Snowy Hydro Limited

Commercial Manager

Join Snowy Hydro as a Commercial Manager in Cooma, Australia, leading contract negotiations and managing claims for the Snowy 2.0 renewable energy project. Benefit from a relocation package or FIFO options while shaping Australia's energy future.
Snowy Hydro Limited
Snowy Hydro Limited
Cooma, Australia Hybrid Full time UTC+10:00

Snowy Hydro Limited

Company Overview

Snowy Hydro Limited

NSW, Australia

1949

Approximately 1,000-5,000 employees (source: leadiq.com). Snowy Hydro is a wholly-owned Commonwealth company with no public revenue data available for 2023 or later.

What They Do

Snowy Hydro's core technology focus is on pumped hydro-electricity, gas-fired peaking, diesel peaking, and contracted wind and solar renewables. The company operates 16 power stations and one pumping station, boasting a total generating capacity of over 5,500 MW dispatched to the National Electricity Market (source: snowyhydro.com.au). The Snowy Mountains Hydro-electric Scheme, which is a significant part of their operations, features nine hydro-electric power stations and 16 dams linked by 145 km of tunnels and 80 km of aqueducts, primarily located in Kosciuszko National Park. Additionally, Snowy Hydro manages water storage and diversion under the Snowy Water Licence for irrigation to the Murray and Murrumbidgee systems (source: wikipedia.org).

Projects & Track Record

Snowy Hydro has a rich history of notable projects, including the original Snowy Mountains Hydro-electric Scheme, which was completed in 1974 and delivered a total output of 3,740 MW from seven power stations, such as Guthega, which began operations in 1955 (source: snowyhydro.com.au). The company also operates significant gas assets, including the Colongra Power Station (667 MW, acquired in 2015), Laverton North (320 MW), and Latrobe Valley (300 MW) in Victoria, along with three diesel stations in South Australia totaling 136 MW (source: wikipedia.org). Currently, major projects include Snowy 2.0, which aims to link the Tantangara and Talbingo dams via a 27 km underground tunnel and establish a new pumped-hydro station for 2,000 MW generation and 175 hours of storage, with construction having commenced in 2019 (source: snowyhydro.com.au).

Recent Developments

In March 2018, the Australian Government acquired full ownership of Snowy Hydro by purchasing shares from New South Wales and Victoria, solidifying its status as a wholly-owned Commonwealth entity (source: snowyhydro.com.au). The construction of Snowy 2.0 is a significant advancement in the company's portfolio, marking it as a nation-building pumped-hydro project that commenced in 2019 (source: snowyhydro.com.au). Additionally, Snowy Hydro has secured contracts for over 1,000 MW from ten wind and solar projects, enhancing its renewable energy offerings (source: leadiq.com).

Working There

Snowy Hydro offers a diverse range of roles across various departments, including generation (hydro, gas, diesel operations), engineering, construction, and retail services through brands like Red Energy and Lumo Energy. The company also has opportunities in support functions such as IT, HR, and finance, with hiring occurring at their headquarters in Cooma, the Sydney office, and various project sites across New South Wales and Victoria (source: leadiq.com). The company culture emphasizes community support and has a long history of integrating a multinational workforce, with 65% of the original workforce being migrants from over 30 nations (source: nma.gov.au). While specific benefits are not detailed in available sources, the company is known for its commitment to customer service excellence through its retail brands (source: leadiq.com).


Last updated on Feb 23, 2026 | Report an issue

Job Description

Step into a career that's as big as Australia's energy future! Snowy 2.0 is more than a project-it's the nation's largest renewable energy initiative, expanding the iconic Snowy Scheme to deliver reliable power and critical energy storage. As part of the client-side Owner's Team, we lead the charge, working hand-in-hand with delivery partners and stakeholders to make Snowy Hydro's vision of a sustainable, reliable energy future a reality.

About the position

We're looking for Commercial Managers to take a key leadership role on the Snowy 2.0 Project. You'll oversee all commercial and contractual aspects, managing relationships, ensuring compliance, and strategically navigating claims, variations, and negotiations. This is your chance to make a real impact on one of Australia's most ambitious infrastructure projects.

The role is based in Cooma, with a generous relocation package for those ready to move. Can't relocate? A FIFO (5:2) roster will also be considered for the right candidate.

Key Responsibilities

  • Lead Contract Negotiations - Use your Quantity Surveying and Cost Management expertise to drive high-impact negotiations with contractors on claims and variations, safeguarding Snowy Hydro's interests and project objectives.
  • Build Stakeholder Partnerships - Develop and maintain strong relationships with internal teams, contractors, and stakeholders to ensure seamless project delivery.
  • Manage Subcontract Variations - Serve as the go-to contracts expert, managing subcontract variations with clarity, precision, and consistent communication.
  • Resolve Claims and Variations - Strategically balance risk, opportunity, and long-term project goals when resolving claims and variations.
  • Ensure Compliance - Maintain legal, regulatory, and contractual compliance to reduce risk and support proactive decision-making.
  • Risk Management - Identify, assess, and mitigate risks linked to claims, variations, and commercial issues before they escalate.
  • Commercial Reporting & Insights - Provide actionable insights and reporting to senior leadership, translating complex commercial and cost data into strategic guidance.
  • Drive Continuous Improvement - Streamline processes, drive efficiency, and embed best-practice contract and cost management across the team.
  • Team Leadership & Mentorship - Mentor and guide team members, fostering a collaborative, high-performing commercial and contracts culture.

About the location

This role is based in Cooma with FIFO and DIDO options available.

About you

You hold a Bachelor's or Master's degree in Quantity Surveying, Construction Management, Engineering, Law, or a related discipline, backed by extensive senior-level experience in contract administration or management. You've built a strong record managing claims and variations on major projects, with exceptional expertise in Quantity Surveying and/or Cost Engineering - particularly in cost management and forecasting.

About our workforce

At Snowy 2.0, we live by "One Team Working Together." If you thrive on problem-solving, love a challenge, and want to make a real difference, this is your chance to join a team shaping the future of renewable energy. Come be part of one of Australia's most iconic infrastructure projects-apply now and start your Snowy story!

Apply now

Job expired?

Please let Snowy Hydro Limited know you found this job on Rejobs. It helps us grow and get more people working in renewable energy.

About the role

June 24, 2026

Full time

Company

June 24, 2026

Hybrid

Hydropower , Energy Storage

Snowy Hydro Limited

snowyhydro.com.au

  •  Cooma, Australia

Senior-level experience in contract administration or management

UTC+10:00