Rejobs

Renewable energy jobs at Cypress Creek Energy

Cypress Creek Energy, a US independent power producer founded in 2014, develops, owns and operates solar and storage projects across the country.

Durham, NC 251–500 employees Solar · Energy storage cypresscreekenergy.com
Alert me to new jobs here
Cypress Creek Energy
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
7 jobs · updated 7 days ago

Not seeing the right role? Join our talent pool

About Cypress Creek Energy

Company overview

Cypress Creek Energy, owned by EQT Infrastructure since 2021

2014

more than 400 employees

What they do

Cypress Creek Energy is a U.S. independent power producer and developer of energy infrastructure that develops, finances, owns, operates and maintains solar, storage and other energy assets across the country. It serves utilities, communities and large-load customers with integrated solar, storage and firm capacity solutions, and its commercial team manages relationships with utilities, municipalities, corporates and wholesale market participants. Since inception it has commercialized 19 GW of projects; today it has more than 6.8 GW of assets operating or under construction and a 19 GW development pipeline.

In July 2019 the company adopted its Go Forward strategy of becoming a renewable independent power producer that builds, owns and operates solar and storage projects for the long term. It added corporate customers alongside utilities and moved engineering, procurement and construction to third-party contractors.

Its in-house operations and maintenance platform, Cypress Creek Solutions, manages more than 8.6 GW of energy assets for Cypress Creek and third-party owners across 24 states. The work is run from a round-the-clock, NERC-registered control center opened in 2018 in the company’s flagship office in Durham, North Carolina.

Projects and track record

Cypress Creek placed its first 26 MW of solar capacity in North Carolina in service in December 2014, and in November 2016 it acquired North Carolina-based FLS Energy, gaining 350 MW of operating projects and 600 MW of near-term pipeline. Innovative Solar 46, a 100 MW plant in Cumberland County, North Carolina, was one of the largest solar farms east of the Mississippi River when it was completed in 2017.

Its utility-scale solar plants include Zier Solar in Brackettville, Texas, a 208 MW site with a 40 MW, two-hour battery system, connected to the grid in 2024. Brazos Bend, a 100 MW system outside Houston, is its first standalone energy storage site.

The Ostrea Solar project in Yakima County, Washington, rated 104 MWdc / 80 MWac, reached commercial operation in September 2026; Microsoft is the long-term buyer of its energy and environmental products, and Cypress Creek will own and operate it for up to 40 years. In November 2025 the company reached financial close and started construction on the 505 MWdc (396 MWac) Hanson Solar facility in Coleman County, Texas, which will supply Meta under a power purchase agreement and is expected to start commercial operation in mid-2027. The Sundance Energy Center in Elbert County, Colorado, pairs 98 MWdc of solar with 200 MWh of battery storage, sells all of its electricity to CORE Electric Cooperative and lists November 2026 as its commercial operations start date.

Recent developments

According to its 2025 sustainability report, more than 1 GW of its solar and storage projects were under construction in 2025, and it invested about $950 million in new energy infrastructure. In March 2026 Cypress Creek acquired the Steel River project in Mississippi County, Arkansas, from Swift Current Energy. In June it closed $3.5 billion of financing for the first two phases, which will add 1.63 GW of solar and 1.9 GWh of battery storage.

In July 2026 it broke ground with Google, which has secured energy from both phases. When complete, Steel River is to provide 2.5 GWdc of solar and 2.9 GWh of battery storage by 2029, built with U.S.-made solar modules from First Solar. The financing made Cypress Creek a finalist for Energy Deal of the Year in the S&P Global 2026 Platts Global Energy Awards.

Kevin Smith, previously CEO of Arevon Energy, was appointed CEO in March 2026, succeeding Sarah Slusser. In October 2026 Peter Toomey became Chief Operating Officer, Nancy Bucher joined as Chief People Officer and Billy Wang joined as Executive Vice President of Cypress Creek Solutions. In April 2026 TIME ranked the company No. 29 out of 250 on its list of America’s Top GreenTech Companies of 2026, still under the name Cypress Creek Renewables; since June 2026 its releases use the name Cypress Creek Energy.

Working there

Cypress Creek hires project developers, engineers, finance professionals and field service technicians. Its corporate offices employ developers, accountants, engineers, lawyers and other professionals, while the Cypress Creek Solutions field team works in safety, project management and field service roles. Each year it offers paid internships to seniors, recent graduates and graduate students.

It has seven corporate offices: Durham and Asheville in North Carolina, San Francisco and Santa Monica in California, New York, Chicago and Washington, D.C. Its published benefits include 15 days of paid time off with accrual up to 20 days, 10 observed holidays, a 401(k) match, tuition reimbursement and, for military veterans, an extra paid holiday on Veterans Day.

Last updated Nov 24, 2026 · Report an issue