Rejobs

Renewable energy jobs at Helion Energy

Everett, WA 251–500 employees Fusion helionenergy.com
Alert me to new jobs here
Helion Energy
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
1 job · updated 145 days ago

Not seeing the right role? Join our talent pool

About Helion Energy

Company overview

Helion Energy, backed by investors including Lightspeed Venture Partners, Mithril Capital and SoftBank Vision Fund 2

Everett, United States

2013

What they do

Helion is a fusion energy company focused on generating zero-carbon electricity from fusion. It was founded in Washington State by David Kirtley, Chris Pihl, John Slough and George Votroubek to build a fusion system designed for commercial electricity.

In its machines, two colliding plasmas in a field-reversed configuration (FRC) are compressed by a powerful magnetic field until they reach fusion temperatures above 100 million degrees Celsius. As the plasma expands, it pushes against the magnetic field and induces a current that is recaptured directly as electricity. Helion uses helium-3 as fusion fuel and produces it in-house from deuterium.

Projects and track record

Helion has built and tested seven fusion prototypes. The sixth, Trenta, set a commercial fusion industry record for plasma temperature at 100 million degrees Celsius.

In 2023 Helion signed what it calls the world’s first fusion power purchase agreement with Microsoft, for 50 megawatts of clean electricity; its first power plant, Orion, is designed to meet that commitment, with initial operations beginning in 2028. Also in 2023, Helion and the steel producer Nucor announced an agreement to develop a 500 MWe fusion power plant at a Nucor steel manufacturing facility in the United States.

Recent developments

Construction of Orion began in July 2025 in Malaga, Washington, and Helion aims to have it online by 2028. In June 2026 Helion received a radioactive materials licence and a radioactive air emissions licence for Orion from the state of Washington.

In February 2026 Helion announced that its Polaris prototype had become the first privately developed fusion machine to demonstrate measurable deuterium-tritium fusion and had reached plasma temperatures of 150 million degrees Celsius. TechCrunch reported the temperature as three-quarters of the way to what the company thinks it will need to operate a commercial fusion power plant.

In June 2026 Helion announced a Series G funding round led by Thrive Capital at a post-money valuation of $15.5 billion, and the round closed at $500 million in September 2026. In October 2026 it signed a letter of intent with the U.S. Department of Commerce to receive up to $175 million in CHIPS research and development funding for next-generation semiconductor technologies for commercial fusion energy.

Working there

Helion hires engineers, technicians, machinists and scientists, with open positions in mechanical engineering, electrical engineering, plasma physics, power electronics, manufacturing, supply chain and operations. Its jobs are in Everett and Chelan County, Washington.

Helion offers a 5% 401(k) match and stock options for all employees, plus 21 days of annual leave, 10 days of sick leave, 11 public holidays and a week’s winter break. Parents get up to 12 weeks of paid leave to care for a new child, and birthing parents 4 more weeks.

Last updated Nov 16, 2026 · Report an issue