Rejobs
ENERCON
ENERCON
17 open jobs · Posted 2 days ago

Asset Engineer (m/f/d)

Join ENERCON as an Asset Engineer (m/f/d) in Maia, Portugal, supporting wind farms through their operational and service phases. Investigate technical issues, review reports, monitor performance and claims, and help prioritise major component replacements. Work with global teams on customer support, technical reporting and service improvements.

Salary
Not stated
Location
Maia, Portugal
Workplace
On-site
Job type
Full time
Applies on career.enercon.de

Check your inbox.

On a phone? Apply from a computer later.

The Asset Engineer is responsible for providing in-depth technical expertise and support during the operational and service phases of wind farm projects. This role monitors the resolution of technical issues, supports claim management, and contributes to the continuous improvement of processes and tools. The Asset Engineer collaborates closely with Global Service, WRD, and other internal departments to deliver high-quality technical solutions and maintain customer satisfaction.

Reporting Line

  • Head of After Sales Center of Excellence

Interfaces within EC

  • Regional Departments
  • Global Sales & After Sales
  • Service Technical Management
  • Service Operations
  • Global Health & Safety
  • Global Excellence
  • Legal Department
  • Accounting Department

Areas of Responsibility

1. Regional Technical Expertise

Act as regional technical expert supporting After Sales team in:

  • Technical investigation reports;
  • Technical checks on the availability reports;
  • Hot spots;
  • Review of Lifetime extension reports provided by customers.

2. Claims & Performance Monitoring

  • Maintain an overview of the claims in negotiation in the region;
  • Monitor deviations in wind farm performance, including anomalies in power curves, SCADA notifications, fault patterns, etc;
  • Develop and enhance tools for performance monitoring (if nominated).

3. Prioritization Support

  • Support the prioritization of MCR (Major Component Replacement) within the region;
  • Advise and oversee measurement campaigns (e.g. noise assessments, power curve validations).

Main Activities

1.Technical Analysis and Reporting

  • Review availability calculations and supervise the reallocation process;
  • Translate the root cause analysis conducted by the service organization after major faults or on customer's demand, into technical investigation reports for customers, insurers, and other external stakeholders;
  • Deliver evidence-based technical justifications to support ENERCON's position in response to customer claims or to substantiate ENERCON's own claims;
  • Respond to customer reports including end of contract inspections and third-party assessments;
  • Review and approve the Life Time Extension reports submitted by customers, ensuring completeness and technical quality in cooperation with WRD.

2. Customer & Stakeholder Support

  • Advise After Sales Manager on deviations in wind farm performance e.g. anomalies in power curves, SCADA notifications, faults, etc.
  • Advise After Sales Manager on technical knowledge about new service products.
  • Liaise with technical support to provide technical input and background for formal statements to After Sales Managers (e.g. hot spots).
  • Coordinate and oversee the handling of customer technical issues within the service organization and WRD.
  • Participate in customer inspections and support measurement campaigns.

3. Knowledge Transfer & Collaboration

  • Provide training and guidance to colleagues and customers on SIP and SCADA;
  • Participate in country specific MCR meetings, contributing regional After Sales perspectives on priorities and synergies.

4. Authorities

  • Technical check of availability calculations performed by Back Office Coordinators (peer review);
  • Technical check of technical investigation reports performed by another asset engineer (peer review).

5. Processes in which the role is involved

  • Technical investigation reports;
  • Technical checks of Availability Calculations;
  • Compensations / bonus;
  • Claim management between ENERCON and Customers after TOC;
  • Major Components Replacement;
  • Lifetime Extension approval.

Your Skills

  • Degree in Mechanical, Electrical, Industrial Engineering or a related field;
  • Experience in the wind energy industry, technical sales & marketing, renewable energy R&D, or related areas;
  • Knowledge of data analysis and reporting tools;
  • Fluent in English;
  • Advanced knowledge of MS Office, SAP, Power BI, and data analysis tools;
  • Good communication skills;
  • Ability to work collaboratively in a multicultural environment;
  • Critical observation and problem-solving.

About this role

Posted
26 Nov 2026
Sectors
Timezone
UTC+00:00
Experience
Experience in the wind energy industry, technical sales and marketing, renewable energy R&D, or a related area.
Employer enercon.de LinkedIn ENERCON

About ENERCON

Company overview

ENERCON (holding company UEE Holding SE & Co. KG), wholly owned by the Aloys Wobben Stiftung

Aurich, Germany

1984

about 12,800 employees (end of 2025); revenue 2025: EUR 4.45 billion

What they do

ENERCON specialises in the development, production, sales and service of onshore wind turbines. All its current turbines use a gearless direct drive with a synchronous generator, with permanent-magnet (PMG) technology or electrical excitation depending on the type.

The range covers four turbine models on two platforms, rated 4 to 7 MW. The EP5 platform for medium to low wind sites includes the E-175 EP5 E1/E2 with 6 and 7 MW and a 175-metre rotor, and the E-160 EP5 E3 with 5.56 MW and 160 metres; the EP3 platform for wind class IIA sites offers the E-138 EP3 E3 with 4.26 MW and 138 metres.

