Not seeing the right role? Join our talent pool
About Nadara
Company overview
Nadara Limited, formed in 2024 from Renantis and Ventient Energy, both backed by infrastructure funds managed by J.P. Morgan Asset Management
Edinburgh, United Kingdom
2024
More than 900 employees (2026)
What they do
Nadara develops, owns and operates renewable energy sites across Europe and the US. It owns and operates 200 sites in 10 countries, and its installed capacity makes it one of the largest renewable power producers in Europe.
Nadara has more than 4.3 GW of renewable energy assets and an 18 GW pipeline across six core countries. In 2024, its sites produced 9,276 GWh of renewable energy from wind, solar and biomass.
Projects and track record
Nadara has operated in the UK since 2005, with assets in England, Scotland and Wales, and runs 44 onshore wind farms there with more than 1 GW of installed capacity, including some of the country’s earliest. In Portugal, it has operated wind energy sites since 2000 and holds a portfolio of almost 1 GW. In France, it has generated renewable energy since 2009 and is investing to unlock repowering potential.
In the US, Nadara delivered 16 operational utility-scale sites of small to mid size, with a total capacity of 250 MW. In Spain, its 443 MW Madrid A+B hybridisation project combines wind and solar generation across five sites in Valladolid and Palencia.
Recent developments
In January 2026, Nadara acquired Talveg, a France-based wind turbine service provider, bringing 20 experienced turbine maintenance specialists into its expanding Asset Maintenance team. In May 2026, it signed its largest ever power purchase agreement with Trafigura, covering five solar PV and six wind assets in Spain that total 434 MW. The solar plants of its Spanish hybridisation project, which it is building with Grupotec and Voltalia, are expected to be operational in December 2026.
In July 2026, Nadara closed a pan-European refinancing of about EUR 1.2 billion. In September 2026, it completed Big Fish, Italy’s largest agrivoltaic plant: a 227 MW project made possible by a 156 MW power purchase agreement with Amazon. On 30 September 2026, it completed the sale of its entire stake in Vector Renewables to Algebris Green Transition Fund.
In the UK, Argyll and Bute Council’s Planning Committee approved Nadara’s plans in September 2026 to replace the turbines at Beinn Ghlas Wind Farm with up to seven modern turbines, quadrupling its installed capacity. In October 2026, Nadara acquired the 48 MW Bettyhill Phase 2 Wind Farm in the Scottish Highlands from Eden Renewables, and will finance, build and operate it.
Working there
Nadara’s Milan-based team of over 500 colleagues is its largest national presence, and over 100 colleagues are based at its Lisbon office. Its teams are a mix of on-site and remote, and staff can take paid volunteering days and join team sporting events.
Nadara warns that scammers impersonate it to offer fake jobs, often through Zoom interviews and lookalike domains such as nadarausa.com. Its invitations to interview always come from its Workday platform or an official Nadara email address.