Rejobs

Renewable energy jobs at East Point Energy

1 open role, 1 added this week.

Charlottesville 11–50 employees Energy storage eastpointenergy.com
Alert me to new jobs here
East Point Energy
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
1 job · 1 filter active · updated 1 days ago

About East Point Energy

Company Overview

Name

East Point Energy, a wholly owned subsidiary of Equinor (source: eastpointenergy.com)

Headquarters

Charlottesville, United States

Founded

2018

Size

Approximately 40 employees (source: linkedin.com)

What They Do

East Point Energy specializes in the development, construction, ownership, and operation of grid-scale battery energy storage systems designed to support a cleaner, more resilient, and affordable electric grid (source: eastpointenergy.com). Their core focus is on standalone, front-of-the-meter battery storage assets that serve wholesale and utility power markets across the United States (source: businesswire.com). In 2024, East Point launched a Project Acquisition Program targeting standalone energy storage, solar, and solar-plus-storage projects primarily in ERCOT, PJM, NYISO, and ISONE markets, reflecting their strategy as both a developer and independent power producer (source: businesswire.com). Their competitive advantage lies in combining specialized large battery storage development expertise with the capital and operational scale of their parent company, Equinor, which in 2022 reported an early-stage pipeline of 4.1 GW focused on the U.S. East Coast (source: equinor.com).

Projects & Track Record

East Point Energy’s portfolio includes several notable grid-scale battery storage projects across Texas and Virginia. The Sunset Ridge Energy Center in Frio County, Texas, is a 10 MW / 20 MWh facility that began construction in early 2024 and has since become operational (source: businesswire.com). Another flagship asset is the Citrus Flatts Energy Center in Cameron County, Texas, a 100 MW / 200 MWh project that became East Point’s second operational Texas facility in 2026 and is capable of powering tens of thousands of homes for two hours at peak output (source: businesswire.com). In Virginia, East Point developed the Dry Bridge Energy Center Battery Storage Project in Chesterfield County, a 20 MWac / 80 MWh facility owned by Dominion Energy Virginia, which was the largest operational project in the state as of 2023 (source: eastpointenergy.com). Additional projects include the Shands Energy Center Battery Storage Project in Sussex County, Virginia at 15.7 MWac / 62.8 MWh and the Brokenburg Battery Energy Storage System in Spotsylvania, Virginia at 2 MWac / 8 MWh for Rappahannock Electric Cooperative (source: eastpointenergy.com). East Point also holds conditional use and siting approvals for the Hermon Energy Center in Chesterfield County and the James and Quarry Energy Centers in Lynchburg, indicating a growing development footprint in Virginia (source: eastpointenergy.com).

Recent Developments

In April 2024, East Point Energy announced the start of construction for the Sunset Ridge Energy Center and the final investment decision for the Citrus Flatts Energy Center in Texas, marking significant milestones in their project pipeline (source: businesswire.com). By September 2026, Citrus Flatts was completed and became the company’s second operational project in Texas (source: businesswire.com). The launch of a Project Acquisition Program targeting standalone energy storage, solar, and solar-plus-storage projects in key U.S. markets further demonstrates East Point’s growth strategy (source: businesswire.com). In December 2023, the company highlighted the operational status of the Dry Bridge project in Virginia, which it had developed and sold to Dominion Energy Virginia in 2021 (source: eastpointenergy.com). Community engagement efforts include a $175,000 donation for improvements to the Harlingen Soccer Complex linked to the Citrus Flatts project and participation in the Green Business Alliance, a Community Climate Collaborative initiative in Charlottesville (source: eastpointenergy.com).

Working There

East Point Energy employs approximately 40 people, with roles spanning development, project acquisition, construction, operations, permitting, and project finance, reflecting the company’s focus on grid-scale energy storage project delivery (source: linkedin.com). The company’s headquarters is located in downtown Charlottesville, Virginia, with active project sites in Texas and Virginia, indicating a geographically diverse operational footprint (source: eastpointenergy.com). Publicly available materials emphasize a culture centered on utility-scale impact, grid reliability, and project development rather than broad corporate messaging, suggesting a focused and mission-driven work environment (source: indeed.com).

Last updated Sep 18, 2026 · Report an issue

Not seeing the right role? Join our talent pool