About Neoen
Company overview
Neoen SAS, wholly owned by Brookfield since 2025
Paris, France
2008
What they do
Neoen is a producer of exclusively renewable energy whose strategy rests on solar, wind and storage; it produces green electricity for states and industrial customers. The company works at every stage of its projects: it develops and designs them from the outset, obtains the permits, invests in each one, oversees construction and then, as owner, operates its solar farms, wind farms and batteries.
Its capacity in operation, under construction or under management totals 10.6 GW, and its battery portfolio, built up since 2017, reaches 3.5 GW / 10.6 GWh in operation or under construction. In Australia, Neoen describes itself as the country’s largest renewable energy company, having contributed more than 6 GW of wind, solar and storage capacity to its energy transition. The group’s holding company and governance entity, Neoen Limited, is headquartered in London.
Projects and track record
In 2017 Neoen commissioned Hornsdale Power Reserve in Australia, then the world’s largest storage plant (100 MW / 129 MWh). Its most emblematic achievements include the Western Downs Green Power Hub in Australia, which combines the country’s largest solar plant (460 MWp) with Western Downs Battery (540 MW / 1,080 MWh), and Collie Battery (560 MW / 2,240 MWh), one of the largest storage plants in the world. They also include Cestas, France’s most powerful solar farm (300 MWp), and Mutkalampi, Finland’s largest wind farm (404 MW).
In October 2025 Neoen inaugurated Goyder South (412 MW) in South Australia: with 75 turbines, it is the state’s largest wind farm and the largest in Neoen’s portfolio.
Recent developments
In October 2026 Neoen began building the Goyder North Stage 1 wind farm (346 MW) in South Australia; under a 100 MW baseload contract, its output will supply BHP’s Olympic Dam, Carrapateena and Prominent Hill mines. The same month it raised AUD 1.8 billion of debt from 13 lenders for a 1.2 GW Australian portfolio of 5 assets.
In France, Neoen signed an agreement in November 2025 to sell a portfolio of 760 MW of operating assets to Plenitude, an Eni subsidiary. In October 2026 it inaugurated the Breizh Big Battery (92 MW / 183 MWh) at Pleyber-Christ, its first large battery in the country and the largest in Brittany, and it is building France’s largest battery at Vernou-la-Celle-sur-Seine (248 MW / 496 MWh). Neoen also started building three solar farms and a wind farm totalling 101 MW in summer 2026; its French teams have launched construction of more than 500 MW since the start of 2026, a contribution to its target of 2 GW a year worldwide.
Neoen announced Ako Battery (100 MW / 400 MWh) in April 2026, its first investment in Japan, which will be one of the largest batteries in the country. In June 2026 it won a 20-year contract in Ontario, to be served by a new 200 MW / 1,600 MWh battery owned jointly with Eagle Lake First Nation.
Working there
According to its careers page, 35.4% of Neoen’s employees are women, and women hold 27.7% of its management positions. Neoen regularly offers internships and VIE placements (the French international volunteer programme) that can lead to a permanent contract, and its 2024 sustainability report describes a telework policy, notably in France and Australia, that lets eligible employees work from home one day a week.
In November 2026 Neoen was hiring, among others, a project manager in Sydney to develop data centre projects in New South Wales and an intern for its Operations Control Centre in Canberra.