Job description
About the role
This two-year contract, based on King Island, will see you join the Production and Maintenance team and provide practical support across maintenance, operations, condition monitoring and asset improvement activities. Working alongside experienced technicians, you'll help keep generation and distribution infrastructure safe, reliable and ready to perform.
Salary from $76,600 plus super and allowances ($21,000 single and $31,000 with dependants)
Benefits
-
A varied, hands-on role supporting essential renewable energy assets.
-
Practical learning alongside experienced generation and maintenance teams.
-
Career development, internal mobility and LinkedIn Learning access.
-
Electricity discount, salary packaging and financial wellbeing support
-
Unique leave options including 15 weeks paid parental leave, Public Holiday Substitution, zero debit Sick Leave and School Holiday Rebate.
-
A unique King Island lifestyle with strong community connection.
We are an endorsed employer for women, for more information on our inclusive policies, procedures and benefits visit Hydro Tasmania group | WORK180 Endorsed Employer.
Key responsibilities
-
Complete basic maintenance, operational tasks and condition monitoring.
-
Support minor repairs, preventative maintenance and functional testing.
-
Assist with refurbishment, upgrade and outage activities.
-
Record work accurately and close maintenance work orders in SAP.
-
Support safe work, environmental compliance and emergency response.
-
Coordinate with contractors, stores and other teams when required.
-
Participate in an after-hours availability roster if required.
More information can be found in the attached Position Description: PD - A&I - Maintenance Assistant - HT2.pdf
Skills & experience
-
Post‑trade qualification and/or high‑risk skills such as rigging/dogging, confined space, first aid, working at heights, truck or chainsaw licence, and experience with scaffolding or crane operations.
-
Experience maintaining industrial electrical or mechanical equipment.
-
Sound workshop practices and a practical approach to problem-solving.
-
Confidence using Microsoft Office and learning work systems such as SAP.
-
A current Australian driver licence.
Living on King Island
King Island offers space to breathe, genuine community connection and a lifestyle shaped by the coast. Located in Bass Strait, it is a short flight from mainland Tasmania and Victoria, while offering a noticeably different pace from city life.
Outside work, rugged coastlines, beaches, farmland and ocean views are part of everyday life. Fishing, surfing, diving, hiking, golf and exploring the island are all close at hand. King Island is also known for premium local produce, including beef, seafood and cheese.
For individuals and families, the island offers a welcoming community, minimal traffic and opportunities to build strong local connections. Relocating to an island is a meaningful lifestyle choice, so we encourage applicants to consider both the professional opportunity and the practical realities of island living.
Our people are central to everything we do. We're committed to an inclusive, flexible and equitable workplace, welcoming applications from all members of the community. Flexible working options are available for every role, and our recruitment is merit‑based to ensure fairness and diversity.
Questions and next steps
Please attach your resume outlining what skills and experience you will bring to the position. Applications close 9am Thursday 26th November and we may engage with suitable candidates as soon we have reviewed their applications.
Hydro Tasmania is committed to creating an inclusive and accessible recruitment experience. If you require adjustments or accommodation during any stage of the process, please let us know. Please note we do not accept applications via email.
Recruitment agencies: we respectfully ask that no agency resumes be presented at this stage.
Pay & benefits
About this role
About Hydro Tasmania
Company overview
Hydro-Electric Corporation, trading as Hydro Tasmania; a government business enterprise owned by the Tasmanian Government
Hobart, Australia
1914
About 1,400 full-time equivalent employees (June 2026); revenue of A$1.77 billion (year to June 2026)
What they do
Hydro Tasmania is Australia’s largest generator of clean, renewable energy. It operates 30 hydropower stations and 54 large dams, two hybrid energy systems on the Bass Strait islands and a gas power station, and owns a 25% share in three wind farms. Its hydropower fleet had 2,295 MW of installed capacity in the year to June 2026, when its stations in mainland Tasmania generated 7,555 GWh.
The electricity it generates powers Tasmania and can be sold into the National Electricity Market through the Basslink interconnector. Its retailer, Momentum Energy, supports more than 200,000 customers, from households to industry, across Victoria, the Bass Strait islands, New South Wales, Queensland, South Australia and the ACT. Its consulting arm, Entura, supported 692 water and clean energy projects in the year to June 2026: 450 in Tasmania, 173 across Australia and 69 in the Indo-Pacific. Hydro Tasmania is also Australia’s largest water manager.
Projects and track record
The Tasmanian Government bought the partly built Waddamana station in 1914 and formed the Hydro-Electric Department. Waddamana opened in 1916 as its first hydroelectric power station; the last, Tribute, was named in 1994, and with the Basslink cable to Victoria the company entered the National Electricity Market in 2005.
On King Island, its Huxley Hill Wind Farm began generating in 1998 as only the second commercial wind farm in Australia. Its largest wind farm, Musselroe, has 56 turbines and 168 MW and was built in 2013, and on Flinders Island a hybrid system with a wind turbine, a solar array and a battery has run since 2017.
Gordon Power Station has three 144 MW machines that together produce an average of 1,200 GWh a year. In 2024, Hydro Tasmania agreed to buy the energy from a proposed 288 MW solar farm in the Northern Midlands.
Recent developments
In August 2026, Hydro Tasmania completed an A$35.5 million upgrade of Edgar Dam four months ahead of schedule, with more than 95% of the budget spent in Tasmania. In September 2026, a new main inlet valve weighing over 100 tonnes arrived at Gordon Power Station, the first of three. In October 2026, it completed the first stage of a major upgrade at Poatina Power Station, part of a 10-year, A$200 million overhaul of the station’s six turbines.
In February 2026, it began the first stage of the construction tender to redevelop the Tarraleah scheme, which has run for more than 85 years; the project has not reached a final investment decision and still needs environmental, planning and parliamentary approval. The proposed Cethana pumped hydro project would have 750 MW of generating capacity and 20 hours of storage.
In November 2025, Hydro Tasmania opened a tender for wind and solar projects that can deliver up to 1,500 GWh a year and run within five to six years. In October 2026, it agreed in-principle terms for a five-year power deal with Rio Tinto Bell Bay Aluminium, Tasmania’s largest industrial energy user.
Working there
At June 2026, 77.6% of the group’s full-time equivalent staff were based in Tasmania, and the Australian Association of Graduate Employers ranked Hydro Tasmania nationally among the top 10 graduate employers and top 20 intern employers. It takes on mechanical and electrical apprentices for a four-year program that covers TAFE course and tuition fees; applications for the 2027 intake opened in July 2026.
Besides apprenticeships, it runs a graduate program. Its published benefits include 15 weeks of paid parental leave for all caregivers, an electricity discount and salary packaging through Smart Salary, and it is endorsed by WORK180 as an employer for women.