Rejobs
Enel
Enel
148 open jobs · Posted 49 days ago

Internship: Enel Grids Iberia, Medium and Low Voltage Network Planning

Join Enel in Sevilla as an intern in medium and low voltage network planning. This role involves learning network analysis methods and scenario building to support grid access for new clients. Enjoy a 900€ monthly stipend, a 35-hour workweek, and online master’s training. Ideal for recent electrical or industrial engineering graduates.

Salary
From €900/mo
Location
Seville, Spain
Workplace
Hybrid
Job type
Internship
Applies on jobs.enel.com

Check your inbox.

On a phone? Apply from a computer later.

En Endesa tenemos un firme compromiso con la formación y captación del talento. Por eso ofrecemos un Plan de Becas a recién titulados/as universitarios que quieran formar parte de un modelo de aprendizaje colaborativo orientado a adquirir competencias profesionales.

Para esta beca, buscamos personas recién graduadas en Ingeniería industrial eléctrica o similar o que estén a falta de su TFG, para incorporarse a través de una beca al departamento de Planificación Técnica de la Red de Media y Baja Tensión Sur en Sevilla.

¿Qué hace la Unidad?

El área de Planificación Técnica de la Red de Media y Baja Tensión se encarga de realizar las tareas propias para la planificación de la red de E-Distribución.

¿En qué colaborarás?

Tus principales actividades serán las siguientes:

  • Aprender la metodología utilizada en el proceso de análisis del comportamiento previsto de la red de distribución de MT y aprender a construir escenarios de estudio para determinar capacidad de acceso a red para nuevos clientes.

¿Qué formación y conocimientos van a ser considerados?

  • Grado en Ingeniería Eléctrica/ Industrial o similar
  • MS Office (Outlook, Teams, Word, Excel, PowerPoint y Access)

Conocimientos valorables:

  • Modelo de Sistemas e Instalaciones eléctricas. Manejo de programas de simulación de redes eléctricas, lenguaje de programación (Phyton, Visual Basic, Oracle...) MS Power BI, Power Query, Conocimiento de librerías de Python para cálculo de redes eléctricas (psspy, pandapower, etc...)

¿Qué ofrecemos?

Prácticas en ENDESA, Programa SWING:

  • Ayuda de estudio de 900,00 € brutos mensuales.
  • Horario: Jornada 35 horas semanales (Lunes a Viernes)
  • Centro de trabajo en España: Av/de la Borbolla nº 5

Las becas de Endesa tienen una duración de 9 meses. Constan de dos partes, una Formación Práctica en la Empresa y una Formación Académica.

La Formación Práctica en la Empresa tendrá una jornada completa de lunes a viernes, un periodo de descanso de 22 días laborables al año y una ayuda al estudio de 900€ brutos. De forma paralela, se realiza la Formación Académica: Máster en Gestión Organizacional, Competencias Clave y Analítica de Datos, de la Universidad Camilo José Cela (120 ECTS), en formato online, cuyo objetivo principal es el aprendizaje y la mejora del perfil competencial.

Si crees que esta beca supone una oportunidad de desarrollo para ti, ¡no dudes en postularte!

Para completar tu candidatura, sigue estos 2 pasos:

  1. Inscríbete en esta oferta a través de esta plataforma.
  2. Regístrate en Talentoteca, en el apartado "Ofertas para estudiantes de Postgrado", para poder participar en el proceso de selección.

🔗 Talentoteca - Endesa.

Importante: Es necesario completar ambos pasos para que podamos gestionar correctamente tu candidatura. Las ofertas de prácticas se tramitan a través de la Fundación Univesidad Empresa (FUE), y su plataforma Talentoteca, por lo que el registro en esta plataforma es un requisito para continuar en el proceso de selección.

¡Te esperamos!

"La innovación, la confianza, la proactividad y la responsabilidad son el alma de nuestra organización. Nos respetamos y celebramos nuestra diversidad. Contamos con todas las personas, independientemente de sus capacidades, edad, sexo, raza o género".

Pay & benefits

From €900 /mo

About this role

Posted
30 Sep 2026
Timezone
UTC+01:00
Experience
Junior
Employer enel.com LinkedIn Enel

About Enel

Company overview

Enel S.p.A., listed on Euronext Milan since 1999 and 23.6% owned by Italy’s Ministry of Economy and Finance (end of 2025)

Rome, Italy

1962

About 62,300 employees (September 2026); revenue of €80.3 billion in 2025

What they do

Enel runs 1.9 million kilometres of distribution grid and supplies energy and services to 54 million people, with a presence in 27 countries. In its retail markets it serves households, businesses and public bodies, from electricity supply to charging systems for electric vehicles.

At the end of September 2026 the group had 93.2 GW of installed capacity, including capacity held through joint ventures. In 2025 it generated 200.3 TWh of electricity, counting non-consolidated plants, of which 142.3 TWh came from renewable sources. Enel aims to reach net-zero direct and indirect emissions by 2040.

Its renewables company, Enel Green Power, manages more than 1,400 power plants with 67 GW of wind, solar, hydroelectric and geothermal capacity, and has assets in operation or under construction in 19 countries. In the US and Canada, Enel North America has over 11 GW of installed wind and solar capacity, over 1 GW of energy storage and nearly 5 GW of demand response.

Projects and track record

Enel was founded in 1962 as Italy’s National Electricity Board, after a law brought almost all of the country’s electricity generation, transmission and distribution into a single entity. It built Italy’s largest hydroelectric plant, at Entracque in the province of Cuneo, as well as Italy’s first grid-connected concentrated solar power plant and the country’s first photovoltaic plant and first wind farm.

In 2001 Enel installed the world’s first smart meters, which for the first time let energy utilities read consumption remotely. Its acquisition of Spain’s Endesa gave it a major presence in Spain and Latin America.

Recent developments

In November 2025 Enel North America completed GulfStar, its largest power plant in the US: a 556 MWdc solar plant in Wharton County, Texas, co-located with a 355 MWdc battery storage system. Over 2025 Enel also added 1.1 GW by buying 34 hydropower plants and a portfolio of wind farms in Spain, 2 wind farms in Germany and 2 more in the United States. Its Brindisi and Torrevaldaliga Nord coal-fired plants in Italy, with 3,680 MW of capacity, lost the possibility of using coal at the end of 2025.

In February 2026 Enel presented its 2026-2028 strategic plan, with about €53 billion of gross investment, around €10 billion more than the previous plan. Around €20 billion is earmarked for renewables, to add about 15 GW of new capacity, and over €26 billion for grids, about 55% of it in Italy. In September 2026 Enel closed the purchase of US solar plants with 810 MWdc of capacity from Excelsior Energy Capital, for about 760 million US dollars.

Working there

Enel’s career areas include Renewable Energies, which looks for energy in wind, water, the sun and the heat of the Earth, and Grids and Innovability, which works on smart grids and the electrification of consumption. Others are Energy and Commodity Management, ICT (AI, big data, IoT, cloud and cybersecurity) and Administration, Finance and Control. Candidates who find no matching job can send a spontaneous application.

Benefits are provided according to local conditions and include remote working and continuous learning, healthcare assistance, insurance policies and supplementary pension funds. Enel’s internships typically last 4 to 6 months and are aimed at students on university degree and master’s courses.

More grid and utilities jobs like this

Internship: Enel Grids Iberia, Medium and Low Voltage Network Planning
Enel · From €900/mo