Popis pracovní pozice
Responsible for organizing and managing Site Quality Managers and Quality professionals. Works with Project Team at the Program level to liaise requirements and information for project to the SQM for FQCP Development.
Essential Duties and Responsibilities
- Work with the Site Quality Manger to develop, implement and facilitate FQCP for the projects.
- Work with Subcontractors to develop FQCP requirements and provide training.
- Organizes Project Quality Staffing plan and budget for projects
- Oversees Budget for all projects and directs manpower adjustments as needed.
- Participates in Interviews, Annual Reviews and disciplining and rewarding of responsible professionals.
- Oversees the project budget for Quality Department
- Responsible for weekly reporting to Sr. Mgmt. on Project Quality Related information.
- Is fluent in requirements regarding inspection, inspection tools and equipment.
- Facilitates and supports the Project non-conformances related to the work.
- Works with Subcontractors on Quality related issues.
- Completes and reports random oversight inspections when on site
- Works with Contractors on quality of work and conforming and to FQCP requirements.
- Investigates any NCRS/CARS with SQM.
- Provides Input and oversight, run them to closure verifies corrections, implementation and completes and required training.
- Work with project team on QC and testing requirements/CITP and checklist development.
- Facilitate monthly all hands training meetings
- Facilitate Train the Trainer program and Safety Reports.
- Review Contracts for technical scope and understanding of Quality Requirements
- Communicate any concerns related to scheduling, subcontractors, and all quality related issues to SQM or Sr. Quality Management.
- Development implement and maintain continuous improvement or lessons learn program for Quality Dept.
- Assist in Audits, Processes development and QMS infrastructure build out.
- Review and approve all weekly Project reports.
- Hold all necessary quality meetings internal and external.
- Develop Department Annual training schedule and complete that training.
- Review and Approve quality procedures and supporting documentation to communicate accurately and consistently across all projects
- Communicate any revision to procedures and support development of standard operating procedures.
- Prepare QIR, NCR, PCAR, RFI's, and Root Cause Analysis, as necessary.
- Provide technical support and guidance to Site Quality Manger and drive problem resolution to team as needed.
- Maintain a clean and operational vehicle.
- Communicate any damage, maintenance, or inspections to director immediately.
- Arrive to work prepared to work and dressed appropriately.
- Always maintain a positive attentive attitude towards all co-workers and construction teams.
- Review and submit department time and per diem sheets and collect receipts every other Friday prior to payroll.
- Check email daily and respond in a timely manner.
- Work independently and as a member of the team.
Supervisory Responsibilities
Manages and Supports Project Quality Staff. Reviews/Approves the hours worked by the QA department.
Education and/or Work Experience Requirements
- 7 years verifiable Quality Management experience or 4-year degree in construction.
- OSHA 30 or NCCER STS-C
- NFPA 70 E
- ASQ CQM/OE Certification
- Proficient in Microsoft office (Excel/Word and PowerPoint)
- Understands current technology practices and deployment uses.
- Clear understanding of OSHA safe workplace practices and procedures.
- Ability to read and understand construction drawings.
- Ability to read and understand electrical single-line and three-line diagrams.
- Ability to read and understand manufacturer installation standards.
- Must have the ability to travel, work on-call during off shift hours and weekends.
Physical Requirements/Work Environment
Work is completed both in the field and in an office environment. This position works in an outdoor environment and must tolerate all seasons' weather; requires 100% travel across multiple states on an as-needed basis. Must be able to comply with all safety standards and procedures. Personal protective equipment is required (included but not limited to hard hat, proper footwear, rubber insulated gloves, safety glasses). Must be able to sit, stoop, kneel, bend, stand, or walk short to long distances for 8-10 hours a day. Must be able to lift, push, or pull up to 50 pounds on an occasional basis.
Obvyklá mzda u podobných pozic
OdhadProstřední polovina mezd inzerovaných na Rejobs v této skupině za posledních 24 měsíců. Zaměstnavatel mzdu neuvedl.
