Not seeing the right role? Join our talent pool
About Berde Renewables
Company overview
What they do
Berde Renewables, co-founded by Morris Zhou and Patrick Zhu, develops, builds and operates distributed renewable energy projects for commercial and industrial customers. Its three core business lines are behind-the-meter commercial and industrial solar, embedded generation for electric cooperatives, and the acquisition and development of clean energy projects, with operations in the Philippines and Thailand. Under its power purchase agreement model, Berde finances, builds, owns and operates the solar assets at a customer's site for the contract term, after which ownership passes to the customer.
The company grew out of Maoneng Philippines, which co-founder Patrick Zhu started in 2017; in 2023 Maoneng Philippines and I Squared Capital formed a joint venture to establish Berde, which says it uses only Tier 1 solar and electrical equipment. Its behind-the-meter solar platform spans Luzon, Visayas and Mindanao, and as of the fourth quarter of 2026 it had more than 120 MW of signed projects in operation or under construction, with a further 200 MW in its development pipeline.
Projects and track record
In October 2023 Berde signed a 20-year power purchase agreement with Holcim Philippines for rooftop solar at its cement plants in Bulacan and La Union, with a combined capacity of 5.5 MWp and an expected output of about 7.8 GWh a year; Berde called it the first rooftop solar project for the cement industry in the Philippines. In April 2025 the two companies extended the partnership to Holcim's sites in Davao City and Lugait, Misamis Oriental, raising the combined capacity to 12.79 MWp.
In September 2024 Berde agreed with the Magic Group of Companies to install a 729 kWp solar system at Magic Mall San Carlos in Pangasinan. In August 2025 it signed an 8.4 MWp solar power purchase agreement with KCC Malls and Biotech Farms covering KCC Mall Gensan, KCC Mall Marbel, KCC Mall Zamboanga and a Biotech Farms agro-industrial site in South Cotabato, with Berde financing the systems and overseeing engineering, procurement and construction as well as operations and maintenance. In April 2026 Big E Food Corporation, maker of Lemon Square, energised a 1.685 MWp rooftop system at its food plant in Bulacan, built under a 25-year build-own-operate-transfer agreement.
Recent developments
In October 2026 Datian Subic Shoes energised 3.06 MWp of rooftop solar across its two plants in Subic Bay, developed, financed and operated by Berde under a 20-year build-own-operate-transfer agreement. In July 2026 Berde signed a master framework agreement with Sungrow and its regional distributor Solar Hive to procure 200 MW of solar inverters and 500 MWh of battery energy storage systems over three years for projects in the Philippines and Thailand.
In March 2025 Berde formed a joint venture with Power Systems and Solutions Co. Ltd. (PSS) in Thailand, with the goal of developing, owning and operating 300 MW of renewable projects over three years. At the Solar Quarter Week PH 2025 Leadership Awards it was named Solar Company of the Year: Developer.
Working there
Berde's head of asset operations leads the health, safety, environment and quality, engineering and design, project management and construction, and operation and maintenance departments, and the company also has a Commercial & Development Division. Its office is in The Podium West Tower in Mandaluyong. On its website Berde says it is always looking for talented people and invites candidates to say what they are looking for.