Rejobs
Nordex

Project Manager - Grid Code Development

Become a Project Manager at Nordex in Chennai, India, overseeing Grid Code Compliance projects. Manage budgets, timelines, and quality standards while collaborating with interdisciplinary teams. Enjoy a dynamic work environment and the opportunity to influence wind turbine integration across global markets.
Nordex
Nordex
Chennai, Tamil Nadu, India On-site Full Time UTC+05:30

Nordex

Company Overview

Nordex SE

Hamburg, Germany

1985

Over 10,900 employees worldwide (Source: linkedin.com). Revenue of over 5.7 billion euros in 2023 (Source: renewable-energy-industry.com).

What They Do

Nordex focuses exclusively on onshore wind turbines in the 4 to 6 MW+ class. The company develops, manufactures, installs, and maintains these turbines through integrated processes that include design, precision engineering, rotor blade and tower production, logistics, turnkey installation, and complete lifecycle maintenance (Source: windindustry-in-germany.com). The core platform Delta4000, introduced in 2017 with the N149/4.X, offers flexible power ratings (4-6 MW) and rotor diameters of up to 175 meters. This platform is optimized for various wind conditions and extreme climates (Source: nordex-online.com). The products cater to various customer segments, including utilities, independent power producers, and community wind projects, providing tailored solutions for site-restricted or grid-limited locations with lifespans of up to 35 years.

Projects & Track Record

In Germany, Nordex has commissioned 8,653 MW of onshore wind power plants, with 4,946 MW under construction, including the first wind farm in Hamburg featuring N27/150 turbines that have been operational for over 32 years (Source: nordex-online.com). A prototype of the N175/6.X on a 179 m high hybrid tower in Santow, Mecklenburg-Vorpommern, is in pre-series, with installation scheduled for September 2025 and commissioning between October 2025 and January 2026 (Source: nordex-online.com). Globally, Nordex supplies over 52 GW of installed turbines in 85% of markets outside China, with about 1 GW in Canada, including the N163/5.X, N163/6.X, and N175/6.X cold climate models (Source: windindustry-in-germany.com). Key customers include Bürgerwind Hollich GmbH & Co. KG and Energieversorgung Mittelrhein (evm), who engage in long-term partnerships for turnkey projects and maintenance.

Recent Developments

In the past two years, Nordex secured significant contracts in Germany, including 107 MW repowering in North Rhine-Westphalia for Bürgerwind Hollich with 12 N163/6.X on 164 m high hybrid towers (Source: renewable-energy-industry.com). Additional contracts include 21 MW from BMR energy solutions for the "Heinz" site and 77 MW for the Schneifelhöhe wind farm (Source: renewable-energy-industry.com). Milestones include the commissioning of 2,202.2 MW in Germany in the first half of 2025 and the launch of series production of hybrid towers in April 2025 (Source: nordex-online.com). The merger with Acciona Windpower in 2016 remains a key expansion, with no further acquisitions or funding rounds mentioned in the latest sources.

Working There

Nordex employs over 10,900 people in various fields, including development, production, project management, installation, logistics, sales, and service (Source: nordex-online.com). The company culture emphasizes decentralized regional operations for customer proximity and continuous training for technicians to global standards. Training is provided through the Nordex Academy, which includes GWO certifications and practical training on Delta4000 simulators (Source: nordex-online.com). Hiring occurs at the locations in Hamburg and Rostock as well as in production facilities in several countries, with increasing demand for installation and service technicians in North Rhine-Westphalia and Rhineland-Palatinate (Source: renewable-energy-industry.com).

Contact


Last updated on 2026-02-12 | Report an issue

Job Description

Manage and coordinate multiple development projects related to Grid Code Compliance, ensuring budget, timeline, and quality standards are met.

  • Analyze regulatory requirements for wind turbine grid integration in different global markets (e.g., Canada, Australia, Germany, Spain).
  • Collaborate with interdisciplinary teams (Electrical, Software, Mechanical Engineering) to ensure technical feasibility and proper implementation of compliance requirements.
  • Oversee the development process from initial concept to serial production, including prototyping, testing, and certification.
  • Coordinate prototype tests and validation processes to ensure compliance with new market regulations.
  • Align project scope and schedules with other project managers and report progress to the Program Director of Turbine Serial Development.
  • Manage stakeholder communication with Sales, Engineering, Operations, and Regulatory Authorities to ensure project alignment and smooth execution.
  • Identify and mitigate project risks related to grid compliance regulations and technical implementations.
  • Support the integration of grid compliance updates into existing and new turbine platforms, ensuring seamless transition into production.

Your Profile

  • Degree in Electrical Engineering
  • Project Management experience required (PM certification preferred).
  • Several years of experience in wind turbine industry, preferably on electrical and control functions.
  • Very good MS office skills (including MS Project Server).
  • Experience in an ERP and PLM system advantageous.
  • Preferred experience in the wind power industry
  • 5+ years of relevant experience in PM role.

Nordex adheres to a policy of equal employment opportunity. All employment decisions are made without regard to religion, age, sex, color, national origin, handicap, or other protected class and are in full compliance with all federal and state laws.

Apply now

Job expired?

Please let Nordex know you found this job on Rejobs. This will help us grow and get more people to work on renewable energy!

Discover how you’re connected

View connections

See your contacts at Nordex on LinkedIn to leverage your network in applying for this position.

About the role

February 13, 2026

Full Time

Company

February 16, 2026

On-site

Wind Energy

Nordex

nordex-online.com

  •  Chennai, Tamil Nadu, India

5+ years in project management, preferably in the wind turbine industry

UTC+05:30

Get Job Alerts

Get alerts for Electrical Engineering jobs in Chennai, Tamil Nadu, India

Join Talent Pool

Let top clean energy employers find you