About Titan Wind Energy
Company Overview
Titan Wind Energy (Germany) GmbH, a 100% subsidiary of Titan Wind Energy (Europe) A/S
HeadquartersCuxhaven, Germany
Founded2005
SizeThe company plans to employ more than 600 people in Cuxhaven once the production facility is fully operational (source: linkedin.com)
What They Do
Titan Wind Energy (Germany) GmbH specializes in manufacturing XXL monopiles for offshore wind turbines and operates a state-of-the-art production facility in Cuxhaven with direct access to the port (source: titan-wind.de). The company is part of the Chinese Titan Wind Energy Group, which focuses on wind energy components such as towers, rotor blades, and foundation structures (source: linkedin.com). The Cuxhaven facility features an integrated production chain from plate reception through rolling, welding, non-destructive testing, surface treatment, to loading at the quay (source: offshorewind.biz). With a planned annual output of around 200 XXL monopiles measuring up to 14 meters in diameter and 140 meters in length, Titan positions itself as a key supplier for offshore wind projects in the North Sea, Baltic Sea, and the USA (source: offshorewind.biz).
Projects & Track Record
Titan Wind Energy’s entry into the German market began in 2019 with the acquisition of the former AMBAU factory in Cuxhaven, preserving 36 jobs and laying the foundation for offshore foundation manufacturing (source: goerg.de). The current flagship project is the construction of the XXL monopile factory in Cuxhaven, with an investment of up to 300 million euros, ramping up from 2025 and aiming for first deliveries by summer 2026 (source: pes.eu.com). The production area covers approximately 750,000 square meters including manufacturing and storage spaces, positioning Titan as one of Europe’s largest offshore wind foundation manufacturers (source: titan-wind.com). Partnerships with companies like ESAB for welding and handling technology highlight the high level of automation at the facility (source: linkedin.com).
Recent Developments
In June 2024, Titan announced the final investment decision for the Cuxhaven monopile factory with capital expenditure of up to 300 million euros, creating over 600 jobs (source: linkedin.com). In January 2026, a contract was signed with ESAB for the delivery of welding and handling equipment, considered key technology for production (source: offshorewind.biz). The facility is expected to be completed by early 2027, with production designed for approximately 350,000 tons of steel foundations annually (source: linkedin.com).
Working There
Titan Wind Energy (Germany) GmbH offers diverse employment opportunities in Cuxhaven across production, maintenance, and operations, including roles such as industrial locksmiths for mechanical maintenance (source: titan-wind.de). The company culture is characterized by internationality, innovation, and teamwork, with a focus on industrial manufacturing and growth (source: titan-wind.de). Active local recruitment and invitations to apply directly via email demonstrate a committed local hiring approach supporting the expansion of the production facility (source: titan-wind.de).
Not seeing the right role? Join our talent pool