Not seeing the right role? Join our talent pool
About Valeco
Company overview
What they do
Valeco develops, finances, operates and maintains renewable power plants across France, and also maintains wind and solar plants for third parties. At the end of June 2026 it had 1,010 MW in operation. Its president is François Daumard.
In onshore wind, Valeco operates 684 MW and 252 turbines, which produced 1,600 GWh in 2025. In solar, it has 327 MWp in operation across 61 plants and 152 MWp under construction. In agrivoltaics, it has more than 500 MWp of authorised projects and 140 MWp under construction.
Valeco is developing 1.6 GW of battery storage projects, 1 GW of them standalone, with no power plant attached. It also sells its electricity to businesses through long-term power purchase agreements (PPAs) and passed 40 signed PPAs in 2025. For offshore wind, EnBW created EnBW Valeco Offshore (EVO), which develops, builds and operates offshore projects in France from 6 offices.
Projects and track record
Valeco commissioned its first wind farm at Tuchan in 2001, then the largest in France, followed by France’s first ground-mounted solar plant at Lunel in 2008. It repowered a wind turbine for the first time in 2018.
When EnBW bought it in 2019, Valeco employed around 135 people and had 276 MW of onshore wind and 56 MW of solar installed. WattaBase ranked Valeco 3rd among French wind developers by MW authorised in 2024, after 2nd place in 2023.
Recent developments
On 18 September 2026 Valeco inaugurated the Clave solar plant (23.4 MWp), built on a former sand quarry at Durance in Lot-et-Garonne. It supplies 9 mid-sized companies in Nouvelle-Aquitaine under France’s first multi-buyer renewable power purchase agreement. In July 2026 Valeco, POMONA and Alterna énergie signed a 15-year PPA backed by 2 Valeco solar plants in Gers and Mayenne, supplying close to 12 GWh a year.
In June 2026 Valeco inaugurated the repowered Combaynart wind farm in Tarn: first commissioned in 2005, it now has 8 turbines instead of 12, with 54% more capacity. In September 2026 Valeco and Eclipse signed 2 contracts for the Montjean (Mayenne) and Patureault (Deux-Sèvres) battery projects, two 4 MW / 8 MWh systems co-located with operating wind farms.
In December 2025 Valeco won 58.42 MW in the CRE technology-neutral tender, placing 3rd. Since 1 November 2025 a collective self-consumption loop has run at Saint-Arnac and Lesquerde, the first in France to include a wind turbine. In October 2025 Valeco inaugurated a poultry agrivoltaic demonstrator at Marsais (Charente-Maritime), a trial run with INRAE for at least 3 years.
Working there
Valeco’s teams work from site identification to selling renewable electricity: territorial development, project development, pre-construction, construction, and operations and maintenance, plus offshore, purchasing and finance. The company recruits regularly on permanent (CDI) and fixed-term (CDD) contracts and offers work-study places and final-year internships.
The Toulouse office, opened at the end of 2018 with 4 staff, now has more than 20 people; Nantes, opened in summer 2017, has about 20, and Bordeaux, opened in September 2021, has 17 permanent staff. At Lacaune, a team of 3 technicians handles wind farm maintenance for Valeco’s 80 turbines within 20 km.
A telework charter signed with the works council in 2022 allows 2 days of telework a week and 10 days of working away a year, and Valeco has held the Employeur Pro-Vélo label since 2023. For 2025 it scored 78/100 on France’s gender equality index.