In September 2025 ENERCON turned from a turbine maker with service into a solution provider. On request it builds hybrid power plants of wind farm, battery storage and grid connection, and for operation it offers monitoring, proactive maintenance, spare parts management and cyber security packages, among other services.

ENERCON laid the foundation for its operations and maintenance business more than 30 years ago with the ENERCON Partner Konzept (EPK). Today 58 GW are under service contract, looked after by more than 5,000 service staff at over 350 service stations worldwide, and in its core markets ENERCON ensures 97 percent technical availability.

ENERCON runs its own plants in Germany, Portugal and Turkey: Aurich for rotor hubs and nacelles, Magdeburg for generators, and Viana do Castelo and Izmir for rotor blades. Partners in China, India and Turkey also make rotor blades and generators.

Projects and track record

In 1993 ENERCON introduced the E-40 / 500 kW, its first generation of gearless wind turbines. More than 2,700 units of the E-66 / 1.5 MW, launched in 1995, were sold worldwide; the E-82 / 2 MW of 2005 is still the most frequently erected ENERCON turbine, and the E-126 / 7.5 MW was in its day the most powerful onshore wind turbine in the world. In 2017 ENERCON took over the Dutch manufacturer Lagerwey and integrated its PMG technology.

ENERCON now has more than 65 gigawatts installed, with turbines in more than 50 countries. In Turkey, ENERCON and Enerjisa Üretim agreed 1,000 MW for the YEKA 2 project: after 750 MW in the first phase, a supply contract for the remaining 250 MW with 60 E-138 EP3 E2 turbines followed in March 2024.

In Japan, ENERCON completed the first phase of the Shirakami project in September 2024 with 14 E-115 EP3 E3 turbines and 58.8 MW. At the Mailiao wind farm in Taiwan, three E-115 EP3 turbines for Formosa Heavy Industries replace four old ones and raise output fivefold.

Recent developments

In 2025 ENERCON installed 2,785 MW worldwide (2024: 2,776 MW). In Germany its installed capacity rose from 1,188 MW in 2024 to 1,592 MW, and by number of turbines ENERCON led the market there with 313. The company put its order intake at almost EUR 6 billion, about 40 percent more than the year before.

In December 2025 the second prototype of the E-175 EP5 E2 started feeding power into the grid at the Janneby wind farm, with a 175-metre rotor, a 132-metre hub height and 7.0 MW rated power. In January 2026 Windpower Monthly gave the model the gold medal in its Turbines of the year award 2025 in the category for onshore turbines of 7.0 MW and above, and in August 2026 TÜV Süd issued the final type certificate.

In April 2025 ENERCON and RWE signed a letter of intent for a long-term European onshore partnership in which ENERCON supplies, installs and maintains the turbines. In June 2025 ENERCON signed a partnership contract for about 100 turbines with enercity Erneuerbare, with a project volume of up to EUR 800 million. In April 2026 came a framework agreement in Canada for more than 440 MW with over 60 E-175 EP5 E2 turbines, with first deliveries planned for early 2027.

In May 2026 ENERCON announced its own rotor blade plant for the E-175 EP5 E2 in Bergama, Izmir province, with 700 jobs and capacity for up to 150 blade sets a year; ENERCON has about 4 GW installed in Turkey. In September 2026 ENERCON and financing partners launched the ENERCON Finance Solutions Funds, which offers operators mezzanine loans of up to EUR 10 million per project.

In July 2026 ENERCON signed its first Wind+ Storage projects in Germany with Planungsbüro Düser: at Möhnesee-Westrich a 5 MW / 10 MWh battery is combined with two E-138 EP3 E3 turbines, and at Soest-Meiningsen a 15 MW / 30 MWh battery is planned; both are due to start operating in the first quarter of 2027. In September 2026 PNE and ENERCON presented the Beerfelde energy park in Brandenburg, which is to combine about 98 MW of wind power from 14 E-175 EP5 E2 turbines with storage of about 32 MW and 70 MWh.

Working there

ENERCON is organised in five global regions: APAC, CAMEA, CNE, NA and SWELA. More than 7,000 people work in Germany, home to all central functions, including procurement, IT, HR, finance, marketing and project management, as well as research and development in Aurich, production in Aurich and Magdeburg and over 10 service sites.

In Portugal ENERCON employs about 1,400 people at more than 10 sites, with rotor blade production in Viana do Castelo since 2007. Turkey has over 500 employees, and Canada about 270 at several offices and 16 service sites, where service jobs are most in demand.

Benefits include flexible working time models and mobile work, a company pension, training from specialist seminars and language courses to leadership training, and company fitness and health checks. Entry areas range from controlling and finance, procurement, HR, IT, logistics and marketing to research and development, production, project management, sales and service.

At selected German sites ENERCON trains apprentices, for example as mechatronics technicians, industrial electronics technicians or IT specialists, and in Aurich it offers dual degrees in Business Administration, energy engineering, computer engineering and business informatics. Pay starts at no less than €1,010 gross a month, with 30 days' paid holiday. Students can do internships of 4 weeks or more, work as working students for up to 20 hours a week in term and up to 40 in the breaks, or write their thesis.

More wind jobs like this

Asset Engineer (m/f/d)
ENERCON