O této pozici
O společnosti Strata Clean Energy
Přehled společnosti
Strata Clean Energy (do roku 2021 Strata Solar), soukromá firma ve vlastnictví svých zakladatelů
Durham, Severní Karolína, USA
2008
Více než 600 zaměstnanců (2026)
Čím se zabývá
Strata Clean Energy je plně integrovaná firma v oblasti energetické infrastruktury, která pracuje pro energetické společnosti, nezávislé výrobce elektřiny (IPP) a hyperscalery. Její hlavní činnosti zahrnují vývoj projektů na klíč, projektování, nákup a výstavbu (EPC), vlastnictví a správu aktiv, provoz a kapitálové trhy. Prostřednictvím dceřiné společnosti Power Generation Solutions, LLC (PGS) navíc dodává EPC služby pro rozvodny v přenosu a distribuci elektřiny.
Podle vlastních údajů má 3,6 GW instalovaného solárního výkonu a 1,8 GW instalovaného výkonu úložišť a 9 GW projektů v aktivním vývoji. Tam, kde se potkává možnost připojení k síti, pozemky, dostupnost plynu a odběr a kde je spolehlivý výkon pro životaschopnost projektu nezbytný, doplňuje své integrované platformy o výrobu elektřiny z plynu, přičemž obnovitelné zdroje zůstávají v centru.
Projekty a reference
Markus a Cathy Wilhelmovi firmu založili v roce 2008, původně pod názvem Solar Tech South. V roce 2011 dokončila v Severní Karolíně svou první elektrárnu o výkonu 5 MW, o rok později projekt o výkonu 50 MW a do osmi let překonala 1 GW instalovaného solárního výkonu. V roce 2018 založila divizi bateriových úložišť a od té doby vyvinula projekty úložišť o kapacitě téměř 5 GWh. Celkem dovedla ke komerčnímu využití zhruba 240 projektů a postavila více než 285 solárních a bateriových zařízení po celých USA.
U projektu Scatter Wash v okrese Maricopa v Arizoně vedla Strata vývoj, výstavbu i správu samostatného bateriového úložiště o kapacitě 1 020 MWh a obě jeho fáze byly uvedeny do provozu v roce 2025. V letech 2020 a 2021 vyvinula projekt Ventura Energy Storage nedaleko města Oxnard v Kalifornii, baterii o výkonu 100 MW a kapacitě 400 MWh. U projektu Bookers o výkonu 144 MW ve městě Farnham ve Virginii pomohla společnosti Dominion Energy splnit cíle pro výrobu a výkon na pozemku, kterému by se většina developerů vyhnula.
Novinky
V září 2025 koupila společnost GridStor od firmy Strata bateriový projekt White Tank o výkonu 100 MW a kapacitě 400 MWh v Arizoně, který má být uveden do provozu v první polovině roku 2027; Strata bude projektu radit až do zahájení komerčního provozu. V březnu 2026 uzavřela společnost FTC Solar se Stratou pětiletou smlouvu na dodávky trackerů o objemu 1 GW.
V dubnu 2026 Strata oznámila další vývoj svého vertikálně integrovaného modelu: překračuje svou tradiční roli ve vývoji solárních projektů a úložišť a posiluje svou pozici plně integrované energetické platformy. V červenci 2026 navýšila svůj revolvingový úvěrový a akreditivní rámec o 150 mil. USD, z 300 mil. USD na 450 mil. USD.
Práce ve firmě
Ve firmě Strata pochází 25 % zaměstnanců z armády a firma se zavázala přijímat veterány na všech úrovních. Všichni, kdo vedou pohovory, procházejí školením proti předsudkům a firma nabírá lidi mimo jiné na historicky černošských vysokých školách (HBCU), na vojenských základnách, v profesních sdruženích a v programech pro opětovné začlenění do společnosti. Každý zaměstnanec má ročně 8 placených hodin na dobrovolnickou práci pro jakoukoli komunitní nebo neziskovou organizaci.
Provoz a údržbu zajišťuje více než 180 odborníků na O&M na plný úvazek a nepřetržitý monitoring 24/7 z centra Remote Operations Center. V roce 2025 vykázala divize O&M celkovou míru evidovaných úrazů (TRIR) 0,00 a ve výstavbě činila TRIR 0,37.