Rejobs

Renewable energy jobs at Haizea Wind Group

4 open roles, 4 added this week.

zierbena 1,001–5,000 employees Wind haizeawindgroup.com
Alert me to new jobs here
Haizea Wind Group
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
4 jobs · 1 filter active · updated 1 days ago

About Haizea Wind Group

Company Overview

Name

Haizea Wind Group, a Spanish private industrial group

Headquarters

Zierbena, Spain

Founded

2017

Size

About 1,200 employees and €416.9 million in revenue in 2025 (source: haizeawindgroup.com)

What They Do

Haizea Wind Group specializes in the design, manufacture, and assembly of large metal structures for the wind industry, focusing on onshore and offshore wind towers, offshore foundations, and large cast and machined components such as hubs, frames, and shafts (source: haizeawindgroup.com). Their industrial processes include bending, welding, flange assembly, surface treatment, and internal assembly of wind towers (source: haizeawindgroup.com). The group’s production structure is divided into four main divisions: Haizea Bilbao for offshore towers and foundations, Haizea Grupo WEC for large castings, Haizea Tecnoaranda for onshore towers, and Haizea Breizh for offshore towers in France (source: haizeawindgroup.com). They position themselves as a strategic supplier for OEMs and offshore developers requiring XXL structures, especially large monopiles and offshore towers for turbines over 15 MW (source: energyglobal.com).

Projects and Track Record

Haizea Wind Group has supplied key components for major offshore wind projects across Europe and other regions, including East Anglia One, Dogger Bank, Borssele 1 & 2, Hollandse Kust Zuid, Hornsea Two, Seamade, Saint-Nazaire, Saint-Brieuc, Hywind Tampen, and Formosa (source: iberdrola.com). A highlight is the framework agreement with Iberdrola worth over €200 million for the supply of 50 monopiles for East Anglia Three from the Port of Bilbao (source: iberdrola.com). Recently, they delivered monopiles for Ørsted’s offshore wind farm in the North Sea, structures considered among the largest ever manufactured in Spain (source: energyglobal.com). Their Bilbao plant, with over 900 employees and more than 200,000 m² of space, is the only facility in Spain capable of producing monopiles over 11 meters in diameter and 105 meters in length, weighing approximately 2,300 tons (source: energyglobal.com).

Recent Developments

Between 2024 and 2025, Haizea Wind Group experienced significant growth, increasing its revenue from €371 million in 2024 to €416.9 million in 2025, alongside expansion in EBITDA and net profits, reaching €20 million in 2025 (source: haizeawindgroup.com). Revenue nearly tripled from €129 million in 2020 to over €400 million by the end of 2025 (source: haizeawindgroup.com). In 2026, the delivery of monopiles for Ørsted stood out due to the exceptional size of the structures and consolidated the Bilbao plant as the European leader in monopiles for turbines over 15 MW (source: energyglobal.com). Additionally, the 2023 agreement with Iberdrola for East Anglia Three reaffirmed their position as a leading European manufacturer of large offshore towers (source: iberdrola.com).

Working There

The Haizea Wind Group workforce includes specialized industrial profiles in production, welding, machining, surface treatment, assembly, engineering, project management, logistics, quality, and corporate support functions, reflecting its manufacturing-intensive structure (source: haizeawindgroup.com). The company operates from its headquarters in Zierbena and has plants in Agurain, Brest, Itziar, and Aranda de Duero, offering a multinational and multidisciplinary work environment (source: linkedin.com). According to various sources, the number of employees ranges from 1,200 to over 1,500, reflecting sustained growth and a consolidated structure in the wind sector (source: pitchbook.com).

Last updated Sep 23, 2026 · Report an issue

Not seeing the right role? Join our talent pool