wellbeing and family.
Working Pattern: Permanent | Full Time
The role
Our SSE Renewables Hydro Operations and Maintenance Teams are responsible for the operation and maintenance of our Hydro generation assets. The multi-disciplined team based at Killin Workshop are accountable for the day-to-day operation, maintenance, and repair of our Hydro Generation Plant, and we have an opportunity for an Electrical Fitter / Multi-Skilled Craftsperson with an electrical bias to join the team.
Some of your main accountabilities will include;
- Carry out electrical and mechanical maintenance activities plus support civil works within your competence as part of the team.
- Be first response to faults and perform fault finding activities.
- Support Day-to-day rectification, repair and designated project work.
- Conduct routine inspections and checks to ensure our equipment and fixed plant is at a high standard of operational effectiveness.
- Report operational defects as they arise, carrying out risk assessments, plus environmental and safety inspections.
- Undergo the relevant training to operate and isolate fixed generation plant where required.
- Perform flood control duties for which training will be provided.
To be considered for this role, we would love you to have;
- Experience of working in an electrical fitter / multi-skilled craftsperson role or similar position, with a practical understanding of electrical and mechanical generation equipment.
- A minimum qualification of NVQ Level 3 / City and Guilds, or equivalent craft apprenticeship certificates.
- Good computer literacy, as you'll be required to develop a proficiency in our maintenance scheduling and reporting software, as well as other company software applications, for which training will be given.
- A flexible attitude, as from time to time you may be required to work outside in all-weather conditions, and it may be necessary to carry out work out with normal working hours.
Due to the nature of this role, you should reside, or be prepared to relocate, within 40 miles of Killin Workshop, Killin, Perthshire and hold a Full UK Driver License.
Flexible benefits to fit your life
Enjoy discounts on private healthcare and gym memberships. Wellbeing benefits like a free online GP and 24/7 counselling service. Interest-free loans on tech and transport season tickets, or a new bike with our Cycle to Work scheme. As well as generous family entitlements such as maternity and adoption pay, and paternity leave.
Work with an equal opportunity employer
SSE will make any reasonable adjustments you need to ensure that your application and experience with us is positive. Please contact Pamela Hendry on 01738 342002 to discuss how we can support you.
We're dedicated to fostering an open and inclusive workplace where people from all backgrounds can thrive. We create equal opportunities for everyone to succeed and especially welcome applications from those who may not be well represented in our workforce or industry.
Ready to apply?
Start your online application using the Apply Now box on this page. We only accept applications made online. We'll be in touch after the closing date to let you know if we'll be taking your application further. If you're offered a role with SSE, you'll need to complete a criminality check and a credit check before you start work.
Pay & benefits
About this role
About SSE Renewables
Company overview
SSE Renewables Limited, part of FTSE 100 group SSE plc
Perth, Scotland, United Kingdom
about 1,900 employees and £1,579.6 million segment revenue in the year to March 2026
What they do
SSE Renewables is a developer and operator of renewable electricity generation, focusing on onshore and offshore wind, hydro and battery storage. It builds and runs these assets as part of SSE plc’s £33bn Transformation for Growth investment plan over the five years to 2030. In November 2025 it was constructing 2.5GW of wind and battery storage capacity and progressing an 18GW secured development pipeline.
At March 2026 it had 5,279 MW of renewable generation capacity including storage, and it generated 14,507 GWh in the year to March 2026. Its core focus is the UK and Ireland, with a presence in selected markets in Continental Europe and Japan. In those international markets it is progressing a secured pipeline of around 3.3GW: about 1.3GW of onshore wind, 1GW of offshore wind, almost 800MW of solar PV and around 200MW of battery storage.
Projects and track record
Its first offshore wind co-development was the 25MW Arklow Bank project in the Irish Sea. It has since contributed to over 2.5GW of operating offshore wind in UK and Irish waters, including the 0.5GW Greater Gabbard, 0.6GW Beatrice and 1.1GW Seagreen joint ventures, which it operates on behalf of its partners. Seagreen is Scotland’s largest and the world’s deepest fixed-bottom operational offshore wind farm.
Onshore, its wind farms include the 174MW Galway Wind Park in Connemara and the 443MW Viking Energy Wind Farm in Shetland. Its in-house Onshore Wind Operations Team, set up in 2010, carries out maintenance on more than 1,050 wind turbines across 50 wind farms.
In hydro, it operates eight schemes in Scotland with 1,459MW of installed capacity, including 300MW of pumped storage. Its 100MW Glendoe Power Station opened in 2009 as the first large-scale hydro station built in Scotland since the 1940s and 1950s. In England, the 150MW Ferrybridge battery and 31MW Littleton solar farm entered commercial operation in March 2026.
Recent developments
SSE is leading development and construction of the 3.6GW Dogger Bank Wind Farm, about 130 kilometres off north-east England, a joint venture of SSE (40%), Equinor (40%) and Vårgrønn (20%) built in three 1.2GW phases. Turbine installation at Dogger Bank A was completed in February 2026. In November 2026 the project signed Cadeler’s newbuild vessel Wind Apex, which is expected to join the Dogger Bank C turbine installation campaign in Q3 2027.
In January 2026 its 1.4GW Berwick Bank B project off Scotland won a 20-year contract at a strike price of £89.49/MWh in CfD Allocation Round 7, with a final investment decision expected in 2027. SSE has named Siemens Energy as preferred supplier for its turbines and substation platforms, and in October 2026 Seaway7 for its foundations and inter-array cables. In May 2026 North Falls (up to 900MW, SSE share 50%) received development consent for its offshore array.
In continental Europe, the 64MW Jubera wind farm in La Rioja became SSE’s first operational wind farm in Spain in June 2026. In October 2026 its first Italian wind farm, the 17.3 MW Castel Favorito and Masseria la Cattiva in Puglia, began supplying power under a 2024 agreement with Microsoft. SSE’s operational onshore wind capacity in southern Europe now stands at 109 MW, with 55 MW more under construction across three sites in Spain and Italy.
In storage and hydro, SSE appointed Kirby Group Engineering and Sungrow in April 2026 as main contractors for the 100MW / 200MWh Derrymeen battery in County Tyrone. In November 2026 the first of two new generating units at the 45MW Lochay Power Station returned to commercial operation, part of an £80 million refurbishment. In June 2026 Ofgem placed the 1.44GW Coire Glas pumped storage project among 16 long-duration storage projects on its minded-to list for cap and floor support.
Working there
SSE Renewables lists main sites in Glasgow, Perth, Guildford, Dublin, Belfast and Castlebar, and its work in Europe and Japan is led by teams in Madrid, Bilbao, Santiago, Zaragoza, Lyon, Rome, Athens, Warsaw, Rotterdam and Tokyo. In November 2026 SSE announced 200 engineering and project delivery roles at its Waterloo Street office in Glasgow, including 80 new jobs, as it grows its Berwick Bank B team.
As part of SSE plc it is accredited as a real Living Wage and Fair Tax Mark company. SSE runs graduate programmes in Engineering, Project Management, IT, Energy Markets, Finance, Land, Consents & Environment, Business & Commercial and Enterprise Risk & Assurance, as well as apprentice and trainee engineering programmes leading to a recognised qualification. SSE’s published benefits include 34 days of annual leave including public holidays, with up to 10 more days to buy, 21 weeks of maternity or adoption leave at full pay, discounted SSE shares and a paid volunteering day.