Rejobs

Renewable energy jobs at Titan Wind Energy

1 open role, 1 added this week.

Cuxhaven 251–500 employees Energy storage titan-wind.de
Alert me to new jobs here
Titan Wind Energy
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
1 job · 1 filter active · updated today

About Titan Wind Energy

Company Overview

Name

Titan Wind Energy (Germany) GmbH, a 100% subsidiary of Titan Wind Energy (Europe) A/S

Headquarters

Cuxhaven, Germany

Founded

2005

Size

The company plans to employ more than 600 people in Cuxhaven once the production facility is fully operational (source: linkedin.com)

What They Do

Titan Wind Energy (Germany) GmbH specializes in manufacturing XXL monopiles for offshore wind turbines and operates a state-of-the-art production facility in Cuxhaven with direct access to the port (source: titan-wind.de). The company is part of the Chinese Titan Wind Energy Group, which focuses on wind energy components such as towers, rotor blades, and foundation structures (source: linkedin.com). The Cuxhaven facility features an integrated production chain from plate reception through rolling, welding, non-destructive testing, surface treatment, to loading at the quay (source: offshorewind.biz). With a planned annual output of around 200 XXL monopiles measuring up to 14 meters in diameter and 140 meters in length, Titan positions itself as a key supplier for offshore wind projects in the North Sea, Baltic Sea, and the USA (source: offshorewind.biz).

Projects & Track Record

Titan Wind Energy’s entry into the German market began in 2019 with the acquisition of the former AMBAU factory in Cuxhaven, preserving 36 jobs and laying the foundation for offshore foundation manufacturing (source: goerg.de). The current flagship project is the construction of the XXL monopile factory in Cuxhaven, with an investment of up to 300 million euros, ramping up from 2025 and aiming for first deliveries by summer 2026 (source: pes.eu.com). The production area covers approximately 750,000 square meters including manufacturing and storage spaces, positioning Titan as one of Europe’s largest offshore wind foundation manufacturers (source: titan-wind.com). Partnerships with companies like ESAB for welding and handling technology highlight the high level of automation at the facility (source: linkedin.com).

Recent Developments

In June 2024, Titan announced the final investment decision for the Cuxhaven monopile factory with capital expenditure of up to 300 million euros, creating over 600 jobs (source: linkedin.com). In January 2026, a contract was signed with ESAB for the delivery of welding and handling equipment, considered key technology for production (source: offshorewind.biz). The facility is expected to be completed by early 2027, with production designed for approximately 350,000 tons of steel foundations annually (source: linkedin.com).

Working There

Titan Wind Energy (Germany) GmbH offers diverse employment opportunities in Cuxhaven across production, maintenance, and operations, including roles such as industrial locksmiths for mechanical maintenance (source: titan-wind.de). The company culture is characterized by internationality, innovation, and teamwork, with a focus on industrial manufacturing and growth (source: titan-wind.de). Active local recruitment and invitations to apply directly via email demonstrate a committed local hiring approach supporting the expansion of the production facility (source: titan-wind.de).

Last updated Oct 4, 2026 · Report an issue

Not seeing the right role? Join our talent pool